Skip to content
Quectel Global Center 寫字樓大廈 by Quectel Wireless Solutions Co., Ltd.
Quectel Global Center 寫字樓大廈 by Quectel Wireless Solutions Co., Ltd.
Quectel Global Center 寫字樓大廈 by Quectel Wireless Solutions Co., Ltd.
Quectel Global Center 寫字樓大廈 by Quectel Wireless Solutions Co., Ltd.
Quectel Global Center 寫字樓大廈 by Quectel Wireless Solutions Co., Ltd.

白金 房地產 · 2026

Quectel Global Center 寫字樓大廈

by Quectel Wireless Solutions Co., Ltd.

  • A' Design Award 白金獎 2026 in 房地產
  • CLIENT: Quectel Wireless Solutions Co., Ltd.
  • Estimated Number of Design Views: 937,237
  • Verification code 045BAD24C4 · Verify this award
Email this page

Colors

About Quectel Global Center 寫字樓大廈

移遠通信全球中心係一座位於上海嘅寫字樓大廈。設計將內部辦公功能同公共展覽空間結合。辦公樓層朝向河畔,享有開闊景觀。外立面採用流暢嘅水平線條、鋁板同中空玻璃幕牆,營造出簡潔而現代嘅視覺形象。互相咬合、錯落有致嘅佈局形成樓梯、露台同天台花園,方便非正式交流同休息。地面層架空開放,形成一條通道,將建築物同周邊城市連繫起來。

About the A' Design Award 白金獎

Quectel Global Center 寫字樓大廈是 A' Design Award 白金獎得主,這是授予真正卓越、優雅和宏偉設計的極具聲望的認可。白金獎得主是創造的奇蹟,是智力創造力極限的見證,展現出其設計師無與倫比的專業精神和天才。這些設計被期待成為定義一個時代的美學、造福社會、並拓展藝術、科學、設計和技術界限的最負盛名的作品。Quectel Global Center 寫字樓大廈展現出超凡脫俗的卓越水準,以其有益而寶貴的特質毫無疑問地讓世界變得更美好。Quectel Global Center 寫字樓大廈是一件贏得 A' Design Award 白金獎的作品,它喚起慾望,啟發人心,令人愉悅,並迸發出巨大的喜悅。

Press Kit

Unique Properties
Quectel Global Center creates an efficient, health conscious, and creativity inspiring work environment. It merges internal office functions with public facing exhibition capabilities. The office areas face the riverside, maximizing scenic views. The street facing areas enhance public engagement and reinforce brand presence through an open passage. The project perfectly balances office efficiency, brand expression, and urban ecology, setting a new paradigm for high tech corporate headquarters.
Dimensions & Packaging
Total construction area: 102353 square meter
Tags
Office Building Design, Open Passage, Interlocking Layout, Horizontal Lines, Glass Curtain Walls, Clear Functional Zoning, Flexible and Shared Spaces, Green and Efficient
Production Technology
Externally, aluminum panels are finished with a PVDF coating, while insulating LOW E glass is fabricated using magnetron sputtering. Together, these materials not only enhance the weather resistance and thermal insulation of the building but also present a clean, modern aesthetic.
Internally, marble tiles, wood veneers, rectangular aluminum tubing, PVC flooring, and engineered quartz are widely applied, improving visual appeal while ensuring sustainability, durability, and moisture resistance.
Design Challenge
The challenge was creating a spatial system that fosters internal connectivity while ensuring operational independence. The project addresses this through an approach of shared building and differentiated organization. A central elevator system provides access across all floors for core departments, while dedicated elevators for the management balance privacy with efficiency. This translates complex, competing requirements into a clear, flexible, and highly efficient spatial framework.
Research
The project recognizes that corporate headquarters in urban cores must balance internal operational efficiency, external brand representation, and social public contribution. Based on rigorous site analysis, it adopts a strategy of separating dynamic and static zones while distinguishing internal and external functions. At the same time, it utilizes the raised ground floor and 3D greenery, transforming office spaces into an open complex that coexists harmoniously with the city and ecology.
Inspiration
Drawing inspiration from the corporate core philosophy of connecting everything, the project employs an interlocking, staggered layout, symbolizing both the close collaboration among internal teams and the deep integration between the company and the city. The facade features fluid horizontal lines that abstractly evoke the flow of information, echoing the essence of the telecommunications industry. Paired with transparent glass curtain walls, it creates a futuristic, high tech visual identity.
Project Duration
The project started in Shanghai in December 2021, with its groundbreaking ceremony held on May 18, 2023. It was completed on December 5, 2025, and entered service by the end of December 2025.
Operation Flow
The project creates a dual circulation system focused on efficiency and experience. The office areas are served by dedicated elevators for efficient personnel movement. The interlocking layout generates stairs, terraces, and rooftop gardens, offering spaces for informal interaction and relaxation. Moreover, the open raised ground floor acts as a transitional interface between the building and the city, effectively guiding foot traffic and fostering engagement between the company and the public.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate