Skip to content
Jobcenter Berlin Mohaho oa Tsamaiso by Elisabeth Ruthnick

Jobcenter Berlin Mohaho oa Tsamaiso by Elisabeth Ruthnick is a highly esteemed winner of the very prestigious 2022 Moputso oa Tšepe oa A' Design Award in Moralo wa Meaho, Dikaho le Dibopego Competition Category.


TšepeMeaho· 2022

Jobcenter Berlin Mohaho oa Tsamaiso

by Elisabeth Ruthnick

Moputso oa Tšepe oa A' Design Award Winner in Meaho Category

Colors

The Design

About Jobcenter Berlin Mohaho oa Tsamaiso

Jobcenter Berlin ke mohaho oa tsamaiso o Berlin, Jeremane, o entsoeng ka ho fetola Bornemann High-rise, e leng kaholimo ea 1960 ea holo ea toropo. Mohaho o ngolisitsoeng o ile oa ntlafatsoa ho fihlela maemong a hajoale a sebopeho, matla le tšireletso khahlanong le mollo, 'me merero ea fatše e ile ea fetoloa ho lumellana le litlhoko tsa basebelisi ba bacha. Lipale tsa konkriti e hlatsoitsoeng le likarolo tsa lifensetere li ile tsa nchafatsoa ho latela moralo oa mantlha, ka tumellano le mmuso o sireletsang lisebelisoa tsa histori. Mabota a matsoela a bonahalang ka har'a li-hallwe a ile a lokisoa 'me a hlatsoa. Leano le lecha la mebala le tataisa libaka tsa sechaba le li-corridor.

The Recognition

About the Moputso oa Tšepe oa A' Design Award

Jobcenter Berlin Mohaho oa Tsamaiso ke mohapi oa Moputso oa Tšepe oa A' Design Award, kananelo e hlomphehang e fuoang meralo e metle e finyellang litlhoko tsa porofeshenale le tsa indasteri tse lebelletsoeng ho lintho tse hlahisitsoeng tse entsoeng hantle. Bahapi ba Tšepe ba bontša bokhoni bo boholo, bokhethehi bo phahameng, kutloisiso ea litsebi le bokhoni ba boqapi ba baqapi ba bona. Jobcenter Berlin Mohaho oa Tsamaiso e lebelletsoe ho ba ntho e hlahisitsoeng e hlomphuoang haholo, e ratoang le e ratehang, e sebetsang le e nang le mehopolo e mecha. Moralo ona o hapileng Moputso oa Tšepe oa A' Design Award o kenyelletsa mekhoa e metle ka ho fetesisa ea indasteri mme o na le litšobotsi tsa theknoloji tse nang le bokhoni tse amanang le tsebo le talenta. Ka lebaka la botlalo ba eona, Jobcenter Berlin Mohaho oa Tsamaiso e tšoanelehela tlhompho mme e entsoe ho fana ka ntlafatso ea bophelo e thusang ho etsa hore lefatše le be sebaka se molemo.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era.
Dimensions & Packaging
GFA: 8,908 square meter
GBV: 33,198 cubic meter
Tags
High-rise, Post-war modern era, Refurbishment
Production Technology
When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
Design Challenge
A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
Research
The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
Inspiration
Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
Project Duration
Realization: 2013-2018
Location: Berlin, Germany
Operation Flow
The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors.
Team Members
Frank Anacker, Sylvia Wallau, Sabine Hadrossek
Image Credits
Andreas Meichsner, Berlin
Kevin Fuchs, Berlin

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate