Is buaiteoir an-mheasúil den ghradam fíor-ardghradamach 2021 Duais Cré-umha A' Design Award sa Chatagóir Comórtais Dearadh Ailtireachta, Foirgníochta agus Struchtúir é an dearadh Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige le T.E and C Architects Associates.
Cré-umhaAiltireacht· 2021
Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige
le T.E and C Architects Associates
Cliant: T.E and C Architects Associates
Buaiteoir an ghradaim Duais Cré-umha A' Design Award sa Chatagóir Ailtireacht
Buaiteoir Gradaim Fíoraithe
Fíoraigh Stádas Gradaim do #106869An Dearadh
Maidir le Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige
Téacs an Leabhair: Is coimpléasc monarchan agus oifige é Hours on the Slope i Taichung, an Téaváin. Tá an suíomh roinnte ina thrí fhoirgneamh atá leagtha amach mar fhreagra ar an gcomhshaol agus ar an dtreoshuíomh. Ar an taobh thiar, áit a bhfuil nochtadh gréine ard, cuireann fuinneoga dorcha agus achair fuinneoige laghdaithe béim ar an mbraistint imleabhair. Clúdaíonn eibhear agus córas brataithe glas foirgníochta na ballaí seachtracha. Roghnaíodh mósáic chloiche nádúrtha don dromchla cuartha ar an bhfoirgneamh oifige. Treoraíonn córas píobán faoi thalamh aer fionnuar amuigh isteach sa mhonarcha, agus tugann painéil ghréine ar an díon scáth don limistéar páirceála ar an urlár uachtarach.
An Aitheantas
Maidir leis an Duais Cré-umha A' Design Award
Bhuaigh an dearadh Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige Duais Cré-umha A' Design Award, aitheantas an-ghradamach a bhronntar ar dhearaí sármhaithe a mbíonn cruthaitheacht, aireagacht agus géarchúis mar shaintréithe acu. Is déantúsáin ghlic agus chruthaitheacha go suntasach iad buaiteoirí Cré-umha a dhearbhaíonn taithí fhairsing, samhlaíocht agus acmhainneacht a ndearthóirí. Táthar ag súil go mbeidh an dearadh Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige ina rud a bhfuil an-mheas air, a n-ardaítear agus a ghráitear, atá thar a bheith gairmiúil agus nuálach. Ionchorpraíonn an dearadh seo a bhuaigh Duais Cré-umha A' Design Award na cleachtais is fearr san ealaín, san eolaíocht, sa dearadh agus sa teicneolaíocht, agus tá sé sármhaith as a aird ar mhionsonraí. Sásaíonn an dearadh Hours on the Slope Príomhfheidhm: Monarcha, Foirgneamh Oifige riachtanais go hálainn, bainíonn sé le mianta, cuireann sé draíocht ar mhothúcháin agus tarraingíonn sé fiosracht.
Taobh Thiar den Dearadh
Pacáiste Preasa
Creidiúintí, baill foirne agus sonraí teicniúla curtha ar fáil ag an dearthóir.
- Airíonna Uathúla
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Toisí & Pacáistiú
- The project is 63767 square meter.
- Clibeanna
- Architecture, Factory, Office, Plant, Building
- Teicneolaíocht Táirgthe
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Dúshlán Deartha
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Taighde
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inspioráid
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Fad an Tionscadail
- The project finished in December 2018 in Taichung, Taiwan.
- Sreabhadh Oibríochta
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Baill Foirne
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Creidiúintí Íomhá
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Urraithe
Déan Iniúchadh Lasmuigh de Designers.org
Aimsigh táirgí, seirbhísí agus deiseanna ónár gcomhpháirtithe fógraíochta.
Tuilleadh le hIniúchadh
Dearaí Gaolmhara
Déan iniúchadh ar thuilleadh dearaí a bhuaigh gradam sa chatagóir chéanna, roghnaithe de réir fiúntais.