Skip to content
Ice Cave 售前辦公室 by Omid Amini and Fatemeh Salehi Amiri

Ice Cave 售前辦公室 by Omid Amini and Fatemeh Salehi Amiri is a highly esteemed winner of the very prestigious 2021 A' Design Award 金獎 in 室內空間及展覽設計 Competition Category.


金室內· 2021

Ice Cave 售前辦公室

by Omid Amini and Fatemeh Salehi Amiri

Client: Sizan

A' Design Award 金獎 Winner in 室內 Category

Colors

Email this page

The Design

About Ice Cave 售前辦公室

Ice Cave 是為需要獨特品質空間的客戶提供的陳列室。同時,能夠展示德黑蘭之眼項目的各種特性。根據項目的功能,一種有吸引力但中性的氛圍,用於根據需要展示對象和事件。使用最小表面邏輯是設計理念。一個集成的網格表面分佈在所有空間中。不同用途所需的空間是根據施加在表面上的上下方向的外力形成的。為了製造,這個表面被分成了 329 個面板。

The Recognition

About the A' Design Award 金獎

Ice Cave 售前辦公室是 A' Design Award 金獎得主,這是授予一流、絕妙而傑出設計的極為崇高的認可。金獎得主是極具創新、極富遠見且璀璨奪目的創作,反映出其設計師的天才、智慧與才幹。預計Ice Cave 售前辦公室將成為一項備受讚譽、引領潮流、氣勢恢宏的發明,帶來前所未有的價值。這件贏得 A' Design Award 金獎的設計是一個壯觀而受人敬重的項目,極大地造福並拓展藝術、科學、設計和技術的界限。Ice Cave 售前辦公室激起強烈的渴望,喚起激情,鼓勵創造力,令我們著迷。

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The need for an exhibition space and the potential to provide features, details, and replicas of the Tehran Eye project. Also, this section's location on the first floor and the use of two skylights for natural light provided very exclusive conditions for the design of a cave space, which provided a ceiling property or a free form as opposed to neutral walls. The emphasis of the space design was focused on the roof and columns, elements that provided a suitable basis for the design of this space.
Dimensions & Packaging
Ceiling: 290 m2
Ceiling Composite panels: 329
Floor: 200 m2
Tags
Minimal Surface, Digital fabrication, computational design, Digital design
Production Technology
The logic of minimal surfaces was used according to the project's need for an attractive yet neutral atmosphere for showing the project's predicted function.
For Fabrication, this surface has been divided into several panels (329 double curve composite panels). The main constraint for products these panels is using a three-axis CNC machine (Styrofoam block with a density of 37 kg-m3, 1.1.2 m3). At the same time, the method of installing panels and details of connecting to the main structure has also been taken into consideration.
Design Challenge
construction, a few points, needed research, at least the change in the size of the parts based on climate change that sometimes reaches forty degrees Celsius, on the other hand, due to the general use of this project and the rapid flammability of the composite Need fire retardant or fire-retardant compounds.
facilities, due to the middle space between the shell and the structural roof, this section was used to reduce the energy required for air circulation.
green wall section, the use of the most suitable type of these walls, as well as plants and irrigation conditions and light required by plants, are among the items studied.
Research
Type of research: Use of current world articles and journals
Objectives of the research: Making a free-form shell with the least use of materials and in the shortest possible time, using the project facilities to save more energy consumption for the cooling and heating system, using green space with optimal irrigation in mind.
Due to the different parts of the project, several topics were important for initial research and studies.
-design section, what needed more research and study in this section was the optimization of consumables and construction stages according to local materials and devices.
Inspiration
Icy cave project has been designed and built in order to presell commercial units of a commercial-recreational Tehran Eye complex. In its early years of operation, this space will be used for selling commercial units. Then, it will be transformed into an event hall. Therefore, this issue has been taken into consideration in the design of this project, and it's fixed as well as the mobile layout of the furniture.
Project Duration
The project started in April 2016 in Tehran, Iran, and finished in June 2018, and was a sale office for selling stores of Tehran eye Commercial and entertainment complex.
Operation Flow
Visitors are first confronted with a section that can personally use the provided tools to overview the different sections and general and technical information of the Tehran Eye.
then they introduced the project with the guidance of staff using wall-mounted displays. In the second part, customers can sit next to fixed and movable furniture, and listen to the sales manager's explanations. In the final stage, visitors face sitting or standing with a large screen that is projected.
Patents
For copyrights: "Copyrights belong to Fatemeh Salehi Amiri, 2018."

For trademarks: "Sizan (2011) Fatemeh Salehi Amiri, Omid Amini, Avid Amini"
Team Members
Architecture Firm:
Omid Amini and Partners
Architects in charge:
Omid Amini
Fatemeh Salehi Amiri
Design Team:
Mehrad Mahnia
Fatemeh Salehi Amiri
Executive Manager:
Fatemeh Salehi Amiri
Omid Amini
Supervisor:
Fatemeh Salehi Amiri
Mehrad Mahnia
Contractor:
Sizan Company
Image Credits
Image #1: Photographer Parham Taghiof (Persia Photography Center), Ice Cave, 2018.
Image #2: Photographer Parham Taghiof (Persia Photography Center), Ice Cave, 2018.
Image #3: Photographer Parham Taghiof (Persia Photography Center), Ice Cave, 2018.
Image #4: Photographer Parham Taghiof (Persia Photography Center), Ice Cave, 2018.
Image #5: Photographer Parham Taghiof (Persia Photography Center), Ice Cave, 2018.

Other Images: Photographer Masih Mostajeran (Deed Studio)

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate