Skip to content
Komazawa Daigaku Estación de Ferrocarril by Uds Ltd.

Komazawa Daigaku Estación de Ferrocarril by Uds Ltd. is a highly esteemed winner of the very prestigious 2026 A' Design Award de Prata in Deseño de Arquitectura, Edificación e Estruturas Competition Category.


PrataArquitectura· 2026

Komazawa Daigaku Estación de Ferrocarril

by Uds Ltd.

Client: UDS Ltd.

A' Design Award de Prata Winner in Arquitectura Category

Colors

Email this page

The Design

About Komazawa Daigaku Estación de Ferrocarril

Komazawa Daigaku é unha estación de ferrocarril renovada situada baixo o Parque Komazawa en Setagaya, Tokio. O concepto Under the Park (Baixo o Parque) trata o vestíbulo subterráneo como raíces e os edificios de saída como árbores simbólicas. Os compoñentes da estación agrúpanse en tres escalas temporais: obras de terra permanentes, árbores que envellecen e follas que se renovan. Os azulexos existentes e os pavimentos de terrazo conserváronse para reducir os residuos, e empregouse madeira de orixe nacional. Un revestimento metálico do teito crea un efecto de luz moteada. Os bancos e mostradores convidan á xente a descansar e a encontrarse.

The Recognition

About the A' Design Award de Prata

Komazawa Daigaku Estación de Ferrocarril gañou o A' Design Award de Prata, un recoñecemento enormemente prestixioso outorgado a deseños de gama alta, fermosos e impresionantes. Os gañadores Prata son obras tremendamente brillantes e sumamente creativas que ilustran a pericia, o talento e a agudeza sobresaíntes dos seus deseñadores. Espérase que Komazawa Daigaku Estación de Ferrocarril sexa unha obra marabillosa, escaparate de oficio, notablemente profesional e profundamente innovadora. Este deseño gañador do A' Design Award de Prata é unha invención moi notable e admirada que beneficia e fai avanzar os límites da arte, a ciencia, o deseño e a tecnoloxía. Komazawa Daigaku Estación de Ferrocarril é unha creación moi envexada que esperta desexos, achega sentimentos positivos e prende asombro e marabilla.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
This project's uniqueness is its "Under the Park" concept, which creates a consistent narrative for the entire space: the underground concourse is envisioned as the town's "roots," and the buildings as "symbolic trees." Furthermore, a unique design methodology redefines the station via three timescales: "permanent earthworks," "aging Trees," and "renewing leaves." This presents a new vision for an adaptable station designed to be loved long-term.
Dimensions & Packaging
Total Floor Area:
Underground Station Concourse: Approx. 6,500 sqm (RC structure, 2 floors below ground)
East Exit Building: 564.34 sqm (RC structure, 4 stories above ground)
West Exit Building 1: 398.58 sqm (Steel structure, 2 stories above ground)
West Exit Building 2: 346.80 sqm (Timber and partial RC structure, 4 stories above ground, 2 floors below ground)
Tags
Renovation, Station, Sustainability, Timber, AdaptiveReuse, Narrative, PublicSpace, Biophilic, Placemaking, Tokyo
Production Technology
This project’s realization is driven by sustainability. We minimized waste by preserving existing tiles and terrazzo floors, while using domestic timber for its warmth and environmental benefits. The West Exit building, in a fire protection district, pioneers advanced timber tech like LVL fire-resistant coating and a two-way rigid-frame structure (rare in Japan). A special metallic ceiling coating creates a unique komorebi (dappled sunlight) effect.
Design Challenge
Our greatest challenge was maintaining the consistency of the "Under the Park" concept across a four-year project with diverse work areas and many stakeholders. Amidst fragmented on-site decisions, our "Earthworks, Trees, and Leaves" design guideline served as the core guiding principle to return to. Additionally, realizing a timber station building in a fire protection district was a major external challenge, requiring us to overcome strict legal regulations and technical constraints.
Research
This practical research aimed to translate the given "Under the Park" concept into a sustainable space, creating new value for aging infrastructure. Our methodology was to develop the "Earthworks, Trees, and Leaves" model, which classifies station components by three timescales. Based on this model, we selected materials and composed the space, prototyping advanced timber technology in one building. The expected social impact is increased user dwell time, fostering affection for the station.
Inspiration
The primary source of inspiration for this project is its very location: "under Komazawa Park." We were strongly motivated by the desire to transform the aging, inorganic underground space—a place people have used daily for over 45 years—into a more comfortable and cherished environment. Therefore, we placed the "park," a quintessential landscape shared by all local residents, at the core of our concept. We envisioned that just as the trees in the park extend their roots underground to support their lush forms above, the station could also become like a living organism—absorbing, nurturing, and radiating the town's vitality. This poetic vision of "Under the Park" became the driving force behind the entire design.
Project Duration
This project was implemented at Komazawa-daigaku Station in Setagaya, Tokyo, as the first phase of the "Green Under Ground" renewal project by Tokyu Railways Co., Ltd. The schematic design phase began in August 2020, and the overall construction period for the station runs from July 2020 to March 2025. Completion is on April 1, 2025.
Operation Flow
Visitors are guided by the "Symbolic Tree"-like station buildings into the "Under the Park" world. Descending warm, trunk-like staircases, a space unfolds resembling the roots of a park, seemingly bathed in dappled sunlight. This functions not merely as a path to the trains, but as a "garden" for people to spend time as they wish. Intentionally placed benches and counters invite users to linger, meet or rest, generating a new, personal interaction with the station itself.
Team Members
Designer: Keiichi Ito
Designer: Yayoi Sato
Designer: Seshiro Honda
Graphic Designer: Yutaro Sakurai
Image Credits
Image #1 : TOKYU CONSTRUCTION CO., LTD., 2025
Optional Image #1 : Photographer Shinsui Ohara, 2025
Optional Image #2 : Photographer Shinsui Ohara, 2025
Optional Image #3 : Photographer Shinsui Ohara, 2025
Optional Image #4 : Photographer Shinsui Ohara, 2025
Optional Image #5 : Photographer Shinsui Ohara, 2025

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate