Златна Архитектура · 2021
Mome Kampus
- Златна награда A' Design Award 2021 in Архитектура
- CLIENT: 3h Architects
- Estimated Number of Design Views: 31,691
- Verification code 94E4234600 · Verify this award
Colors
About Mome Kampus
MOME je univerzitetski kampus projektovan za obrazovanje u oblasti umetnosti i dizajna. Kampus se sastoji od tri zgrade, nazvane Base, Master i Up. Viseća konstrukcija zgrade Base omogućava fleksibilno korišćenje svake etaže, pri čemu su podne ploče nošene trostrukim čeličnim jezgrom obešenim o prednapregnute betonske grede. Zgrada Up je pokrivena dvostrukim staklenim lamelnim sistemom koji obezbeđuje zasenu i prirodnu ventilaciju. U zgradi Master, unutrašnji zidovi zamenjeni su zvučno izolovanim staklenim zidovima. Bruto izgrađena površina iznosi 15.851 kvadratni metar.
About the Златна награда A' Design Award
Mome Kampus је добитник Златне награде A' Design Award, огромно престижног признања које се додељује првокласним, дивним и изванредним дизајнима. Добитници Златне награде изузетно су иновативне, визионарске и блиставо задивљујуће творевине које одражавају геније, мудрост и умеће својих дизајнера. Очекује се да Mome Kampus буде високо хваљен, трендсетерски и монументалан изум који доноси беспримерну вредност. Овај дизајн награђен Златном наградом A' Design Award спектакуларно је, поштовано дело које у великој мери користи и помера границе уметности, науке, дизајна и технологије. Mome Kampus ствара интензивна осећања жеље, буди страст, подстиче креативност и фасцинира нас.
Press Kit
- Unique Properties
- The new campus is the manifestation of the university's advanced economic and educational model. The extended educational areas offer a studio-like teaching environment spatially revolutionizing the 21st century academic art practice. The building complex 'Base', 'Master' and 'Up' Innovation Centre brings forth a variety of unprecedented creative venues in the spirit of openness with the aim to provide such institutional spaces, which can stir the academic creation-process towards new waters.
- Dimensions & Packaging
- Gross built area: 15.851 (m2)
- Tags
- campus, modernism, transparency, analogue, bauhaus, arts, university, innovation, hub, transformation
- Production Technology
- Building B, BASE’s floating essence comes form a tripple steel core reinforcement suspended from from post-tensioned monolithic concrete beams, and hold the edges of the floor slabs. UP’s most notable technical element is the double-shell glass lamella system, which next to its visual appeal also has a shading function and provides natural ventillation. The MASTER’s inner walls have been torn down and replaced with soundproof glass walls during the building’s modernization process.
- Design Challenge
- The biggest challenge was mapping the terrain conditions of the location and finding the right placement for the main entrance of the new campus, meanwhile ensuring the plans harmonize with the already existing modern villa-like buildings on the site.
- Research
- The main goal of this design was to create such a learning and working enviroment which revolutionizes the 21st century academic art practice. To accomplish this goal the architects were working hand in hand with the university staff while coming up with the plans, inventing inner spaces that serve as a transformable,stimulating background for creative activities. This included weekly consulatations and numerous hours spent on researching this new spatio-educational model.
- Inspiration
- The inspiration came from the person the university is named after, Laszlo Moholy-Nagy, someone with an innovative, creative nature pushing artistic and technical boundaries - and through him, to the pioneering applied arts movement of the previous century, the Bauhaus. The fuel behind the design was to commemorate his oeuvres and significance as well as summoning a space which is to be the hotbed of contemporary artistic creation in Hungary.
- Project Duration
- The competition and call for submissions took place during October, 2015 for MOME University's stage 3 campus development. In the following January the results were announced, and the work begun after winning the competition: creating the concept, coming up with the construction plans and licensing. In the December of 2016 the planning phase closed and the construction took place between 2017-2019 June.
- Operation Flow
- The architectural design of the campus provides distinctive spatial solutions in each of the university’s three key buildings: the suspended structure of BASE maximizes the freedom to use different floors, and the horizontal and vertical transparency of building A encourages interdisciplinary dialogue. Meanwhile, the exterior of UP represents a new visual image for the university, and the interior provides a constant – and constantly changing – revelation.
- Patents
- Copyrights belong to 3h Architects, 2019
- Image Credits
- Main Image #1: 1_3h_mome_0027_web.jpg/ Photographer Balazs Danyi 2020
Optional Image#1: 2_1V3A8849a.jpg/ Photographer Tamas Bujnovszky 2020
Optional Image#2: 3_3h_mome_9635_web.jpg/ Photographer Balazs Danyi 2020
Optional Image#3: 4_3h_mome_9791_web.jpg /Photographer Balazs Danyi 2020
Optional Image#4: 5_base_388.jpg/Photographer Balazs Danyi 2020