Star of Tomorrow Disinn Intern tal-Uffiċċju by Millton Yu is a highly esteemed winner of the very prestigious 2021 Premju A' Design Award tal-Bronż in Disinn ta' Spazji Interjuri u Wirjiet Competition Category.
BronżInterjur· 2021
Star of Tomorrow Disinn Intern tal-Uffiċċju
by Millton Yu
Client: M. INTERIOR DESIGN Co., LTD
Premju A' Design Award tal-Bronż Winner in Interjur Category
Verified Award Winner
Verify Award Status for #123732The Design
About Star of Tomorrow Disinn Intern tal-Uffiċċju
Star of Tomorrow huwa intern tal-uffiċċju ddisinjat għal kwartieri ġenerali korporattivi f'Taipei, it-Tajwan. Il-proġett ta' 466 metru kwadru jinkludi bitħa tad-dħul, klassijiet taż-żfin, studios, sala multifunzjonali għall-esebizzjonijiet, kafetterija b'ikel ħafif u żona ta' mistrieħ għall-mistiedna. Ħitan u soqfa bojod u artijiet tas-siment b'texture oriġinali jħallu spazju għal wirjiet futuri. Il-kmamar tal-laqgħat u ż-żoni rikreattivi jistgħu jinbidlu għal użi oħra billi jitmexxa l-għamara, biex b'hekk tiġi evitata rikostruzzjoni fil-futur. Ħitan b'arkati tal-metall u dawl jimmarkaw id-dħul għaż-żona prinċipali tal-uffiċċju.
The Recognition
About the Premju A' Design Award tal-Bronż
Star of Tomorrow Disinn Intern tal-Uffiċċju huwa rebbieħ tal-Premju A' Design Award tal-Bronż, rikonoxximent prestiġjuż ħafna mogħti lil disinji eċċellenti ddistingwuti mill-kreattività, l-ingenwità u l-għaqal. Ir-rebbieħa tal-Bronż huma xogħlijiet bi ħila biżżejjed u kreattivi b'mod impressjonanti li jawtentikaw l-esperjenza vasta, l-immaġinazzjoni u l-ħila ta' riżorsi tad-disinjaturi tagħhom. Huwa mistenni li Star of Tomorrow Disinn Intern tal-Uffiċċju ikun oġġett imqabbar ħafna, mammirat u maħbub, notevolment professjonali u innovattiv. Dan id-disinn rebbieħ tal-Bronż jinkorporaw l-aħjar prattiki fl-arti, ix-xjenza, id-disinn u t-teknoloġija u huwa eċċellenti fl-attenzjoni għad-dettalji. Star of Tomorrow Disinn Intern tal-Uffiċċju jissodisfa l-ħtiġijiet b'mod eċċellenti, imiss ix-xewqat, jinċanta s-sentimenti u jattira l-kurżità.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The client rented a building with eight floors above ground and two floors underground in the center of the city as the new corporate headquarters, and selected the team to plan and design space for it. In addition to office space, the main requirements also include entrance halls, dance classrooms, studios, multi-functional exhibition halls and light food cafes, as well as a rest space for VIPs, and many other functions.
- Dimensions & Packaging
- The project is 466 square meter.
- Tags
- Commercial, Headquarter, Interior Design, Space, Office
- Production Technology
- The team leaves a lot of white walls and ceilings in the lobby and multi-functional exhibition hall, and chooses the original texture cement floor to reserve the space and walls that can be used for future display, and it can also reserve in terms of functional conditions. The demand is to respond to the minimalist requirements in the design concept. In addition, meeting rooms and recreational spaces can be converted to other functions by moving furniture. Even if there is a possibility of a second construction change in the future, it can ensure that there is no need to dismantle and rebuild.
- Design Challenge
- The building was originally a residential plan, and the original layout and power supply and drainage configurations must be re-adjusted to suit the above spatial functions. In the limited decoration budget, the space design still needs to conform to the client's company image and brand style: fashionable, popular, elegant and bright. The final effect not only meets the above needs, but also conforms to the client's company image in style and beauty, and is also well controlled in terms of budget, achieving a balance between reasonable prices and design effects.
- Research
- The early planning and design received strong support during the implementation. In order to modify the basis of the original residential configuration and ensure normal use in the later period, most of the cost was invested in the construction of basic conditions. The selected materials and construction methods minimize the need for reprocessing. Reduce manpower and resource consumption and save costs. Exposed pipelines and surface materials are accurate and step-by-step construction is required to be done at one time, and unnecessary on-site processing or polluting production processes are gradually reduced. Ensure that the completed space meets the requirements of environmental protection, cleanness and pollution-free, and immediate entry.
- Inspiration
- In response to customers in a popular industry and changing market demands, there are new ideas to be produced at any time, so they need a relatively flexible space that can be adjusted at any time, reducing unnecessary and unchangeable decorations and furniture and saving budgets. Various popular elements that may be produced in the future retain the space for performance and performance.
- Project Duration
- The project finished in June 2020 in Taipei, Taiwan.
- Operation Flow
- Simple lines and materials, low chroma colors, methodical details and quality, comfortable and comfortable use, and the overall space presents an elegant temperament. Step out of the elevator and before entering the main office area, the cold metal arc walls and lights on both sides, with minimal decoration materials and design techniques, instantly transform the space into a fashionable extension table, opening up fashion for people entering this space journey of.
- Team Members
- Designer: Millton Yu
- Image Credits
- Image #1-5: Photographer Alvic Han, Star of Tomorrow, 2020.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.