Skip to content
Kwsa Kinetikong Pader by Leva Engineering
Kwsa Kinetikong Pader by Leva Engineering
Kwsa Kinetikong Pader by Leva Engineering
Kwsa Kinetikong Pader by Leva Engineering
Kwsa Kinetikong Pader by Leva Engineering

Pilak Instalasyon · 2025

Kwsa Kinetikong Pader

by Leva Engineering

  • A' Design Award na Pilak 2025 in Instalasyon
  • CLIENT: Leva Engineering
  • Estimated Number of Design Views: 29,817
  • Verification code 0DC74ADF9D · Verify this award
Email this page

Colors

About Kwsa Kinetikong Pader

Ang Kwsa ay isang kinetikong pader na instalasyon na matatagpuan sa Aramco Innovation Center sa Riyadh. Sumasaklaw ang obra sa 209 metro kwadrado at binubuo ng anim na modular na pader, na ang bawat isa ay may lapad na 6000 mm at taas na 7000 mm. Ang galaw ay nililikha ng 20,000 stepper motor na nagpapaandar sa isang pasadyang lead screw at lever system na may katumpakan na 0.1 mm. Ang mga bahagi na gawa sa self-lubricating na technopolymer ay hindi nangangailangan ng pagpapadulas at nagbibigay-daan sa pag-access mula sa harap para sa pagmamantini. Ang mga koreograpiyang sequence ay nililikha mula sa grayscale na video, kung saan ang mga halaga ng liwanag ang tumutukoy sa antas ng galaw.

About the A' Design Award na Pilak

Ang Kwsa Kinetikong Pader ay nagwagi ng A' Design Award na Pilak, isang pambihirang prestihiyosong pagkilalang iginagawad sa mga disenyong nasa pinakamataas na antas, nakabibighani at kahanga-hanga. Ang mga nagwagi ng Pilak ay mga likhang lubhang makinang at napakamalikhain na naglalarawan sa pambihirang kadalubhasaan, talento at talas ng isip ng kanilang mga tagapagdisenyo. Inaasahang ang Kwsa Kinetikong Pader ay isang kahanga-hangang likhang huwaran na kapansin-pansing propesyonal at malalim na makabago. Ang disenyong ito na nagwagi ng A' Design Award na Pilak ay isang lubhang kapansin-pansin at hinahangaang imbensyon na nakikinabang at nagpapaunlad sa mga hangganan ng sining, agham, disenyo at teknolohiya. Ang Kwsa Kinetikong Pader ay isang likhang labis na kinaiinggitan na gumigising ng mga hangarin, nagdadala ng positibong damdamin at nagpapasiklab ng pagkamangha at pagkabighani.

Press Kit

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate