Imatra GIS Subestación eléctrica by Virkkunen and Co Architects

Imatra GIS Subestación eléctrica by Virkkunen and Co Architects is a highly esteemed winner of the very prestigious 2021 A' Design Award de Prata in Deseño de Arquitectura, Edificación e Estruturas Competition Category.


PrataArquitectura· 2021

Imatra GIS Subestación eléctrica

by Virkkunen and Co Architects

Client: Virkkunen & Co Architects

A' Design Award de Prata Winner in Arquitectura Category

Colors

The Design

About Imatra GIS Subestación eléctrica

Imatra GIS é unha subestación eléctrica situada na paisaxe dos rápidos de Imatrankoski, no leste de Finlandia. O proxecto inclúe un edificio de subestación e cinco torres eléctricas e terminais. O edificio ten unha estrutura de formigón e fachadas de dobre pel. A capa exterior está feita de ladrillos longos feitos a man colocados nun perfil en zigzag e sostidos por unha estrutura de aceiro. As estruturas de transmisión están feitas de perfís de aceiro soldado triangulares. O deseño descompón aspectos do contexto construído e recompón os elementos nunha nova forma abstracta, en equilibrio coa paisaxe circundante.

The Recognition

About the A' Design Award de Prata

Imatra GIS Subestación eléctrica gañou o A' Design Award de Prata, un recoñecemento enormemente prestixioso outorgado a deseños de gama alta, fermosos e impresionantes. Os gañadores Prata son obras tremendamente brillantes e sumamente creativas que ilustran a pericia, o talento e a agudeza sobresaíntes dos seus deseñadores. Espérase que Imatra GIS Subestación eléctrica sexa unha obra marabillosa, escaparate de oficio, notablemente profesional e profundamente innovadora. Este deseño gañador do A' Design Award de Prata é unha invención moi notable e admirada que beneficia e fai avanzar os límites da arte, a ciencia, o deseño e a tecnoloxía. Imatra GIS Subestación eléctrica é unha creación moi envexada que esperta desexos, achega sentimentos positivos e prende asombro e marabilla.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
Dimensions & Packaging
The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
Tags
infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
Production Technology
The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
Design Challenge
The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
Research
We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
Inspiration
The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
Project Duration
Project completed: 2020
Location: Imatra, Finland
Operation Flow
Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
Team Members
Tuomas Kivinen
Anna Blomqvist
Maria Karjalainen
Image Credits
Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate