Hours on the Slope Fabriek, Kantoorgebou by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 A' Design Award in Brons in Argitektuur-, Gebou- en Struktuurontwerp Competition Category.
BronsArgitektuur· 2021
Hours on the Slope Fabriek, Kantoorgebou
by T.E and C Architects Associates
Client: T.E and C Architects Associates
A' Design Award in Brons Winner in Argitektuur Category
- 10,487
- Verified Award Winner
- Verify Award Status for #106869
The Design
About Hours on the Slope Fabriek, Kantoorgebou
Ure op die Helling is 'n fabriek- en kantoorkompleks in Taichung, Taiwan. Die terrein is verdeel in drie geboue wat gerangskik is in reaksie op die omgewing en oriëntasie. Aan die westekant, waar sonblootstelling hoog is, beklemtoon donker vensters en verminderde vensteroppervlaktes die gevoel van volume. Graniet en 'n groen gebou-bedekkingstelsel bedek die buitemure. Natuurlike klipmosaïek is gekies vir die geboë oppervlak van die kantoorgebou. 'n Begrawe pypleidingstelsel lei koel buitelug na die aanleg, en sonpanele op die dak verskaf skaduwee aan die parkeerarea op die boonste vloer.
The Recognition
About the A' Design Award in Brons
Hours on the Slope Fabriek, Kantoorgebou is 'n wenner van die A' Design Award in Brons, 'n hoogs prestigieuse erkenning wat toegeken word aan uitstaande ontwerpe wat gekenmerk word deur kreatiwiteit, vindingrykheid en skerpsinnigheid. Wenners in Brons is ruimskoots vaardige en opvallend kreatiewe artefakte wat die groot ervaring, verbeelding en vindingrykheid van hul ontwerpers bevestig. Daar word verwag dat Hours on the Slope Fabriek, Kantoorgebou 'n hoog aangeskrewe, bewonderde en gekoesterde voorwerp is wat merkwaardig professioneel en innoverend is. Hierdie ontwerp wat die A' Design Award in Brons gewen het, inkorporeer die beste praktyke in kuns, wetenskap, ontwerp en tegnologie en is uitstekend vanweë sy aandag aan detail. Hours on the Slope Fabriek, Kantoorgebou bevredig behoeftes pragtig, raak aan begeertes, bekoor gevoelens en spreek die nuuskierigheid aan.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Dimensions & Packaging
- The project is 63767 square meter.
- Tags
- Architecture, Factory, Office, Plant, Building
- Production Technology
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Design Challenge
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Research
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inspiration
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Project Duration
- The project finished in December 2018 in Taichung, Taiwan.
- Operation Flow
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Team Members
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Image Credits
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.