Skip to content
Hours on the Slope Fabrika, Poslovna zgrada by T.E and C Architects Associates

Hours on the Slope Fabrika, Poslovna zgrada by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 Бронзана награда A' Design Award in Дизајн архитектуре, зграда и конструкција Competition Category.


БронзанаАрхитектура· 2021

Hours on the Slope Fabrika, Poslovna zgrada

by T.E and C Architects Associates

Client: T.E and C Architects Associates

Бронзана награда A' Design Award Winner in Архитектура Category

10,487

Verified Award Winner

Verify Award Status for #106869

Colors

The Design

About Hours on the Slope Fabrika, Poslovna zgrada

„Hours on the Slope" je kompleks fabrike i poslovne zgrade u Tajčungu na Tajvanu. Parcela je podeljena na tri objekta raspoređena u skladu sa okruženjem i orijentacijom. Na zapadnoj strani, gde je izloženost suncu velika, tamni prozori i smanjene prozorske površine naglašavaju osećaj volumena. Spoljni zidovi su obloženi granitom i zelenim sistemom premaza za zgrade. Za zakrivljenu površinu poslovne zgrade odabran je mozaik od prirodnog kamena. Ukopani sistem cevovoda usmerava hladan spoljni vazduh u pogon, dok solarni paneli na krovu obezbeđuju senku za parking na najvišem spratu.

The Recognition

About the Бронзана награда A' Design Award

Hours on the Slope Fabrika, Poslovna zgrada је добитник Бронзане награде A' Design Award, високо престижног признања које се додељује изванредним дизајнима који се одликују креативношћу, домишљатошћу и оштроумношћу. Добитници Бронзане награде у потпуности су вешти и упечатљиво креативни артефакти који потврђују велико искуство, машту и снаљажљивост својих дизајнера. Очекује се да Hours on the Slope Fabrika, Poslovna zgrada буде високо цењен, дивљен и вољен предмет, запажено професионалан и иновативан. Овај дизајн награђен Бронзаном наградом A' Design Award уграђује најбоље праксе у уметности, науци, дизајну и технологији и одличан је по пажњи према детаљима. Hours on the Slope Fabrika, Poslovna zgrada сјајно задовољава потребе, дотиче жеље, очарава осећања и привлачи радозналост.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
Dimensions & Packaging
The project is 63767 square meter.
Tags
Architecture, Factory, Office, Plant, Building
Production Technology
The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
Design Challenge
This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
Research
A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
Inspiration
The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
Project Duration
The project finished in December 2018 in Taichung, Taiwan.
Operation Flow
The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
Team Members
Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang
Image Credits
Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate