Skip to content
Kwsa Kinetički zid by Leva Engineering

Kwsa Kinetički zid by Leva Engineering is a highly esteemed winner of the very prestigious 2025 Сребрна награда A' Design Award in Дизајн инсталација Competition Category.


СребрнаИнсталација· 2025

Kwsa Kinetički zid

by Leva Engineering

Client: Leva Engineering

Сребрна награда A' Design Award Winner in Инсталација Category

Colors

Email this page

The Design

About Kwsa Kinetički zid

Kwsa je kinetička zidna instalacija koja se nalazi u Aramco inovacionom centru u Rijadu. Delo pokriva 209 kvadratnih metara i sastoji se od šest modularnih zidova, svaki širine 6000 mm i visine 7000 mm. Kretanje proizvodi 20.000 step motora koji pokreću namenski sistem navojnih vretena i poluga sa preciznošću od 0,1 mm. Komponente izrađene od samopodmazujućih tehnopolimera ne zahtevaju podmazivanje i omogućavaju pristup s prednje strane radi održavanja. Koreografisane sekvence se kreiraju iz video zapisa u sivim tonovima, gde vrednosti osvetljenosti određuju stepen kretanja.

The Recognition

About the Сребрна награда A' Design Award

Kwsa Kinetički zid је добитник Сребрне награде A' Design Award, изузетно престижног признања које се додељује врхунским, предивним и импресивним дизајнима. Добитници Сребрне награде неизмерно су бриљантна и изузетно креативна дела која илуструју изузетну стручност, таленат и оштроумност својих дизајнера. Очекује се да Kwsa Kinetički zid буде дивно, узорно дело, запажено професионално и дубоко иновативно. Овај дизајн награђен Сребрном наградом A' Design Award веома је запажен, дивљен изум који користи и помера границе уметности, науке, дизајна и технологије. Kwsa Kinetički zid је творевина којој многи завиде, која буди жеље, доноси позитивна осећања и изазива чуђење и дивљење.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate