Skip to content
Reconstruction Project Nyumba Yaikulu by Ibrahim Halil Tugbay
Reconstruction Project Nyumba Yaikulu by Ibrahim Halil Tugbay
Reconstruction Project Nyumba Yaikulu by Ibrahim Halil Tugbay
Reconstruction Project Nyumba Yaikulu by Ibrahim Halil Tugbay
Reconstruction Project Nyumba Yaikulu by Ibrahim Halil Tugbay

Bronze Zomangamanga · 2025

Reconstruction Project Nyumba Yaikulu

by Ibrahim Halil Tugbay

  • Mphoto ya Bronze ya A' Design Award 2025 in Zomangamanga
  • CLIENT: İbrahim Halil TUĞBAY
  • Estimated Number of Design Views: 10,543
  • Verification code 1A00BF83E6 · Verify this award
Email this page

Colors

About Reconstruction Project Nyumba Yaikulu

Ntchito Yomanganso ndi kusintha kwa nyumba yomwe kale inali ofesi ya kazembe kukhala nyumba yaikulu ku Istanbul. Kapangidwe kake kamapanga malo amakono okhalamo pamene kamasunga khalidwe loyambirira la nyumbayo. Zamkati zakonzedwanso, zinthu zamakono zawonjezedwa, ndipo kunja kwake kwakonzedwa bwino. Zipangizo zoteteza kutentha bwino zimathandizira kusunga mphamvu, ndipo mapanelo okonzedwa bwino pamawu amapititsa patsogolo mtendere wamkati. Kapangidwe ka dongosolo la zambiri za nyumba (BIM) ndi kapangidwe kothandizidwa ndi kompyuta zinatsogolera kukonzekera. Malo otseguka, kuwala kwachilengedwe, ndi kuyenda bwino kwamkati zimapanga mapangidwe onse.

About the Mphoto ya Bronze ya A' Design Award

Reconstruction Project Nyumba Yaikulu ndi mmodzi mwa opambana a Mphoto ya Bronze ya A' Design Award, kuzindikirika kolemekezeka kwambiri komwe kumaperekedwa kwa mapangidwe abwino kwambiri omwe amaonekera ndi luso lolenga, kuchenjera ndi nzeru zakuthwa. Opambana a Bronze ndi zinthu zaluso kwambiri ndi zolenga modabwitsa zomwe zimatsimikizira zochitika zazikulu, kulingalira ndi kuchenjera kwa opanga awo. Reconstruction Project Nyumba Yaikulu akuyembekezeka kukhala chinthu choyamikiridwa, chosirira ndi chokondedwa, chaukatswiri wapadera ndi chatsopano. Mapangidwe opambana Mphoto ya Bronze ya A' Design Award awa amaphatikiza machitidwe abwino kwambiri a luso, sayansi, kapangidwe ndi ukadaulo ndipo ndi abwino kwambiri chifukwa cha kusamala kwawo zazing'ono. Reconstruction Project Nyumba Yaikulu amakwaniritsa zosowa mokongola, kukhudza zilakolako, kukopa mitima ndi kudzutsa chidwi.

Press Kit

Unique Properties
The consulate-turned-villa conversion project is an innovative design that combines architectural aesthetics and functionality. The project aims to transform the building into modern living spaces while preserving its original character. Among the features of this design, sustainable material use and energy efficiency are at the forefront. Innovations such as integrating open spaces, maximum use of natural light and optimizing indoor flow distinguish this project from others.
Dimensions & Packaging
Net area is 1240 square meters.
Tags
Consulate transformation, villa design, historical buildings, interior renovation, modern comfort, architectural restoration, living space, luxury villas, design projects, building transformation.
Production Technology
Our consulate-to-villa transformation project is carried out using modern materials and production technologies. The project was strategically planned with BIM (Building Information Modeling) and highly insulated materials were preferred to increase energy efficiency. Comfort is increased with acoustically optimized panels in the interior. The detailing process was accelerated with CAD (Computer-Aided Design) software, and the prototype stages were supported with 3D printing techniques. These methods ensure that the project is evaluated at the highest level in terms of both aesthetics and functionality.
Design Challenge
The biggest challenge in this project was to provide modern comfort and functionality while preserving the authenticity of the historical building. From a historical and social perspective, it was necessary to take into account the cultural values ​​of the building. Technically, the structural limitations of the existing structure and the incompatibility of the old materials were major obstacles. Additionally, complying with local laws and regulations and integrating modern technologies and access to information were also challenging.
Research
Research Type: Design-focused transformation research.

Research Objectives: To increase comfort and functionality while preserving historical values ​​by transforming an old consulate building into a modern villa.

Methodology: Along with historical and structural analysis, modern design principles were applied to make modifications to the existing structure.

Data Collection and Tools: Data obtained from previous projects, architectural plans, interior analysis, and user feedback were used. Additionally, computer-aided design (CAD) software and 3D modeling tools were used.

Participants or Experiments: The project team consisted of architects, interior designers and engineers. Additionally, user surveys and focus group discussions were conducted.

Results: The transformation presented a project in which historical features were preserved and transformed into modern living spaces. As a result, it was observed that the old building regained its function as a modern villa, both aesthetically and functionally.

Insights and Impacts: The project demonstrated how historic buildings can be transformed to suit modern needs. It set an exemplary model for combining cultural heritage preservation and modern comfort in society.

Impact of Research on Business, Society and Design: In the business world, it introduced innovative approaches to the reuse of old buildings. He encouraged the preservation of historical buildings in the community. In terms of design, it created a successful example of transformation that brought history and modernity together.
Inspiration
The preservation of cultural heritage and the integration of modern life are prioritized. The project aims to combine the architectural features of the past with the functionality of the future. My motivation is a passion for creating sustainable structures; This is an approach to energy efficiency and reducing environmental impact. My technical background is based on a solid background in architecture and environmental design, using innovative materials and developing smart design solutions.
Project Duration
The design process of the project started in January 2024 in Istanbul and in February 2024 in Istanbul. finished. The implementation process continues.
Operation Flow
The consulate-to-villa conversion project involves transforming an old consulate building into a modern and comfortable villa. The interior of the old building is renovated, modern design elements are added and the exterior is tidied up. In this process, historical features are preserved, but the living space is adapted to modern needs. As a result, the building combines modern comfort, resulting in a perfect living space, both aesthetically and functionally.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate