Ór Ailtireacht · 2024
Aida Sekkei Precut Monarcha
- Duais Óir A' Design Award 2024 in Ailtireacht
- CLIENT: Aida Sekkei Co., Ltd.
- Estimated Number of Design Views: 148,971
- Verification code 60275D61D5 · Verify this award
Colors
About Aida Sekkei Precut Monarcha
Díríonn plean monarchan nua Aida Sekkei ar réamhghearradh adhmaid. Baineann a choincheap go hiomlán le hailtireacht a chruthú a léiríonn an tsraith phróiseála adhmaid. Áirítear ann siúlbhealach ar foluain, gloine-dhruidte thart ar 100 méadar ar fad laistigh den mhonarcha, deartha le go bhféadfaidh cuairteoirí breathnú go dlúth ar an bpróiseas réamhghearrtha iomlán. Tá spásanna móra san fhoirgneamh oifige le truiseanna déanta as ábhair imeall cleite, a úsáidtear go coitianta mar fho-ábhair i dtithe adhmaid. Comhtháthaíonn an dearadh gach eilimint chun monarcha taispeána a chruthú, ag cur béime ar infheictheacht agus ar tharraingteacht aeistéitiúil i ngach gné.
About the Duais Óir A' Design Award
Bhuaigh an dearadh Aida Sekkei Precut Monarcha Duais Óir A' Design Award, aitheantas thar a bheith clúiteach a bhronntar ar dhearaí den chéad scoth, iontacha agus sármhaithe. Is cruthuithe an-nuálacha, fíorasacha agus drithleacha iad buaiteoirí Óir a léiríonn géiniais, eagna agus máistreacht a ndearthóirí. Táthar ag súil go mbeidh an dearadh Aida Sekkei Precut Monarcha ina aireagán a mholtar go mór, ceannródaíoch agus séadchomharthach a sholáthraíonn luach nach bhfacthas riamh cheana. Is tionscadal iontach, measúil é an dearadh seo a bhuaigh Duais Óir A' Design Award a dhéanann sárleas do theorainneacha na healaíne, na heolaíochta, an deartha agus na teicneolaíochta agus a chuireann chun cinn iad. Cruthaíonn an dearadh Aida Sekkei Precut Monarcha mothúcháin dhian mhianta, músclaíonn sé paisean, spreagann sé cruthaitheacht agus cuireann sé draíocht orainn.
Press Kit
- Unique Properties
- This is a project of a new timber processing plant for precut lumber. Its design concept is all about creating an architecture that embodies the series of timber processing. The almost 100-meter-long viewing aisle encased in a random stripe wooden shell is cantilevered and appears as if it floats from the factory building wall. The aim of the impressive façade design with a sense of acceleration and speed is to provoke the image of Aida Sekkei’s further evolution towards the future.
- Dimensions & Packaging
- Site area: 40,023.50 m2
Building area: 14,614.43 m2
Total floor area: 15,206.32 m2
Office Building(2F)
1st floor: 458.21 m2
2nd floor: 429.28 m2
Number of floors: 2 above ground
Height: Maximum height 10.86 m,
Structure: Wooden
Factory Building(2F)
1st floor: 13,886.39 m2
2nd floor: 380.70 m2 - Tags
- architecture, factory, wooden, truss, pre-cut, Factory tour, Japan
- Production Technology
- As for the office, which is the face of the plant, we created one large space by building a scissor truss using members of smaller cross sections (30 mm by 120mm size lumber used as supplementary members such as wall studs of a home). 120mm square Japanese cypress pillars are placed every 303 mm of the wall and to construct load-bearing walls, a 30 mm thick cedar board was inserted between the pillars.
- Design Challenge
- When constructing large-span wooden structures, it's common to use specialized and expensive materials such as large-diameter engineered lumber. However, here, we've achieved a 12-meter span at low cost by combining small-section studs commonly used in typical residential construction to form trusses. This method, the first of its kind in Japan, utilizes these small-section studs (measuring 30×120mm) which are widely used in residential construction.
- Research
- Research Objective: To find a cost-effective method for achieving large spans in wooden structures. Result: The combination of small-section studs into truss structures has enabled the realization of a 12-meter span at low cost. Impact: There is potential for innovative approaches in medium to large-scale wooden construction.
- Inspiration
- Before initiating this design, visiting an existing pre-cut factory left a profound impression. Witnessing the precise, aesthetically pleasing fabrication of columns and beams at remarkable speed sparked inspiration. To capture the dynamism and speed of fabrication observed in the factory, the design concept emerged: a facade featuring a protruding massive timber symbolizing the factory's essence.
- Project Duration
- This project was completed in September 2020 and is currently in operation. The planned site in Bando City is a place where forest resources are abundant despite being near Tokyo. It is conveniently located as a node of the expressway network in the Tokyo metropolitan area.
- Operation Flow
- This is a project of a new timber processing plant for precut lumber designed by Aida Sekkei Co.,Ltd., one of the leading house builders who specializes in traditional Japanese timber construction.