The PolyCuboid Gedong Kantor by Tetsuya Matsumoto is a highly esteemed winner of the very prestigious 2020 A' Design Award Emas in Arsitéktur Competition Category.
EmasArsitéktur· 2020
The PolyCuboid Gedong Kantor
Client: TIA Co., Ltd.,
A' Design Award Emas Winner in Arsitéktur Category
Verified Award Winner
Verify Award Status for #98976The Design
About The PolyCuboid Gedong Kantor
PolyCuboid mangrupikeun gedong markas anyar pikeun TIA, perusahaan anu nyayogikeun jasa asuransi. Lantai kahiji dibentuk ku wates situs sareng pipa cai diaméter 700mm anu nyebrang situs bawah tanah ngabatesan ruang pondasi. Struktur logam larut kana rupa-rupa blok dina komposisi. Rukun sareng balok ngaleungit tina sintaksis rohangan, ngagungkeun tanggapan hiji barang, sedengkeun ogé ngaleungitkeun wangunan. Desain volumetrik diideuan ku Logo TIA anu ngarobah gedongna sorangan jadi ikon anu ngalambangkeun perusahaan.
The Recognition
About the A' Design Award Emas
The PolyCuboid Gedong Kantor mangrupa juara A' Design Award Emas, pangakuan anu pohara bergengsi anu dipasihkeun ka desain kelas kahiji, ngaranjing jeung unggul. Para juara Emas téh kréasi anu pohara inovatif, visionér jeung matak ngacung anu ngagambarkeun kajeniusan, hikmah jeung kaahlian para désainerna. The PolyCuboid Gedong Kantor diharepkeun jadi panemuan anu pohara dipuji, pelopor tren, sarta monumental anu méré nilai anu can kungsi aya. Desain juara A' Design Award Emas ieu mangrupa proyék spéktakulér tur dihormat anu pohara mangpaatna sarta ngamajukeun watesan seni, élmu, desain jeung téknologi. The PolyCuboid Gedong Kantor nyiptakeun rasa hayang anu kuat, ngahudang gairah, ngadorong kréativitas, jeung ngagumkeun urang.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The PolyCuboid is the new headquarter office for TIA.co.ltd, a company that provides insurance services. The building is a composition of three imperfect cuboid shapes that interlace to build up the different spaces. The composition further results in an atrium linking the different functions on the different levels and providing the interior with a large amount of natural light. The metallic structure vanishes from the space syntax turning the building into a sculptural object.
- Dimensions & Packaging
- Gross Built Area: 621sqm
W20825mm x D13405mm x H18680mm - Tags
- Japan, office, insurance, volume, minimalism, interlace, workplace, architecture, atrium
- Production Technology
- The building stand on a metallic frame structure for its four levels. The complex geometry of the distinct cuboids and their superposition creating half levels accentuates the complexity of the metallic frame that is concealed inside the invisible parts of the volumes. The exterior wall cladding is a polished composite cement panel called Miraia and produced by Nichiha. The interior finishes vary from wallpaper, tiles, black oxide steel, stainless steel, and many other materials.
- Design Challenge
- The main challenge of the design was the water service pipe crossing the site underneath in the middle, limiting the construction to half the area, and calling for cantilevered spaces in the upper levels to compensate. Instead of a conventional building with balconies, recovering to the use of interlaced cuboids results in peculiar spaces and connections that needed to be carefully managed. Privacy and interaction together with the daylighting had also major importance in the design process.
- Research
- The interaction between three imperfect cuboid forms can create either an alteration of the form or a nonfunctional architectural space. the alteration happens mostly for technical reasons, such as parapet wall placements, ducts, or simply beam locations. How can space syntax be kept clear while saving the entity of each volume? And what kind of spatial and functional interactions could be created between them? Further, how can a volume identity be kept while using different materials.
- Inspiration
- The PolyCuboid design was inspired by the client initials, TIA, creating the three distinct volumes at first. The design process developed the volumes to the later abstract cuboid forms. The functionality and connection of spaces were inspired by a more dynamic and yet relaxing approach to work that the client want to implement in their headquarter.
- Project Duration
- Project start: September 2017.
Construction start: December 2018.
Project/Construction End: December 2019.
Location: Designed and constructed in Himeji City, Japan. - Operation Flow
- The entrance gives on to the reception counter, elevator hall and a reception space furnished in sofas and coffee table. A raw of private desks for the employees behind an inside glass facade occupies most of the ground level. The Atrium at the other end connects the three first levels through dynamic resting spaces. the second level is occupied by the CEO office, a meeting room, and booth desks, while the third and forth level includes a gym, a recreational room and a dinning space.
- Image Credits
- Image #1: photographer ©Stirling Elmendorf, PolyCuboid, 2019.
Image #2: photographer ©Stirling Elmendorf, PolyCuboid, 2019.
Image #3: photographer ©Stirling Elmendorf, PolyCuboid, 2019.
Image #4: photographer ©Stirling Elmendorf, PolyCuboid, 2019.
Image #5: photographer ©Stirling Elmendorf, PolyCuboid, 2019.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.