Imatra GIS Trafostanica
by Virkkunen and Co Architects
Client: Virkkunen & Co Architects
Сребрна награда A' Design Award Winner in Архитектура Category
- 22,224
- Verified Award Winner
- Verify Award Status for #120944
The Design
About Imatra GIS Trafostanica
Imatra GIS je elektroenergetska trafostanica smeštena u pejzažu brzaka Imatrankoski u istočnoj Finskoj. Projekat obuhvata zgradu trafostanice i pet dalekovodnih stubova i terminala. Zgrada ima betonsku konstrukciju i dvoslojne fasade. Spoljni sloj je izrađen od ručno rađene izdužene cigle položene u cik-cak profilu i oslonjene na čeličnu konstrukciju. Prenosne konstrukcije su izrađene od trougaonih zavarenih čeličnih profila. Dizajn razlaže aspekte izgrađenog konteksta i ponovo sklapa elemente u novom apstrahovanom obliku, u ravnoteži sa okolnim pejzažom.
The Recognition
About the Сребрна награда A' Design Award
Imatra GIS Trafostanica је добитник Сребрне награде A' Design Award, изузетно престижног признања које се додељује врхунским, предивним и импресивним дизајнима. Добитници Сребрне награде неизмерно су бриљантна и изузетно креативна дела која илуструју изузетну стручност, таленат и оштроумност својих дизајнера. Очекује се да Imatra GIS Trafostanica буде дивно, узорно дело, запажено професионално и дубоко иновативно. Овај дизајн награђен Сребрном наградом A' Design Award веома је запажен, дивљен изум који користи и помера границе уметности, науке, дизајна и технологије. Imatra GIS Trafostanica је творевина којој многи завиде, која буди жеље, доноси позитивна осећања и изазива чуђење и дивљење.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
- Dimensions & Packaging
- The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
- Tags
- infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
- Production Technology
- The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
- Design Challenge
- The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
- Research
- We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
- Inspiration
- The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
- Project Duration
- Project completed: 2020
Location: Imatra, Finland - Operation Flow
- Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
- Team Members
- Tuomas Kivinen
Anna Blomqvist
Maria Karjalainen - Image Credits
- Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.