Chapel on the Hill ቤት ዕረፍቲ

by Evolution Design

  • ናይ ብሩር ሽልማት A' Design Award 2016 in ኣርክቴክቸር
  • CLIENT: Evolution Design
  • Estimated Number of Design Views: 35,785
  • Verification code CCB190255E · Verify this award
Email this page

Colors

About Chapel on the Hill ቤት ዕረፍቲ

ድሕሪ ልዕሊ 40 ዓመታት ተሓዲጉ ምጽናሕ፣ ኣብ ሰሜን እንግሊዝ ዝርከብ ዝበላሸወ ናይ ሜቶዲስት ቤተ-ክርስትያን ናብ ን7 ሰባት ዝኣክል ባዕሎም ዝምገቡሉ ናይ ዕረፍቲ ቤት ተቐይሩ። እቶም ሃንደስቲ ነቶም ነባራዊ ባህርያት - ነዊሕ ጎቲክ መስኮታትን ቀንዲ ናይ ምኵራብ ኮርደላን - ብምሕላው፣ ነታ ቤተ-ክርስትያን ናብ ምቹእን ሕሉፍን ብብርሃን መዓልቲ ዝተመልአት ቦታ ቀይሮማ። እዚ ናይ 19ይ ክፍለ ዘመን ህንጻ ኣብ ገጠራዊ እንግሊዝ ዝርከብ ኮይኑ፣ ናብቶም ዝንሰራረሑ ጎቦታትን ጽቡቕ ገጠራዊ ከባቢን ሰፊሕ ትርኢት ይህብ።

About the ናይ ብሩር ሽልማት A' Design Award

Chapel on the Hill ቤት ዕረፍቲ ናይ ብሩር ሽልማት A' Design Award ዝዓወተ እዩ፣ ንጽቡቓት፣ ልዑላትን ዘስደምምን ላዕለዋይ ደረጃ ዘለዎም ዲዛይናት ዝወሃብ ብዘይተለምደ ኣዚዩ ክቡር ኣፍልጦ። ዘዓወቱ ብሩር ፍሉይ ክእለት፣ ተውህቦን ጥበብን ዲዛይነራቶም ዘርእዩ ኣዚዮም ዘብርሁን ብዙሕ ፈጠራውያንን ስራሕቲ እዮም። Chapel on the Hill ቤት ዕረፍቲ ዝበለጸ፣ ምሳሌ ዝኾነ፣ ብኣገዳሲ መገዲ ሞያውን ብዕምቆት ሓድሽን ስራሕ ክኾን ይጽበ። እዚ ዝዓወተ ዲዛይን ናይ ብሩር ሽልማት A' Design Award ብዙሕ ዝተራእየን ዝደነቐን ፈጠራ እዩ፣ ጥቕሚ ዘምጽእን ደረት ጥበብ፣ ሳይንስ፣ ዲዛይንን ቴክኖሎጂን ዘስፍሕን። Chapel on the Hill ቤት ዕረፍቲ ብብዙሕ ዝቐንኣሉ ፍጥረት እዩ፣ ድሌታት ዘበራብር፣ ጽቡቕ ስምዒታት ዘምጽእን ሰንቢድን ምድናቕን ዘበራብርን።

Press Kit

Unique Properties
After standing derelict for more than 40 years, a dilapidated Methodist chapel has been brought back to life by being converted into a modern holiday home for 7 people. The great achievement of this conversion is the way it retained the original characteristics of the chapel - the tall Gothic windows and the main congregation hall. Combined with a modern but sensitive interior design, the old chapel was resurrected to a beautiful, harmonious and comfortable space flooded with natural light.
Dimensions & Packaging
The Chapel has two floors: the ground floor and the mezzanine floor. Total floor area is 141 m2.
Tags
Chapel conversion, chapel reconstruction, chapel renovation, boutique holiday home, holiday cottage, UK, Forest-in-Teesdale
Production Technology
During the conversion, all main connections (water, electricity, sewage treatment) were installed. To retain the original look, the historic stonework was preserved and the roof tiles were recycled. New wooden window frames were installed to match the original windows. The building was insulated to be sustainable and comfortable for guests. In the interior, roof trusses were retained with natural finish. The use of tiles on the back wall complemented the generous ceiling height and spaciousness.
Design Challenge
At a very early planning stage it became clear that there was not enough space on the ground floor for all required rooms, therefore a mezzanine floor was proposed. Yet, to insert another floor without obstructing the Gothic windows meant designing the mezzanine floor above the window line, which gave the challenge of limited headroom on the first floor. To ensure the upstairs rooms function well, a 1:1 mock-up was built to test the new layout worked in full-scale.
Research
As it was important to retain as much of the original look and feel of the chapel as possible, numerous researches were conducted, including ecological and structural surveys and heritage appraisal. Also a research about the local neighborhood and traditional materials was carried out. The results of these surveys were later used in the sensitive development of the conversion design concept.
Inspiration
This beautiful chapel built in 1880 with great proportions and elegant architectonic details is located in a picturesque rural neighborhood with panoramic views to the North Pennines. The main inspiration was the raw beauty of the landscape and the amazing open horizon and the chapel sitting in the midst of it. Enabling visitors to experience this amazing spectacle combined with the history of the chapel was the driving force of this conversion.
Project Duration
The renovation project started in December 2013 and finished in May 2015.
It should have taken 12 month but took nearly 18 month due to the severe weather conditions. The contractors often had to stop work, as it was impossible to work in the driving rain and gale force winds. Location: Forest-in-Teesdale, UK.
Operation Flow
The house is operated as a self-catering holiday cottage.