Karya Kwsa Témbok Kinétik ku Leva Engineering nyaéta pamenang anu dihormat pisan tina 2025 A' Design Award Perak anu bergengsi dina Katégori Kompetisi Instalasi.
PerakInstalasi· 2025
Kwsa Témbok Kinétik
Klién: Leva Engineering
Pamenang A' Design Award Perak dina Katégori Instalasi
Pamenang Panghargaan anu Diverifikasi
Verifikasi Status Panghargaan pikeun #172468Désain
Ngeunaan Kwsa Témbok Kinétik
Kwsa nyaéta instalasi témbok kinétik anu perenahna di Aramco Innovation Center di Riyadh. Karya ieu ngawengku 209 méter pasagi sarta diwangun ku genep témbok modular, masing-masing rubakna 6000 mm sareng jangkungna 7000 mm. Gerakanana dihasilkeun ku 20.000 motor stepper anu ngagerakkeun sistem lead screw sareng tuas husus kalayan tingkat katelitian 0,1 mm. Komponén anu didamel tina teknopolimér swa-lubrikasi henteu merlukeun pelumasan sareng ngamungkinkeun aksés ti hareup pikeun pangropéa. Runtuyan koréografi diciptakeun tina vidéo grayscale, dimana nilai kacaangan nangtukeun darajat gerakanana.
Pangakuan
Ngeunaan A' Design Award Perak
Kwsa Témbok Kinétik mangrupa juara A' Design Award Perak, pangakuan anu luar biasa bergengsi anu dipasihkeun ka desain kelas luhur, endah jeung matak kagum. Para juara Perak téh karya anu pohara cemerlang jeung pohara kréatif anu ngagambarkeun kaahlian, bakat jeung kapinteran para désainerna. Kwsa Témbok Kinétik diharepkeun jadi karya anu éndah, karya andalan anu pohara profésional jeung pohara inovatif. Desain juara A' Design Award Perak ieu mangrupa panemuan anu pohara kasohor jeung dikagumi anu mangpaat sarta ngamajukeun watesan seni, élmu, desain jeung téknologi. Kwsa Témbok Kinétik mangrupa kréasi anu pohara diirikeun anu ngahudang kahayang, ngabawa rasa positip, jeung ngahudangkeun rasa heran jeung kagum.
Di Balik Désain
Kit Pers
Krédit, anggota tim sareng detil téknis anu disayogikeun ku désainer.
- Sipat Unik
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Diménsi & Bungkusan
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Tag
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Téknologi Produksi
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Tantangan Desain
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Panalungtikan
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Inspirasi
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Durasi Proyék
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Alur Operasi
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Anggota Tim
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Disponsoran
Jelajah Saluareun Designers.org
Panggihan produk, layanan sareng kasempetan ti mitra iklan urang.
Langkung Seueur Pikeun Dijajah
Désain Anu Patali
Jajah langkung seueur désain anu meunang panghargaan tina katégori anu sami, dipilih dumasar kana jasana.