Skip to content
Kwsa Darbi Dhaqdhaqaaq leh by Leva Engineering
Kwsa Darbi Dhaqdhaqaaq leh by Leva Engineering
Kwsa Darbi Dhaqdhaqaaq leh by Leva Engineering
Kwsa Darbi Dhaqdhaqaaq leh by Leva Engineering
Kwsa Darbi Dhaqdhaqaaq leh by Leva Engineering

Lacag Rakibaad · 2025

Kwsa Darbi Dhaqdhaqaaq leh

by Leva Engineering

  • Abaalmarinta Lacagta ah ee A' Design Award 2025 in Rakibaad
  • CLIENT: Leva Engineering
  • Estimated Number of Design Views: 29,817
  • Verification code 0DC74ADF9D · Verify this award
Email this page

Colors

About Kwsa Darbi Dhaqdhaqaaq leh

Kwsa waa rakibaad darbi dhaqdhaqaaq leh oo ku taal Xarunta Hal-abuurka ee Aramco magaalada Riyadh. Shaqadan waxay daboolaysaa 209 mitir oo laba jibbaaran, waxaana ka samaysan lix darbi oo qaybo-qaybo ah, mid kastaa ballaciisu yahay 6000 mm, dhererkiisuna yahay 7000 mm. Dhaqdhaqaaqa waxaa soo saara 20,000 matoorro tallaabo-tallaabo (stepper motors) oo wada nidaam gaar ah oo ka kooban fuulmo cusbaan iyo kabaal, oo leh saxnaan dhan 0.1 mm. Qaybaha laga sameeyay teknopolimero is-saliidaysa uma baahna saliidayn, waxayna u oggolaanayaan in xagga hore laga galo si dayactir loo sameeyo. Isku-xigxiga dhaqdhaqaaqa la habeeyay waxaa laga abuuraa muuqaal fiidiyow ah oo midab-cawlan (grayscale), halkaas oo qiyamka iftiinku ay qeexaan heerka dhaqdhaqaaqa.

About the Abaalmarinta Lacagta ah ee A' Design Award

Kwsa Darbi Dhaqdhaqaaq leh waa guuleystaha Abaalmarinta Lacagta ah ee A' Design Award, aqoonsi sharaf aad u sarreeya oo la siiyo naqshado heerka ugu sarreeya oo quruxsan oo soo jiidasho leh. Guuleystayaasha Lacagta waa shaqooyin aad u dhalaalaya iyo hal-abuur sare leh oo muujiya khibrad, hibo iyo hufnaan naqshadeeyayaashooda. Kwsa Darbi Dhaqdhaqaaq leh waa shaqo la filayo inay noqoto shaqo quruxsan oo tusaale ah, xirfad cad leh oo hal-abuur qoto dheer leh. Naqshadahan ku guuleystay Abaalmarinta Lacagta ah ee A' Design Award waa hal-abuur aad loo dareemo oo la ammaano, waxtar leh oo hormariya xuduudaha farshaxanka, sayniska, naqshadaynta iyo tignoolajiyada. Kwsa Darbi Dhaqdhaqaaq leh waa hal-abuur dad badan ay doonayaan, kicisa rabitaanno, keena dareenno wanaagsan oo abuura yaab.

Press Kit

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate