Gushu ቤት ጽላይት እሳት by Zhong Zhong, Ma Yue and Zhong Botao is a highly esteemed winner of the very prestigious 2024 ናይ ነሓስ ሽልማት A' Design Award in ንድፊ ኣርክቴክቸር፣ ህንጻን ቅርጽን Competition Category.
ነሓስኣርክቴክቸር· 2024
Gushu ቤት ጽላይት እሳት
by Zhong Zhong, Ma Yue and Zhong Botao
Client: Suidar
ናይ ነሓስ ሽልማት A' Design Award Winner in ኣርክቴክቸር Category
Verified Award Winner
Verify Award Status for #157273The Design
About Gushu ቤት ጽላይት እሳት
እዚ ዲዛይን ንሓደ ዝተዋሃሃደን ጽዑቕን ቅርጺ ህንጻ ንምርኣይን ኣብ መንጎ ሕንጻዊ ተግባርን ቅርጽን ዘሎ ርክብ ንምግላጽን፡ ከም ናይ ቁሳቁሳት ተቓራኒነት፡ ናይ ብሎክ ምእታው፡ ከምኡ'ውን ናይ ዝዕረግ ፓነላት ምውህሃድ ዝኣመሰሉ ዝተፈላለዩ ኣገባባት የውቅዕ። ብተወሳኺ፡ ከም ናይ ገጽ ኣፍታሕ፡ ገለ ገለ ዝለዓለ ወለላት፡ ናይ ሰማይ መትረብያታት፡ ከምኡ'ውን ግሪላት ዝኣመሰሉ ባህርያት ምስ ናይ ሊንናን ሙቐትን ዝናብን ዝበዝሖ ንፋስ ኣየር ንምትዕርራይ ይጥቀሙ። እቲ ርብዒናውን ሓይለኛን ሕንጻዊ ቅርጺ ነቲ ናይ ጉሹ ቤት ጽላይት እሳት ከም ርጉእን ህዱእን ጠባቒ የርኢ።
The Recognition
About the ናይ ነሓስ ሽልማት A' Design Award
Gushu ቤት ጽላይት እሳት ናይ ነሓስ ሽልማት A' Design Award ዝዓወተ እዩ፣ ብፈጠራ፣ ርእሰ ሓይልን ስቕታን ዝፍለዩ ብልጫ ዘለዎም ዲዛይናት ዝወሃብ ኣዚዩ ክቡር ኣፍልጦ። ዘዓወቱ ነሓስ ሰፊሕ ተሞክሮ፣ ምሕሳብን ርእሰ ምምዕባልን ዲዛይነራቶም ዘረጋግጹ ኣዚዮም ክኢላታትን ብዘደንቕ መገዲ ፈጠራውያንን ኣርቴፋክትታት እዮም። Gushu ቤት ጽላይት እሳት ብዙሕ ዝተመነየ፣ ዝደነቐን ዝፈተዎን ብኣገዳሲ መገዲ ሞያውን ሓድሽን ኣቕሓ ክኾን ይጽበ። እዚ ዝዓወተ ዲዛይን ናይ ነሓስ ሽልማት A' Design Award ኣብ ጥበብ፣ ሳይንስ፣ ዲዛይንን ቴክኖሎጂን ዝበለጹ ልምድታት ዘጣምር፣ ንዝርዝር ብዝህቦ ኣቓልቦ ድማ ዝበለጸ እዩ። Gushu ቤት ጽላይት እሳት ድልየታት ብጽባቐ የማልእ፣ ንድሌታት ይትንክፍ፣ ንስምዒታት የማርኽን ሕቶ ድማ የሰሕብን።
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The project shall be designed according to the research results of the 2014 Shenzhen Fire Station Standardization Design Workshop, Guidelines for Shenzhen Fire Station Standardization and Individualization Design, and Fire Station Standardization Research Documentation. The project is a new standardized fire station with a concentrated layout.
- Dimensions & Packaging
- The square-shaped plot covers a gross floor area of 5,120.87sqm, with a land area of 3,963.11sqm. The floor area above ground is 3,991.27sqm, accommodating a four-story main building and a seven-story training tower. The basement covers a floor area of 1,129.6sqm. The project has a plot ratio of 1.007. The project is a grade-1 fire station, which can accommodate 8 fire trucks.
- Tags
- Grade-1 fire station, Standardization Design, Centralized layout, Exit near the street, Research workshop, SUIADR, Z&Z STUDIO
- Production Technology
- Standardized design:
A uniform column network of 8.4m x 10.2m is used with standardized floor heights: 6 meters for fire engine garages, and 3.9 meters for duty rooms and business rooms.
Centralized layout:
With a limited plot area, the fire station adopts a typical centralized and compact layout.
Green design:
A garden has been created on the rooftop orchard. Concave green area is set for rainwater absorption, storage and infiltration, to effectively control the rainwater runoff within the site. - Design Challenge
- Layout: The limited plot area. Based on the special site conditions, the task is to develop a scientifically rational layout that makes the most out of the cramped space available.
Site conditions: The site is surrounded by a great deal of industrial buildings, which causes an strong oppressive feeling and brings stressful firefighting challenges. - Research
- The design responds to the future demand for a large number of fire station constructions in Shenzhen, and it also serves as an exemplar for domestic fire station construction. The design caters to the needs of fire stations for responding instantly and safely to any emergency requests, training, recreation, and daily life while keeping in mind the possibility of future professionalization. It also highlights the importance of moderate opening to the community and fire safety culture transmission.
- Inspiration
- The project site is to the northeast of the intersection of Gushu 2nd Road and Guxing Road in Bao’an District, Shenzhen, China. On the east and west sides of the project site are lands designated for planned factories, while the north side for multi-functional public facilities. Meanwhile, the site is surrounded by a great deal of industrial buildings, which causes a strong oppressive feeling and brings stressful firefighting challenges.
- Project Duration
- Project design time: November 2017
Project completion time: August 2020
Location: the northeast of the intersection of Gushu 2nd Road and Guxing Road in Bao’an District, Shenzhen, China - Operation Flow
- Regarded as the guard of the industrial area, Gushu Fire Station is a grade-1 fire station that can accommodate up to 8 fire trucks. It is a typical fire station with a centralized layout in an industrial zone. With a standardized design approach, the project adapts to local conditions and achieves characterized appearances.
- Team Members
- Chief designer: Zhong Zhong
Design team: Zhong Zhong, Ma Yue, Zhong Botao, Zhang Yidi, Zhong Haihuan, Yao Yuan, Meng Meili, Wei Xianqiong, Li He, Hou Jian, Wang Hongyue, Guo Hao, Liu Zhongping, Wang Weifang, Liu Mu, Tang Jin - Image Credits
- Inter_mountain
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.