Hekuri Arkitekturë · 2020
QMC Hospital Qendra e Trajtimit Ditor
by Adrian Light
- Çmimi i Hekurt A' Design Award 2020 in Arkitekturë
- CLIENT: ONE20 Group Architects
- Estimated Number of Design Views: 10,726
- Verification code D6E9D0CC19 · Verify this award
Colors
About QMC Hospital Qendra e Trajtimit Ditor
Spitali QMC është një qendër trajtimi ditor e vendosur në kampusin e Queens Medical Centre në Nottingham, Mbretëria e Bashkuar. Ndërtesa përmban 15 departamente, duke përfshirë ambiente diagnostikimi dhe salla operacioni, të shtrira në dy kate operacionale me sipërfaqe totale 9,500 metra katrorë. Plani është organizuar rreth një atriumi qendror, i cili sjell dritë natyrale në ambientet e brendshme dhe mbështet nivele të larta qëndrueshmërie. Zonat e qarkullimit janë të mbyllura me qelq transparent. Një studim i kujdesshëm i hapësirave të konsultimit e bëri ndërtesën rreth 20 përqind më të vogël se sa do të kërkonin kriteret standarde.
About the Çmimi i Hekurt A' Design Award
QMC Hospital Qendra e Trajtimit Ditor është fitues i Çmimit të Hekurt A' Design Award, një njohje prestigjioze që u akordohet dizajneve të mira që plotësojnë kërkesat profesionale e industriale që priten nga krijimet e dizajnuara mirë. Fituesit e Hekurt shfaqin aftësi të madhe, specializim të lartë, kuptim ekspert dhe kapacitet krijues të autorëve të tyre. QMC Hospital Qendra e Trajtimit Ditor pritet të jetë një krijim shumë i vlerësuar, i admiruar e i dashur, praktik dhe inovativ. Ky dizajn fitues i Çmimit të Hekurt A' Design Award integron praktikat më të mira të industrisë dhe ka karakteristika teknike të afta, të lidhura me njohuri dhe talent. QMC Hospital Qendra e Trajtimit Ditor respektohet për përpikërinë e tij dhe është dizajnuar për të ofruar përmirësime të cilësisë së jetës që ndihmojnë ta bëjnë botën një vend më të mirë.
Press Kit
- Unique Properties
- Nottingham NHS DayTreatment Centre (NDTC) is part of a UK government initiative to provide modern state of
the art facilities equipped with the latest technology.
medical treatment and outpatient consultation rooms.
Including diagnostics and theatre suites there are 15 departments integrated into this building all providing day care facilities and treatment. By relocating these departments the hospital was able to free bed space for longer term care. This was opened as the largest Independent Sector Treatment Centre in Britain. - Dimensions & Packaging
- Key facts are:-
185,000 patients per annum
9,500 sq m over two operational floors
6 years from inception to opening including all bidding stages
1,000 NHS staff on secondment from QMC
Saving features to achieve energy targets of N55 gj/100cu m/annum - Tags
- Hospital,, Architecture, Sustainability, Hospital Design, NHS, Treatment Centre
- Production Technology
- The building is composed from modern building materials. The circulation areas are celebrated with clear glass. The tunnel connecting the new building to the old is a metal tube with slits that create a rythym of light as you walk along. Another level of research investigated how to provide additional teatments and reduce waiting times.
- Design Challenge
- The site was an old established hospital campus. The new building had to fit within the overall precinct, but also be a distinct element. Public art was an integral part of the brief. ONE20 established separate Art and Landscape budgets. This ensured that these elements were not lost during construction. The art was procured through design competition. The planning of the building was integral to ensuring a more efficient healthcare process. The design of treatment areas meant waiting times have been reduced and more patients have been seen than in a traditionally planned hospital.
- Research
- It is now becoming better accepted that natural light can play an important role in speeding up the recovery of patients. The decision was taken to maximise the access to natural light for all patients in the hospital; not an easy thing in a building with such a large footprint.
- Inspiration
- ONE20 designed this building around the atrium which acts as a focus for all activities and also to deliver high levels of sustainability. By looking creatively at the use of consultation space and agreeing strategy options with the consultant teams, the net building is around 20% smaller than one using standard NHS criteria.
- Project Duration
- The project is located on the campus of the Queens Medical Centre in Nottingham UK Work commenced in 2006 and has bees modified over the past 15 years. The latest work being concluded in 2019
- Operation Flow
- This is largest independent treatment centre in Britain. The Nottingham Day Treatment Centre is operated for the NHS providing high quality day case procedures. Secretary of State for Health Andrew Lansley, stated "It is providing a good care to patients on the basis of NHS principles. It made a profit of £4 million in the six-month period to 30 June 2013, up from £2.5 million. In 2016, Circle's teledermatology service was awarded a "Clinician’s Choice Award" by private healthcare industry group Hpci Media in the Building Better Healthcare Awards
- Image Credits
- Photographer - Adrian Light