Tianliao 消防站 by Suiadr is a highly esteemed winner of the very prestigious 2021 A' Design Award 鐵獎 in 建築、樓宇及結構設計 Competition Category.
鐵建築· 2021
Tianliao 消防站
by Suiadr
Client: The Institute of Architectural Design and Research, Shenzhen University
A' Design Award 鐵獎 Winner in 建築 Category
Verified Award Winner
Verify Award Status for #117138The Design
About Tianliao 消防站
天寮消防站位於中國深圳市光明區,是一座消防站建築。建築採用集中式佈局,將三層辦公樓與七層訓練塔結合為一體。總建築面積為5,039.5平方米,其中地上建築面積為3,985平方米,容積率為0.97。室內地坪高於市政道路,以防止雨水倒灌。開放空間設於低層,確保日常訓練不受干擾。基地內多處設有花園。
The Recognition
About the A' Design Award 鐵獎
Tianliao 消防站是 A' Design Award 鐵獎得主,這是授予滿足人們對設計精良的創作所期待的專業與工業要求的優良設計的聲望認可。鐵獎得主展現出其創作者的高超技藝、高度專業化、專家級的理解力和創造能力。預計Tianliao 消防站將成為一件備受推崇、令人欽佩且被珍愛的創作,既實用又創新。這件贏得 A' Design Award 鐵獎的設計整合了行業最佳實踐,並擁有與專業知識和才華相結合的稱職技術特性。Tianliao 消防站因其嚴謹而受到尊重,旨在提供有助於讓世界變得更美好的生活品質改善。
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- It's a new fire station with a centralized layout. The vertical design makes the station almost as tall as the Huanguang Road. The internal elevation of the station is higher than that of the municipal road, preventing rainwater from flowing into the inside. The layout meets the requirements of setback, sunshine and fire prevention, etc. The pedestrian entrance and exit are at the southwest side. The open areas are mainly at 1F and the mezzanine, making no influence on firemen's daily training.
- Dimensions & Packaging
- Its gross floor area is 5,039.5 sqm with 3,985 sqm above the ground. It has a 3-story office building and a 7-story training tower. The floor area ratio is 0.97. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation. The septic tank and oil separator tank adopt integrated equipment like glass steel. The energy-saving water heating system uses solar power and air force heat pump.
- Tags
- Fire station, centralized layout, standardization, setback, multi-layer public building, infrastructure, The Institute of Architectural Design and Research, Shenzhen University, Z&Z STUDIO
- Production Technology
- 1. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation.
2. The project mainly uses reinforced concrete frame structure and the base adopts independent column-shaped and bar-shaped waterproof slabs. The roof uses cast-in-situ reinforced concrete slab system with main and secondary beams. Secondary beams are set properly to reduce the plane size of slab avoiding too much material waste. - Design Challenge
- Building setback: Due to the limited land, it was possible to set back building in accordance with the official requirements. After several times of negotiation with the planning bureau, the design team reached a reasonable bargain: the plot is set back 2.3m on the east, 6.05m on the south, 2.3m on the west and 1.8m on the north. In this way, the fire station and sports fields were reasonably arranged within the limited land.
- Research
- The design must follow the research results of "the 2014 Shenzhen Fire Station Standardization Design Workshop". It shall establish the construction standards of Shenzhen fire stations. The experience of it can also provide reference for domestic fire stations. The design should satisfy basic needs, consider the possibility of the profession development, and embody the considerations of openness and cultural promotion of fire control. It has won a second prize awarded by SUIADR in 2020.
- Inspiration
- Located in Guangming District, Shenzhen, the project occupies the land of 4,099.16 m2, with the planned Huanguang Road on the west, the planned Nantian Road on the north, Nangen Road on the south and Mobi Antenna Technology (Shenzhen) Co., Ltd. on the east. As a first-class fire house, its gross floor area is 5,039.5 m2 with 3,985 m2 above the ground and 1,054.5 m2 underground. It consists of a three-story office building and a seven-story training tower.
- Project Duration
- Starting time: November 10, 2016
Completion time : July 20, 2020
Location: Guangming District, Shenzhen - Operation Flow
- The parking garage for fire trucks faces the street. The visiting entrance and exit is at the southwest side of the plot. The open areas are at 1F and 2F, the foyer and canteen at 1F. Firemen's preparation rooms are on 2F with a bathroom and a shower room on the west. 3F houses offices and auxiliary rooms and the basement has an emergency storeroom and equipment room. Gardens are set at many places, enriching firemen’s life.
- Team Members
- Zhong Zhong, Zhong Botao, Wang Min, Zhong Haihuan、Zeng Yusheng、Su Xiaoyue、Deng Rixing
Liu Mu、Yong Yong、An Huijuan、Zhou Jie、Cao Jiying、Xiong Feng、He Xiaoming、Wang Wei
Ye Zhien、Wu Zhirong - Image Credits
- Tian Tengfei
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.