Hours on the Slope Fabrika, Poslovna zgrada by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 Brončana nagrada A' Design Award in Dizajn Arhitekture, Zgrada i Konstrukcija Competition Category.
BronzaArhitektura· 2021
Hours on the Slope Fabrika, Poslovna zgrada
by T.E and C Architects Associates
Client: T.E and C Architects Associates
Brončana nagrada A' Design Award Winner in Arhitektura Category
Verified Award Winner
Verify Award Status for #106869The Design
About Hours on the Slope Fabrika, Poslovna zgrada
Sati na Padini je fabrički i poslovni kompleks u Taichungu, Tajvan. Parcela je podijeljena na tri zgrade raspoređene u skladu sa okolinom i orijentacijom. Na zapadnoj strani, gdje je izloženost suncu velika, tamni prozori i smanjena površina otvora naglašavaju osjećaj volumena. Granit i sistem zelene građevinske obloge prekrivaju vanjske zidove. Za zakrivljenu površinu poslovne zgrade odabran je mozaik od prirodnog kamena. Ukopani cjevovodni sistem usmjerava hladan vanjski zrak u pogon, dok solarni paneli na krovu pružaju sjenu parkirnom prostoru na najvišem katu.
The Recognition
About the Brončana nagrada A' Design Award
Hours on the Slope Fabrika, Poslovna zgrada je pobjednik Brončane nagrade A' Design Award, visoko prestižnog priznanja koje se dodjeljuje izvanrednim dizajnima što se odlikuju kreativnošću, domišljatošću i oštroumnošću. Brončani pobjednici izdašno su vješti i upečatljivo kreativni artefakti koji potvrđuju golemo iskustvo, maštu i snalažljivost svojih dizajnera. Očekuje se da Hours on the Slope Fabrika, Poslovna zgrada bude visoko cijenjen, voljen i njegovan predmet koji je izuzetno profesionalan i inovativan. Ovaj dizajn koji je osvojio Brončanu nagradu A' Design Award uključuje najbolje prakse u umjetnosti, nauci, dizajnu i tehnologiji i izvrstan je zbog pažnje posvećene detaljima. Hours on the Slope Fabrika, Poslovna zgrada sjajno zadovoljava potrebe, dotiče želje, očarava osjećaje i privlači znatiželju.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Dimensions & Packaging
- The project is 63767 square meter.
- Tags
- Architecture, Factory, Office, Plant, Building
- Production Technology
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Design Challenge
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Research
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inspiration
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Project Duration
- The project finished in December 2018 in Taichung, Taiwan.
- Operation Flow
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Team Members
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Image Credits
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.