About Olympea Wasi
Kay kawsay wasi Líbano urqukunapi muyuriqnin naturalezawan hukllachasqa kachkan. Diseñonqa iskay L-rikch'aqniyuq estructurakuna pampapi, chaykunaqa kuska llamkanku ukhu q'omer pationta paqarichinapaq, wasipi tukuy k'itikunamanta rikukunapaq. Kay yuyayqa yuyarikurqan mana pasilluyuq wasita ruwanapaq, sumaq rikuchiypaq chaymanta mana k'itikunata chinkachiypaqpas. Cedro sachata tarpurqan ukhu patiopi, payqa suyup emblema kasqanrayku waraphapi tarikuq, wasipi sunquman tikrakuspa.
About the A' Design Award Quri Premiu
Olympea Wasi A' Design Award Quri Premiu mishak kan, ancha jatun yupaychay, kayta ñawpak kallari, sumak shinallatak mancharina diseñukunaman kun. Quri mishak kashkakunaka mushuk yuyay achka, ñawpakta rikuk shinallatak achikyaska rurashkakunami, paykunata rurakkunapak yachayta, yuyayta shinallatak ushayta rikuchinku. Olympea Wasi ashtawan alabashka, mushuk ñankunata churak shinallatak hatun valorta kuk yuyay kanata munanku. Kay Quri Premiu japishka diseñuka hanak, yupaychashka rurashka kan, arti, siensia, diseñu shinallatak tekinolojía ñawpak ñankunata kichuk. Olympea Wasi munayta kallarichin, yuyayta kallarichin, ruraytapash kallarichin shinallatak kuyaychin.
Press Kit
- Unique Properties
- Embedded within the topography, the composition is formed of 2 L-shaped structures interacting on the ground floor, creating an internal green patio that can be visible from anywhere in the house. Because of this, there are no corridors in the house.
A Cedar tree, the emblem of Lebanon, have been placed in the internal patio, being the heart of the project. - Dimensions & Packaging
- The ground floor has an indoor built area of 600m2 and a terrace of 150m2.
The two basements underneath has a built area of 700m2 and a garden of 300m2. - Tags
- villa, luxury, housing, architecture, design
- Production Technology
- the house was covered in natural stone, low emission glass, mixed with black steel for the pergolas and fireplaces
- Design Challenge
- The hardest part was to execute the project with having minimum impact on the existing land
- Research
- The study started by merging two L-shaped structures to create an internal green patio, while having the basement floors embedded into the mountain in order to merge the building with its surroundings.
- Inspiration
- While i first visited the site, i was amazed by the beauty of the mountain, and i wanted the have the least intervention possible. This is when we decided to embed the structure into the mountain and keep the surroundings as is.
- Project Duration
- The project started in April 2016 and will finish in October 2018
- Operation Flow
- The building offers comfort through its generous interior space distribution, the luxurious views, and the high end quality of the materials used for the construction.The heated flooring and the low emission glass provide an efficient heating and cooling system that allows heat exchange between the ground and the rest of the space
- Image Credits
- Joy alexandre Harb / Architect / Co-founder of JYH International ARchitects