Skip to content
Cunda Despot House 酒店 by Isil Gencoglu

Cunda Despot House 酒店 by Isil Gencoglu is a highly esteemed winner of the very prestigious 2020 A' Design Award 金獎 in 文化遺產設計 Competition Category.


金文化遺產· 2020

Cunda Despot House 酒店

by Isil Gencoglu

Client: KHG Architecture

A' Design Award 金獎 Winner in 文化遺產 Category

39,103

Verified Award Winner

Verify Award Status for #100787

Colors

The Design

About Cunda Despot House 酒店

Cunda Despot House係位於土耳其艾瓦勒克嘅一座經修復嘅歷史建築,重新投入使用成為酒店。主樓及其蓄水池嘅修繕過程尊重原有嘅物料同建造技術。後期加建部分已被拆除,舊有嘅油漆同灰泥亦被清理。木地板、門、窗同樓梯均按照原貌重建,地基同結構系統亦得到加固。主樓設有二十間客房,另設餐廳、水療中心同泳池,以支援酒店功能。

The Recognition

About the A' Design Award 金獎

Cunda Despot House 酒店是 A' Design Award 金獎得主,這是授予一流、絕妙而傑出設計的極為崇高的認可。金獎得主是極具創新、極富遠見且璀璨奪目的創作,反映出其設計師的天才、智慧與才幹。預計Cunda Despot House 酒店將成為一項備受讚譽、引領潮流、氣勢恢宏的發明,帶來前所未有的價值。這件贏得 A' Design Award 金獎的設計是一個壯觀而受人敬重的項目,極大地造福並拓展藝術、科學、設計和技術的界限。Cunda Despot House 酒店激起強烈的渴望,喚起激情,鼓勵創造力,令我們著迷。

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Despot House has been taken from its ruins and it has taken its place in the world as part of 'protection and historical continuity' within the scope of a design and application work without damaging the original texture of the historical building.
Dimensions & Packaging
Despot House, which has hosted many functions until today, has been restored and brought to the present day with a hotel function. The existing main building and the Cistern structure serving it were re-functioned as a hotel by respecting the original materials and construction technique. Additional functions such as restaurants, spa baths and horizon pools supporting the existing structures are also considered within the building complex.

In order for the users to benefit from the services easily, a design aiming to keep the inter-connections of the functions strong is aimed.

The main building has 6 rooms on the basement, 7 rooms on the ground floor, 2 sofas and 2 terraces, and 7 rooms and a terrace on the first floor. The floors of the building are connected by a stylish wooden staircase.
The building elements that are available in the design of the 6 rooms in the basement floor and that can be used, have been cleaned and revealed. An integrated design has been created with contemporary materials. The area facing the sea front, previously used as a water tank, was reorganized and transformed into a spa room. Thus, some rooms are privatized with different qualities.
There are 7 rooms on the ground floor, two of which are suites. The king suite room on the sea front has a terrace opening to the view.
On the first floor, there are a total of 7 rooms, three of which are suites.
The restaurant structure with a capacity of approximately 150 people is designed for hotel users and non-hotel use. A lodge with a fireplace in the concept of the restaurant, indoor and outdoor eating and drinking areas with a view of the sea, and a bar section are organized. The bar in the restaurant also serves the pool users in the garden.
In the additional building complex planned to support the hotel function; there are Roman baths, massage rooms, saunas, steam rooms, shock and adventure showers. The fitness section with sports equipment is also designed in this complex. In this way, user comfort is aimed by providing the connection between the spaces.
Tags
Cunda, Ayvalik, Despot House, Traditional House, Hotel, Spa, Restaurant, Restoration, Renovation.
Production Technology
•Unauthentic attachments have been removed, herbaceous plants have been cleaned. All of the paints and plasters on the walls have been also cleaned by a scraper.
•Wooden floors have been completely renewed with impregnated wooden floors, rafter and purlines.
•The wooden floor coverings, which were destroyed as a result of the fire and destruction, were renewed with impregnated wooden beams and the floors were created. The wooden ladder, whose spine and steps were partially destroyed, was reconstructed in accordance with the original. The foundation of the building was reinforced by supporting curtains, jacketing was done. Roof construction and building elements were completely renewed.
•The first two floors of the building are made of garlic stone and the third floor is made of blend brick. Window and door jambs, floor moldings, garlic stones and columns were cleaned by scraper.
•The deformed building elements were renewed in accordance with the original. The destroyed wooden doors, windows and shutters were rebuilt from solid wood in accordance with the original.
•Deformed and rusted window and terrace railings were rebuilt according to the original. The wrought irons that were usable were cleaned and repaired.

•The columns carrying the terraces on the entrance and the sea front were deformed by exposure to external factors and bad weather conditions. These columns were reconstructed according to the original by using threshing brick.
•In line with the needs of the new function, the shafts of mechanical, electrical, ventilation, fire and sanitary installation were resolved in the installation galleries between the floors.
•In order not to disturb the continuity of the details and engravings on the ceilings, the wet spaces in the rooms were manufactured with a system consisting of steel and wooden structure.
•Applications for strengthening the structural system of the building were made by supporting with tie and tension rods. It was aimed to carry out a project that does not harm the originality and physical integrity of the building.
Design Challenge
The historical building is in an important location in the region. When the reconstruction started, it was aroused excitement and curiosity by the people of the region because it was abandoned for many years. This is an important responsibility for us. The bearing system of the building, the stairs, the walls are in a very bad condition, and it has required careful work. Difficulty was reached in transportation between floors because of the stairs were destroyed. The ceiling of the ground floor was destroyed. During the construction phase, the structural system was suspended and the structural system was rebuilt. Therefore, the construction site phase is a very difficult process.
Research
When we started the project, an important historical archive research was made. because an intervention that would damage this important historical structure would be to damage its precious history. we would never want that. For every detail of the building, we reached as old photos as possible, historical information, and even old Turkish movies taken in the building. We couldn't have missed any detail.
Inspiration
This building has hosted major events in the past. The story of the house was the inspiration for us. It made us excited to bring this valuable structure, which has remained idle for many years, back to life.
Project Duration
2018-2019 - Cunda Island,Ayvalik/Turkey
Team Members
Isıl Gencoglu (Architect,PhD.)
Suleyman Tasar (Architectural Restorator)
Team members:
Basak Gencoglu (Architect,MSc)
Busra Yucel (Architect)
Gokhan Manastirli (Architectural Restorator)
Gokhan Cokcetin (Civil Engineer)
H.Kubra Simsek (Architect,MSc Student)

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate