The Courtyard Espazo Recreativo by Nischal Abhaykumar

The Courtyard Espazo Recreativo by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 A' Design Award de Bronce in Deseño de Arquitectura, Edificación e Estruturas Competition Category.


BronceArquitectura· 2019

The Courtyard Espazo Recreativo

by Nischal Abhaykumar

Client: M9 Design Studio

A' Design Award de Bronce Winner in Arquitectura Category

Colors

The Design

About The Courtyard Espazo Recreativo

O Patio é un edificio recreativo e de eventos deseñado para reunións comunitarias. A estrutura de dous andares ten planta rectangular, con teito plano, paredes de metal corrugado e unha estrutura de aceiro doce. Unha fachada de policarbonato corrugado pecha o espazo de eventos multiusos no primeiro andar e achega luz natural ao interior. Cortinas texturizadas bordean a fachada para controlar a luz durante os espectáculos. No interior, quedan visibles as vigas de aceiro pintadas de negro, os teitos de chapa exposta e os pavimentos de formigón e madeira. Os compoñentes producidos en masa permitiron manter baixos os custos e reducir o período de construción a 75 días.

The Recognition

About the A' Design Award de Bronce

The Courtyard Espazo Recreativo gañou o A' Design Award de Bronce, un recoñecemento altamente prestixioso outorgado a deseños sobresaíntes que se distinguen pola creatividade, o enxeño e a sagacidade. Os gañadores Bronce son artefactos amplamente hábiles e sorprendentemente creativos que autentican a vasta experiencia, imaxinación e enxeño dos seus deseñadores. Espérase que The Courtyard Espazo Recreativo sexa un obxecto moi apreciado, admirado e querido, notablemente profesional e innovador. Este deseño gañador do A' Design Award de Bronce incorpora as mellores prácticas da arte, a ciencia, o deseño e a tecnoloxía, e é excelente pola súa atención ao detalle. The Courtyard Espazo Recreativo satisfai espléndidamente as necesidades, toca os desexos, encanta os sentimentos e atrae a curiosidade.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
Dimensions & Packaging
Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft.
Tags
Adaptive re-use, modern, industrial, old and new, polycarbonate box
Production Technology
A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
Design Challenge
The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
Research
Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
Inspiration
The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
Project Duration
The building was completed in June 2018 and the duration of construction was 75 days.
Operation Flow
The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
Team Members
Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh
Image Credits
Shamanth Patil Photography

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate