Lilong Arcade Primary Function: ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ by Jiahua Xu is a highly esteemed winner of the very prestigious 2025 A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ in ᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ, ᱤᱢᱟᱨᱚᱛ ᱟᱨ ᱜᱟᱲᱚᱱ ᱰᱤᱡᱟᱭᱤᱱ Competition Category.
ᱠᱟᱥᱟᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ· 2025
Lilong Arcade Primary Function: ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ
by Jiahua Xu
Client: Archtic
A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ Winner in ᱟᱨᱠᱤᱴᱮᱠᱪᱟᱨ Category
Verified Award Winner
Verify Award Status for #164415The Design
About Lilong Arcade Primary Function: ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ
Book Text: Lilong Arcade ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ ᱫᱚ ᱯᱩᱨᱟᱹᱱ Shanghai lilong ᱦᱚᱨ ᱟᱨ arcade ᱡᱟᱭᱜᱟ ᱫᱚ ᱱᱟᱶᱟ ᱡᱟᱱᱟᱢ ᱡᱟᱭᱜᱟ ᱞᱮᱠᱟᱛᱮ ᱟᱨᱦᱚᱸ ᱩᱭᱦᱟᱹᱨ ᱠᱟᱱᱟ ᱾ ᱱᱚᱶᱟ ᱫᱤᱡᱟᱹᱭᱱ ᱫᱚ ᱨᱟᱲᱩᱭᱟᱹ ᱨᱚᱲ ᱵᱟᱶ, ᱫᱤᱱᱟᱹᱢ ᱠᱟᱹᱢᱤ, ᱩᱫᱩᱜ ᱟᱨ ᱥᱟᱢᱟᱡᱤᱠ ᱟᱹᱛᱩᱢ ᱠᱟᱛᱮ ᱠᱷᱩᱞᱟᱹ, ᱞᱮᱸᱜᱮᱛ-ᱞᱮᱦᱮᱛ ᱟᱨ ᱨᱟᱦᱟ ᱦᱚᱸᱦᱚᱭ ᱡᱟᱭᱜᱟ ᱠᱚ ᱛᱮᱭᱟᱨ ᱮᱫᱟ ᱾ ᱱᱚᱶᱟ ᱫᱚ ᱡᱟᱭᱜᱟ ᱨᱮᱱ ᱱᱟᱜᱟᱨ ᱟᱨ ᱦᱚᱲ ᱢᱟᱲᱟᱝ ᱠᱟᱛᱷᱟ ᱠᱮ ᱢᱟᱱ ᱮᱢᱟ, ᱟᱨ ᱩᱱᱠᱩ ᱥᱟᱶ ᱠᱟᱹᱲᱤ ᱵᱮᱵᱷᱟᱨ, ᱟᱨᱥᱤ ᱡᱚᱛ ᱟᱨ ᱨᱟᱲᱩᱭᱟᱹ ᱡᱤᱭᱚᱱ ᱞᱟᱹᱜᱤᱫ ᱢᱤᱫ ᱥᱟᱯᱲᱟᱣ, ᱱᱟᱶᱟ ᱡᱟᱭᱜᱟ ᱮᱢ ᱮᱫᱟ ᱾
The Recognition
About the A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ
Lilong Arcade Primary Function: ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ ᱫᱚ A' Design Award ᱠᱟᱥᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱱᱟᱣᱟ ᱵᱷᱟᱵᱱᱟ ᱛᱮ ᱵᱷᱟᱞᱟᱭ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Lilong Arcade Primary Function: ᱨᱟᱲᱩᱭᱟᱹ ᱟᱨᱥᱟᱞ ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- "Lilong Arcade" embraces the concept of integrating public spaces with historical features while meeting modern needs.
Flexible layouts maximize space usage, blending fixed and mobile areas to accommodate diverse community needs.
The facade design marries historical elements with modern materials, maintaining harmony with the surrounding architecture while creating a welcoming, vibrant environment that supports public engagement. - Dimensions & Packaging
- Plot area:937m²
Gross Floor Area: 1677m²
Overall outdoor activity: 478.6m²
Citizen activity center: 154.6m²
F&B Retail: 202.5m²
Elderly activity center: 110.3m²
Healthcare: 288.5m²
Children's activity and Daycare: 374.3m²
Sports: 288.5m²
Flexible: 258.4m² - Tags
- community, social, civic, activity, wellness, urban, historic district, flexibility
- Production Technology
- Since the reconstruction cannot break through the existing building 3D boundary, the original building height is reused in accordance with the principle of economy and practicality.
The small column span shallow beam are used to achieve span of 4.5-6 meters.
An atrium is set inside the building to enhance the lighting while eliminating the sense of space cramped.
The visual corridor perpendicular to Main Road naturally extends to the depths of the base, leading the direction of the axis network system. - Design Challenge
- Since the reconstruction cannot break through the three-dimensional boundary, the building height cannot be greatly increased. As for the problem of insufficient building height (about 3.5 meters), the small column span shallow beam and partial height treatment are used to achieve: the conventional column span is 4.5-6 meters, and the local span is increased to enhance the permeability of the space.
- Research
- The project is located in Changning District, Shanghai, with a profound cultural heritage of foreign culture and local traditions.
The facade of the project building adopts a modern eclectic arcade form, which pays tribute to the traditional style. The arcade not only gives the building a timeless beauty, but also increases the transparency by providing a gray space for citizens to interact.
The exterior wall of the building adopts light-colored bricks to be unified with the surrounding style, the floor-to-ceiling glass windows fill the interior space with natural light, enhancing the openness and transparency of the building. - Inspiration
- The design concept of "Lilong Arcade" aims to adopt the "arcade", an architectural motif with publicness and sharing, to integrate historical features while showing the contemporaryity, making the building a natural extension of the walkable street system.
The project revolves around the principles of serving the people, adapting to local conditions, and flexible adaptation, creating a rich and high-quality service and activity space for citizens in the limited existing space. - Project Duration
- The project started in April 2024 in Shanghai and finished in August 2024
- Operation Flow
- To fully realize the functionality of various spaces in the limited space, a combination of fixed space + flexible space is adopt. That is, in addition to the spaces that rely on equipment such as the service center, community canteen, ect, most of the activities and learning places are optimized into flex spaces through operation. This not only helps the space allocation within the project, but also helps promote the fair and efficient allocation of public resources.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.