Kwsa Kinetik Devor haqida
Kwsa — Ar-Riyoddagi Aramco Innovatsiya Markazida joylashgan kinetik devor installyatsiyasidir. Asar 209 kvadrat metr maydonni egallaydi va har biri 6000 mm kenglikdagi hamda 7000 mm balandlikdagi oltita modulli devordan tashkil topgan. Harakat 0,1 mm aniqlikka ega maxsus vint va richag tizimini yurituvchi 20 000 ta qadamli motor yordamida hosil qilinadi. O'z-o'zini moylaydigan texnopolimerlardan tayyorlangan komponentlar moylashni talab qilmaydi va texnik xizmat ko'rsatish uchun old tomondan kirish imkonini beradi. Xoreografik ketma-ketliklar kulrang gradatsiyali videodan yaratiladi, bunda yorqinlik qiymatlari harakat darajasini belgilaydi.
Tan olinish
A' Design Award Kumush Mukofoti haqida
Kwsa Kinetik Devor A' Design Award Kumush Mukofotining g‘olibi bo‘lib, bu go‘zal, ulug‘vor va ta’sirchan eng yuqori darajadagi dizaynlarga beriladigan favqulodda nufuzli e’tirofdir. Kumush g‘oliblari o‘z dizaynerlarining ajoyib mahorati, iste’dodi va o‘tkirligini ko‘rsatuvchi juda yorqin va o‘ta ijodiy asarlardir. Kwsa Kinetik Devor ajoyib, namunaviy, diqqatga sazovor darajada kasbiy va chuqur innovatsion asar bo‘lishi kutiladi. A' Design Award Kumush Mukofotini qo‘lga kiritgan ushbu dizayn san’at, fan, dizayn va texnologiya chegaralarini kengaytiruvchi juda e’tiborga loyiq, tahsinga sazovor ixtirodir. Kwsa Kinetik Devor ko‘pchilik havas qiladigan, istaklarni uyg‘otadigan, ijobiy tuyg‘ular olib keladigan hamda hayrat va ajablanish uyg‘otadigan ijoddir.
Dizayn ortida
Press-kit
Dizayner tomonidan taqdim etilgan kreditlar, jamoa a'zolari va texnik tafsilotlar.
- Noyob xususiyatlar
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- O'lchamlar va qadoqlash
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Teglar
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Ishlab chiqarish texnologiyasi
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Dizayn muammosi
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Tadqiqot
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Ilhom
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Loyiha muddati
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Ish jarayoni
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Jamoa a'zolari
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Homiylik
Designers.org dan tashqarini kashf eting
Reklama hamkorlarimizdan mahsulotlar, xizmatlar va imkoniyatlarni kashf eting.
Ko'proq kashf eting
Tegishli dizaynlar
Xuddi shu toifadan mukofotga sazovor bo'lgan boshqa dizaynlarni ko'ring, sifat bo'yicha tanlangan.