Skip to content
Heito 1909 नगर पार्क by ECG International Landscape Consultants
Heito 1909 नगर पार्क by ECG International Landscape Consultants
Heito 1909 नगर पार्क by ECG International Landscape Consultants
Heito 1909 नगर पार्क by ECG International Landscape Consultants
Heito 1909 नगर पार्क by ECG International Landscape Consultants

ᱨᱩᱯᱟ ᱱᱚᱜᱚᱨ ᱭᱚᱡᱚᱱᱟ · 2021

Heito 1909 नगर पार्क

by ECG International Landscape Consultants

  • A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ 2021 in ᱱᱚᱜᱚᱨ ᱭᱚᱡᱚᱱᱟ
  • CLIENT: Pingtung County Government, Pan Men-an
  • Estimated Number of Design Views: 49,038
  • Verification code F734C33BAA · Verify this award
Email this page

Colors

About Heito 1909 नगर पार्क

नोवा जुगाक् रे, बासा आर दिशोम्‌को लगातार आफाय केदाम आर दोहो केदाम काना, जोतो प्रोजेक्ट एक्ठाम् "Tabula Rasa" काना। हेइतो १९०९ आक् बोदोलरे एक्ठाम् दुर्लभ adaptive reuse प्रोजेक्ट काना, iconic बासाको सायते दुलाड़ रे बाङ्‌ काते, पार्क रेयाक् जोतो सेन्दरा जिनिस्‌को खन्दराक् लेका भितोर ते बाहार डिजाइन आकान।अक् खास डिजाइन रे खन्दरा आर बागी आकान आकारको सहर आक् सुविधा रे रासका जोड़ाव् केदा राग्रिक्‌को आक् अनुभवेत् लागित्‌ते। मुखय रे, पार्क महानगर सहर भितोर रे मानुक्‌को बुगिन् प्राकृतिक माहोलरे रोलो लागित् मित्‌ठाम् जागा एमा।

About the A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ

Heito 1909 नगर पार्क ᱫᱚ A' Design Award ᱨᱩᱯᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱥᱩᱱᱫᱚᱨ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Heito 1909 नगर पार्क ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾

Press Kit

Unique Properties
Heito 1909 is an urban park base on an abandon factory, the ruins of factories can trace back few important era, colonists era, world II, post war industrial era. The park is a first industrial landscape, adaptive reuse project in Taiwan. The project transforms an abandoned industrial ruin into an urban recreation space, also reform industrial polluted river, into natural habitat.
Tags
Taiwan, Pingtung, Landscape, Historical, Urban Design , cultural, waterfront
Production Technology
In the excavation we use "point cloud laser scanning" for precise mapping of historical remains, point cloud produce precise data for historical documentation and precise 3D drawing. For the historical remains we build pavilions in parametric design, and use (Rhino ,Grasshopper, sketchup ,Vectorwork ) for construction drawing, it helps with create gradual sequence. And Ecotect Environment analysis for urban planning.
Design Challenge
The ideal of historic preserved of an industrial park, is not popular for the public and public sector. Since it's old and ugly, lack of commercial value and highly maintained. So it took a while to come out with a scheme to be acceptable. Because what's left is all underground, it's difficult to anticipate every detail before excavation, so its constant revise the design solution, and experiment different approach of construction methods.
Research
During the excavation we discover the project had a rich history, but it was kept secret for a century, so a lot of research needed. The variety of historical research from US Nay WW2 record, and Japan colonist archives, industrial sugar factory documents. Just to find out the function of the historical remains, the stories had happened here. The story of this place gives us design a starting point, a way to juxtapose with the city that has become, and continue the story for the future.
Inspiration
During the excavation of the historical remains, stories of the place been reviled, we realize there is gaps in our history that’s being erased. Because historical building can’t be capitalized, so majority always been demolished. What was destroyed not just a building, but also multiple period of history, and that we were merely one tiny portion of this era that made this decision.
Project Duration
The project is based in Pingtung, Taiwan. And had two phases of design and construction, first started in June 2018 finished in 2020 January, excavation and landscape infrastructure. The second are the historical site reuse, from 2020 July finished in 2021 January.
Operation Flow
The project had an expected date to be finished, due to the uncertainty of what's underneath. It's difficult to finish in date with normal process. So it's Design and historical research while excavation, it's an overlap process constant modify the outcome.
Image Credits
Image #1: Yi-Hsien Lee and Associates
Image #2: Yi-Hsien Lee and Associates
Image #3: Yi-Hsien Lee and Associates
Image #4: Yi-Hsien Lee and Associates
Image #5: Yi-Hsien Lee and Associates

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate