Hours on the Slope Fabryk, Kantoargebou troch T.E and C Architects Associates is in heech wurdearre winner fan de tige prestizjeuze 2021 A' Design Award yn Brûns yn de kompetysje-kategory Arsjitektuer, Gebou en Struktuerûntwerp.
BrûnsArsjitektuer· 2021
Hours on the Slope Fabryk, Kantoargebou
troch T.E and C Architects Associates
Klant: T.E and C Architects Associates
A' Design Award yn Brûns Winner yn de kategory Arsjitektuer
Ferifiearre Priiswinner
Ferifiearje Prisstatus foar #106869It Untwerp
Oer Hours on the Slope Fabryk, Kantoargebou
Hours on the Slope is in fabryks- en kantoarkompleks yn Taichung, Taiwan. It terrein is ferdield yn trije gebouwen dy't ynrjochte binne yn reaksje op de omjouwing en de oriïntaasje. Oan de westkant, dêr't de sinneblootstelling heech is, benadrukje donkere finsters en fermindere finsterareaal it gefoel fan folume. Granyt en in grien gebousysteem foar de gevelbekleding dekke de bûtenmuorren. Foar it kromme oerflak fan it kantoargebou is keazen foar in mozayk fan natuersteen. In ûndergrûnske liedingsysteem liedt kâlde bûtenlucht it fabrykskompleks yn, en sinnepanielen op it dak jouwe skaad oan it parkearterrein op de boppeste ferdjipping.
De Erkenning
Oer de A' Design Award yn Brûns
Hours on the Slope Fabryk, Kantoargebou is in winner fan de A' Design Award yn Brûns, in heech prestisjeuze erkenning foar treflike ûntwerpen dy't har ûnderskiede troch kreativiteit, fernuft en tûkens. Brûnswinners binne tige feardige en opfallend kreative artefakten dy't de grutte ûnderfining, ferbylding en betochtsumens fan har ûntwerpers befêstigje. Fan Hours on the Slope Fabryk, Kantoargebou wurdt ferwachte dat it in tige heech achte, bewûndere en dierber objekt is dat opmerklik profesjoneel en ynnovatyf is. Dit winnende ûntwerp fan de A' Design Award yn Brûns yntegrearret de bêste praktiken yn keunst, wittenskip, ûntwerp en technology en is treflik om syn omtinken foar detail. Hours on the Slope Fabryk, Kantoargebou foldocht behoeften prachtich, reitsjet winsken, betsjoeveret gefoelens en sprekt nijsgjirrigens oan.
Efter it Untwerp
Parsepakket
Credits, teamleden en technyske details levere troch de ûntwerper.
- Unike Eigenskippen
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Ofmjittingen & Ferpakking
- The project is 63767 square meter.
- Labels
- Architecture, Factory, Office, Plant, Building
- Produksjetechnology
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Untwerpútdaging
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Undersyk
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Ynspiraasje
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Projektdoer
- The project finished in December 2018 in Taichung, Taiwan.
- Operaasjestreamferrin
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Teamleden
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Ofbyldingskrediten
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Sponsore
Ferkenne Fierder as Designers.org
Untdek produkten, tsjinsten en mooglikheden fan ús reklamepartners.
Mear te Ûntdekken
Relatearre Untwerpen
Ûntdek mear priiswinnende ûntwerpen út deselde kategory, selektearre op fertsjinste.