Hours on the Slope Tovární a kancelářská budova by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 Bronzová cena A' Design Award in Architektura Competition Category.
BronzArchitektura· 2021
Hours on the Slope Tovární a kancelářská budova
by T.E and C Architects Associates
Client: T.E and C Architects Associates
Bronzová cena A' Design Award Winner in Architektura Category
Verified Award Winner
Verify Award Status for #106869The Design
About Hours on the Slope Tovární a kancelářská budova
Hours on the Slope je tovární a kancelářský komplex v Taichungu na Tchaj-wanu. Pozemek je rozdělen do tří budov uspořádaných s ohledem na okolní prostředí a orientaci ke světovým stranám. Na západní straně, kde je vysoká sluneční expozice, tmavá okna a zmenšené plochy oken zdůrazňují pocit hmoty. Vnější stěny pokrývá žula a zelený systém stavebních nátěrů. Pro zakřivený povrch kancelářské budovy byla zvolena mozaika z přírodního kamene. Podzemní potrubní systém přivádí chladný venkovní vzduch do provozu a solární panely na střeše stíní parkovací plochu na nejvyšším podlaží.
The Recognition
About the Bronzová cena A' Design Award
Hours on the Slope Tovární a kancelářská budova je vítězem Bronzové ceny A' Design Award, vysoce prestižního uznání udělovaného vynikajícím designům, které se vyznačují kreativitou, vynalézavostí a bystrostí. Bronzoví vítězové jsou hojně zručné a nápadně kreativní artefakty, které dosvědčují rozsáhlé zkušenosti, představivost a vynalézavost svých designérů. Očekává se, že Hours on the Slope Tovární a kancelářská budova bude vysoce ceněným, obdivovaným a milovaným předmětem, pozoruhodně profesionálním a inovativním. Tento design, který získal Bronzovou cenu A' Design Award, zahrnuje osvědčené postupy v umění, vědě, designu a technologiích a vyniká pozorností k detailu. Hours on the Slope Tovární a kancelářská budova nádherně uspokojuje potřeby, dotýká se tužeb, okouzluje city a oslovuje zvědavost.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Dimensions & Packaging
- The project is 63767 square meter.
- Tags
- Architecture, Factory, Office, Plant, Building
- Production Technology
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Design Challenge
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Research
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inspiration
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Project Duration
- The project finished in December 2018 in Taichung, Taiwan.
- Operation Flow
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Team Members
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Image Credits
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.