Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli by Elisabeth Ruthnick is a highly esteemed winner of the very prestigious 2022 Mahuizolli A' Design Award Tepoztli in Calchihualiztli, Calmanaliztli ihuan Tlatecpanaliztli Tlachihchihualiztli Competition Category.
TepoztliCalchihualiztli· 2022
Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli
Mahuizolli A' Design Award Tepoztli Winner in Calchihualiztli Category
Verified Award Winner
Verify Award Status for #138576The Design
About Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli
Jobcenter Berlin se tlapachiuhcan tlayecanaliztli in Berlin, Alemania, tlachiuhtli inic mopatlac Bornemann Huey Calli, se ihuilteca tlacecetiliztli in cabildo ipan xihuitl 1960. In calli, tlen ihcuiliuhtoc ipan amatlacuiloliztli tlapieliztli, oquipatlaqueh ihuan yancuic ipan tlanepantli, tlapetlaniliztli ihuan tletlapopoloa neltoquiliztli, ihuan in tlalpan tlanamacaliztli oquicualtlalihqueh ipan itequitiz yancuic tlaneltocanimeh. In tepalcaltetl painaltin ihuan tlatzaquallotl tlachihchihualli oyancuilihqueh ipan iyeliz achto tlamachiotl, ihuan cenca monequi tetlapieltin monemachtiaya. In tepamitl tlen mottaya ipan calnenepanolli oyectlaliloc ihuan ochipahuac. Se yancuic tlapaliliz tlanemiliztli quiyacana in tlalli campa nochi tlacatl huel calaqui ihuan calnenepanolli.
The Recognition
About the Mahuizolli A' Design Award Tepoztli
Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli ca in quicuic in Mahuizolli A' Design Award Tepoztli, tlamahuizoliztli tlen momaca in cualli dizayno in quitlalia in tlen monequi ipan tequitl ihuan tlachihualiztli in quimaca in cualli tlachihualli. In quicuicah Tepoztli quinextia in hueyi tlamatiliztli, toltecayotl ihuan ihuelitiliztli intlachihuanime. Ca quinequi in Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli ca tlazohtli, mahuiztic, yancuic ihuan motequiuhtia. Ni dizayno in quicuic Tepoztli quihuelitia in tlamatiliztli ihuan quipia chicahualiztli tlen tepoztli. Jobcenter Berlin Tlapachiuhcan Tlayecanaliztli quicualtia in nemiliztli ihuan quihuelitia in cemanahuac ica cualli.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era. - Dimensions & Packaging
- GFA: 8,908 square meter
GBV: 33,198 cubic meter - Tags
- High-rise, Post-war modern era, Refurbishment
- Production Technology
- When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
- Design Challenge
- A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
- Research
- The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
- Inspiration
- Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
- Project Duration
- Realization: 2013-2018
Location: Berlin, Germany - Operation Flow
- The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors. - Team Members
- Frank Anacker, Sylvia Wallau, Sabine Hadrossek
- Image Credits
- Andreas Meichsner, Berlin
Kevin Fuchs, Berlin
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.