Skip to content
Kwsa Madziro Anofamba by Leva Engineering

Kwsa Madziro Anofamba by Leva Engineering is a highly esteemed winner of the very prestigious 2025 Mubairo weSirivha we A' Design Award in Kuiswa Kunoshandira Pamwe, kweRuzivo nekweKupinda Mukati Competition Category.


SirivhaKuiswa· 2025

Kwsa Madziro Anofamba

by Leva Engineering

Client: Leva Engineering

Mubairo weSirivha we A' Design Award Winner in Kuiswa Category

29,817

Verified Award Winner

Verify Award Status for #172468

Colors

The Design

About Kwsa Madziro Anofamba

Kwsa madziro anofamba akaiswa paAramco Innovation Center muRiyadh. Basa iri rinovhara mamita mana e209 uye rakaumbwa nemadziro matanhatu emamodhuru, rimwe nerimwe rine upamhi hwe6000 mm uye urefu hwe7000 mm. Kufamba kunogadzirwa nema stepper motor 20,000 anofambisa lead screw uye lever system yakagadzirirwa basa iri ine chokwadi che0.1 mm. Zvikamu zvakagadzirwa netechnopolymers dzinozvizora mafuta hazvidi kuzorwa mafuta uye zvinobvumira kupinda nekumberi pakugadzirisa. Zvimiro zvekufamba zvakarongwa zvinogadzirwa kubva kuvhidhiyo yegrayscale, apo hukoshi hwekupenya hunotsanangura chiyero chekufamba.

The Recognition

About the Mubairo weSirivha we A' Design Award

Mubairo weSirivha we A' Design Award wakahwinwa ne Kwsa Madziro Anofamba, rukudzo rwakakwirira zvikuru runopiwa kumadhizaini epamusoro, anonaka uye anofadza. Vakunda veSirivha mabasa anopenya kwazvo uye ane kugadzira kwakasiyana anoratidza unyanzvi, hunyanzvi hwekusikwa nekungwara kwevagadziri vawo. Kwsa Madziro Anofamba inotarisirwa kuva basa rinoshamisa, rinotangira vamwe, rine hunyanzvi hunoonekwa uye zvitsva zvakadzika. Dhizaini iyi yakahwina Mubairo weSirivha we A' Design Award chigadzirwa chinoshamisa, chinokudzwa chinobatsira uye chinosundira mberi miganhu yehunyanzvi, sayenzi, dhizaini netekinoroji. Kwsa Madziro Anofamba chigadzirwa chinoshuvirwa nevazhinji, chinomutsa zvishuvo, chinouya nemanzwiro akanaka uye chinomutsa kushamisika.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate