Ferro Arquitectura · 2021
Sepanta Sala Multifuncional
by Amin Naeimi
- A' Design Award de Ferro 2021 in Arquitectura
- CLIENT: Excelsior grand resort hotel in Kish Island(Sepanta Gasht Kish Co.)
- Estimated Number of Design Views: 11,704
- Verification code CC45B06EA5 · Verify this award
Colors
About Sepanta Sala Multifuncional
Sepanta é unha sala multifuncional deseñada para música, teatro e ópera na illa de Kish. A forma está inspirada nos caparazóns das tartarugas que aniñan ao longo da costa próxima. Unha superficie ondulada e suave evoca as ondas do océano e está feita de formigón reforzado con fibra de vidro. O teito curvo suspendido está construído con estruturas espaciais e descansa sobre un muro cortina de vidro que abre o interior á vista do mar. O acristalamento triplo e un teito de tres capas reducen a perda de enerxía. A sala abarca preto de 6000 metros cadrados e ten capacidade para arredor de 1350 persoas.
About the A' Design Award de Ferro
Sepanta Sala Multifuncional gañou o A' Design Award de Ferro, un recoñecemento prestixioso outorgado a bos deseños que cumpren os requisitos profesionais e industriais esperados de creacións ben deseñadas. Os gañadores Ferro demostran a gran habilidade, a alta especialización, a comprensión experta e a capacidade creativa dos seus creadores. Espérase que Sepanta Sala Multifuncional sexa unha creación moi apreciada, admirada e querida que é práctica e innovadora. Este deseño gañador do A' Design Award de Ferro integra as mellores prácticas do sector e ten características técnicas competentes ligadas ao saber facer e ao talento. Sepanta Sala Multifuncional é respectado pola súa minuciosidade e está deseñado para proporcionar melloras na calidade de vida que axudan a facer do mundo un lugar mellor.
Press Kit
- Unique Properties
- This multifunctional hall designed for music, theater and opera, the three most importance feature we can mention are , eye-catching forms of tortoise shells near the beach with special night lighting, We create a special modern form with suspended curved ceiling, which is laying over the glass curtain wall that gave us the benefit of the perfect ocean view, the most stunning aspect of this design is the smooth wavy surface which is completely associate with ocean wave.
- Dimensions & Packaging
- The capacity of almost 1350 person and the survey is nearly 6000 square meters.
- Tags
- Sepanta opera hall,kish,kish opera hall
- Production Technology
- The most important challenge for the construction of this hall is the suspended celling which is done with space structures and the smooth wavy surface is made of GFRC . In consider of the importance of energy conservation we provide triple glazed curtain wall which is the best choice for this climate and three layers celling to reduce waste of energy.
- Design Challenge
- The most difficult challenge we faced in this project was limitation as a result of turtles habitat which is located neighboring to our site and the untouched and special environment which should be stay as undamaged as we can.
- Research
- When this project was referred to us, first of all, the environmental survey and research about the land on where this project is to be started began, and we came to interesting results in terms of environment and climate. The land was located near the coastal area. It was a spawning ground for rare turtles that were under environmental protection and also one of the most attractive and oldest inhabitants of the island, so we decided that the design would ultimately be inspired by these amazing creatures and be in harmony with the environment but a modern and architectural interpretation of turtles.
- Inspiration
- first of all turtles are the main species in Kish and they are preserve by the authority. This hall is an great symbol of these animals which is located near to their habitat however permissible limitation is intended, the design is inspired by the tortoise form and it has been tried to be a modern type of it.
- Project Duration
- The design of this project started on November 12, 2020 and was completed after three months, and its executive operation started on February 14, 2021, and the project plan for its completion is 18 months.