Skip to content
Reconstruction in Pudong Shanghai 醫院建築 by Thad

Reconstruction in Pudong Shanghai 醫院建築 by Thad is a highly esteemed winner of the very prestigious 2021 A' Design Award 銅獎 in 建築、樓宇及結構設計 Competition Category.


銅建築· 2021

Reconstruction in Pudong Shanghai 醫院建築

by Thad

Client: Architectural Design and Research Institute of Tsinghua University Co.,Ltd.

A' Design Award 銅獎 Winner in 建築 Category

9,661

Verified Award Winner

Verify Award Status for #121374

Colors

The Design

About Reconstruction in Pudong Shanghai 醫院建築

書本文字:上海浦東的重建項目是中國上海一間公立醫院門診及急診醫療技術綜合大樓嘅重建同擴建工程。設計將新建工程同重建一個運作中場地嘅複雜性結合埋一齊。工程分為四個階段:拆卸、過渡、重建同復修。喺過渡階段,臨時建築同改建嘅現有建築確保醫療服務持續運作。外牆採用白色鋁板,轉角位置用木紋鋁板,配以落地玻璃窗。

The Recognition

About the A' Design Award 銅獎

Reconstruction in Pudong Shanghai 醫院建築是 A' Design Award 銅獎得主,這是授予以創造力、獨創性和敏銳見長的傑出設計的極具聲望的認可。銅獎得主是技藝嫻熟、創意驚人的作品,印證了其設計師豐富的經驗、想像力與機智。預計Reconstruction in Pudong Shanghai 醫院建築將成為一件備受推崇、令人欽佩且被珍愛的物品,兼具顯著的專業性與創新性。這件贏得 A' Design Award 銅獎的設計融入藝術、科學、設計和技術領域的最佳實踐,並因注重細節而出類拔萃。Reconstruction in Pudong Shanghai 醫院建築出色地滿足需求,觸動渴望,迷住情感,並吸引好奇心。

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
This project is reconstruction and expansion project of the outpatient and emergency medical Technology complex building of the People's Hospital in Pudong New District, Shanghai, China.It has the modernity of new buildings and the complexity of reconstruction and expansion. The generation of the building is post-occupancy evaluation combined with Chinese traditional Yin-Yang theory.
Dimensions & Packaging
the project is with buildings scale of 135,357 square meters and an area of 45,108.7 square meters
Tags
Architecture, Design, Hospital, Reconstruction, Restoration
Production Technology
The facade of the building is made of 2 kinds of aluminum plate. Mainly uses white aluminum. In the conner of the facades, architects use wood grain aluminum plate. Floor-to-ceiling windows are widely used by the new building.
Design Challenge
Transition project stage: In order to demolish the existing buildings in the new building land, the form of temporary turnover needs to be adopted. Architects transformed function of office buildings and wards to outpatient units. In order to meet the needs of normal business development during the transition period, 3,200 square meters of temporary buildings were built and 13,199 square meters of existing buildings were integrated and transformed. Restoration and renovation project stage: demolish the science and education building, dormitory building, Meixian building, ground machinery garage, activity center (canteen), east gate guard, garbage room, etc. on the red line of the transition project site; demolish the temporarily built outpatient building in the site.
Research
Due to the particularity of the reconstruction and expansion projects, it is necessary to conduct an in-depth post-occupancy evaluation of the existing functions and environment.Due to the particularity of the hospital building, it is necessary to adopt systematic concepts and methods. The hospital building includes three basic processes of human flow, logistics, and information flow. From the overall planning and single plan design, specific analysis should be made for different types of human flow and logistics according to the difficulties of hospital construction. Architects decided to Step-by-step implementation of construction, Demolition-Transition-Reconstruction-Restoration.
Inspiration
In order to build a large-scale modern hospital in China, the project reconstructs and expanses an outpatient and emergency medical technology complex building. Design adjusted functional optimization overall of the new and old buildings to achieve four design goals: Change the current existing traffic system and functional process problems; Build the hospital's aortic traffic; Strengthen the positioning and construction of key departments; improve the hospital environment and quality.
Project Duration
The project started in May 2018 and will be finished in 2025 in Shanghai, China.
Operation Flow
The hospital is operated by the government. Due to the outdated construction facilities of the outpatient building and medical technology building, and insufficient functional space, the medical process cannot meet the service demand. The architects carried out the reconstruction and expansion of the outpatient and emergency medical technology complex building on the basis of the demolition of the existing outpatient building, medical technology building and other old buildings in the People's Hospital of Pudong New Area.
Team Members
Yao Hong, Fu Liewu, Li Fei, Wang Xiaohan, Cai Zhengqiang, Jin Cheng, Meng Xianghao, Zhang Lan, Hu Bo
Image Credits
Image #1: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #2: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #3: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #4: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.
Image #5: Architectural Design & Research Institute Tsinghua University, Beijing, 2021.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate