Skip to content
Kwsa Tembok Kinetik by Leva Engineering

Kwsa Tembok Kinetik by Leva Engineering is a highly esteemed winner of the very prestigious 2025 A' Design Award Perak in Desain Instalasi Competition Category.


PerakInstalasi· 2025

Kwsa Tembok Kinetik

by Leva Engineering

Client: Leva Engineering

A' Design Award Perak Winner in Instalasi Category

29,817

Verified Award Winner

Verify Award Status for #172468

Colors

The Design

About Kwsa Tembok Kinetik

Kwsa punika instalasi tembok kinetik ingkang mapan wonten ing Aramco Innovation Center ing Riyadh. Karya punika nutupi wiyar 209 meter persegi lan kawangun saking enem tembok modular, saben-saben wiyaripun 6000 mm lan dhuwuripun 7000 mm. Gerakanipun diasilaken dening 20.000 motor stepper ingkang nglakokaken sistem lead screw lan tuas khusus kanthi presisi 0,1 mm. Komponen ingkang kadamel saking teknopolimer swalubrikasi boten mbetahaken pelumas lan nyediakaken akses saking ngajeng kangge perawatan. Urutan koreografi kadamel saking video grayscale, ing pundi nilai padhanging cahya nemtokaken tingkat gerakanipun.

The Recognition

About the A' Design Award Perak

Kwsa Tembok Kinetik menang A' Design Award Perak, pangenalan sing prestisius banget sing diparingake marang desain tingkat dhuwur, endah lan nggumunake. Pemenang Perak iku karya sing sumunar banget lan kreatif banget sing nggambarake kaprigelan, bakat lan kaweruh para desainer. Kwsa Tembok Kinetik dikarepake dadi karya sing nggumunake, conto teladan, profesional banget lan inovatif banget. Desain sing menang A' Design Award Perak iki iku panemuan sing luar biasa banget lan dikagumi sing paring manfaat lan nyurung maju wates seni, sains, desain lan teknologi. Kwsa Tembok Kinetik iku ciptaan sing akeh sing ngirenake sing nggugah kekarepan, nggawa perasaan positif lan nuwuhake gumun lan kagum.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate