Skip to content
Mome Ikhampasi by 3h Architects Ltd.
Mome Ikhampasi by 3h Architects Ltd.
Mome Ikhampasi by 3h Architects Ltd.
Mome Ikhampasi by 3h Architects Ltd.
Mome Ikhampasi by 3h Architects Ltd.

Igolide Ezokwakha · 2021

Mome Ikhampasi

by 3h Architects Ltd.

  • Umklomelo Wegolide we-A' Design Award 2021 in Ezokwakha
  • CLIENT: 3h Architects
  • Estimated Number of Design Views: 31,691
  • Verification code 94E4234600 · Verify this award
Email this page

Colors

About Mome Ikhampasi

I-MOME iyikhampasi yenyuvesi eyakhelwe imfundo yobuciko nokuklama. Le khampasi yakhiwe izakhiwo ezintathu, ezibizwa ngokuthi i-Base, i-Master ne-Up. Isakhiwo esilenga se-Base sivumela ukusetshenziswa okuguquguqukayo kwaleso naleso sitezi, lapho amapuleti ezitezi ebanjwe umgogodla wensimbi ophindwe kathathu olenga emigqonyeni kakhonkolo enamandla e-post-tensioned. I-Up imbozwe uhlelo lwengilazi lwe-lamella olunamagobolondo amabili oluhlinzeka umthunzi nokungena komoya ngokwemvelo. Ku-Master, izindonga zangaphakathi zathathelwa indawo izindonga zengilazi ezivimba umsindo. Indawo yonke eyakhiwe iyizikwele mitha eziyi-15,851.

About the Umklomelo Wegolide we-A' Design Award

Mome Ikhampasi iwinile uMklomelo Wegolide we-A' Design Award, ukwaziswa okuhloniphekile kakhulu okunikezwa imiklamo yeklasi yokuqala, emangalisayo nephawulekile. Abawinile beGolide yimiklamo emisha kakhulu, enombono ongaphambili futhi egqamile ebonisa ubuhlakani, ukuhlakanipha nobuchule babaklami babo. Mome Ikhampasi ilindeleke ukuba ibe yinto entsha edunyiswe kakhulu, ebeka isitayela futhi ebalulekile elethe inani elingakaze libonwe. Lo mklamo owinile uMklomelo Wegolide we-A' Design Award ungumgomo omangalisayo nohlonishwayo osiza kakhulu futhi osunduza imingcele yobuciko, isayensi, ukuklama nobuchwepheshe. Mome Ikhampasi idala imizwa ejulile yesifiso, ivuse intshiseko, ikhuthaze ukudala futhi iyasiheha.

Press Kit

Unique Properties
The new campus is the manifestation of the university's advanced economic and educational model. The extended educational areas offer a studio-like teaching environment spatially revolutionizing the 21st century academic art practice. The building complex 'Base', 'Master' and 'Up' Innovation Centre brings forth a variety of unprecedented creative venues in the spirit of openness with the aim to provide such institutional spaces, which can stir the academic creation-process towards new waters.
Dimensions & Packaging
Gross built area: 15.851 (m2)
Tags
campus, modernism, transparency, analogue, bauhaus, arts, university, innovation, hub, transformation
Production Technology
Building B, BASE’s floating essence comes form a tripple steel core reinforcement suspended from from post-tensioned monolithic concrete beams, and hold the edges of the floor slabs. UP’s most notable technical element is the double-shell glass lamella system, which next to its visual appeal also has a shading function and provides natural ventillation. The MASTER’s inner walls have been torn down and replaced with soundproof glass walls during the building’s modernization process.
Design Challenge
The biggest challenge was mapping the terrain conditions of the location and finding the right placement for the main entrance of the new campus, meanwhile ensuring the plans harmonize with the already existing modern villa-like buildings on the site.
Research
The main goal of this design was to create such a learning and working enviroment which revolutionizes the 21st century academic art practice. To accomplish this goal the architects were working hand in hand with the university staff while coming up with the plans, inventing inner spaces that serve as a transformable,stimulating background for creative activities. This included weekly consulatations and numerous hours spent on researching this new spatio-educational model.
Inspiration
The inspiration came from the person the university is named after, Laszlo Moholy-Nagy, someone with an innovative, creative nature pushing artistic and technical boundaries - and through him, to the pioneering applied arts movement of the previous century, the Bauhaus. The fuel behind the design was to commemorate his oeuvres and significance as well as summoning a space which is to be the hotbed of contemporary artistic creation in Hungary.
Project Duration
The competition and call for submissions took place during October, 2015 for MOME University's stage 3 campus development. In the following January the results were announced, and the work begun after winning the competition: creating the concept, coming up with the construction plans and licensing. In the December of 2016 the planning phase closed and the construction took place between 2017-2019 June.
Operation Flow
The architectural design of the campus provides distinctive spatial solutions in each of the university’s three key buildings: the suspended structure of BASE maximizes the freedom to use different floors, and the horizontal and vertical transparency of building A encourages interdisciplinary dialogue. Meanwhile, the exterior of UP represents a new visual image for the university, and the interior provides a constant – and constantly changing – revelation.
Patents
Copyrights belong to 3h Architects, 2019
Image Credits
Main Image #1: 1_3h_mome_0027_web.jpg/ Photographer Balazs Danyi 2020
Optional Image#1: 2_1V3A8849a.jpg/ Photographer Tamas Bujnovszky 2020
Optional Image#2: 3_3h_mome_9635_web.jpg/ Photographer Balazs Danyi 2020
Optional Image#3: 4_3h_mome_9791_web.jpg /Photographer Balazs Danyi 2020
Optional Image#4: 5_base_388.jpg/Photographer Balazs Danyi 2020

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate