ናብ ትሕዝቶ ሕለፍ
Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ ብ Suiadr

ዲዛይን Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ ብ Suiadr ኣብ ናይ ውድድር ምድብ ንድፊ ኣርክቴክቸር፣ ህንጻን ቅርጽን ኣዝዩ ዝኸበረ ተሸላማይ ናይ 2023 ናይ ነሓስ ሽልማት A' Design Award እዩ።


ነሓስኣርክቴክቸር· 2023

Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ

ብ Suiadr

ዓሚል: Suiadr

ኣብ ምድብ ኣርክቴክቸር ተሸላማይ ናይ ነሓስ ሽልማት A' Design Award

12,616

ዝተረጋገጸ ተሸላማይ

ንቁጽሪ #146958 ሽልማት ኣረጋግጽ

ሕብርታት

እቲ ዲዛይን

ብዛዕባ Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ

ሶንግፒንግሻን ኣብ ሸንዠን፡ ቻይና ዝርከብ ናይ ሓዊ ምጥፋእ ጣብያ እዩ። እዚ ናይ ቀዳማይ ደረጃ ጣብያ 3,660.1 ትርብዒት ሜትር ስፍሓት ቦታን 5,791.64 ትርብዒት ሜትር ጠቕላላ ስፍሓት ደርብን ኣለዎ፣ ከምኡ'ውን ሸውዓተ መካይን ሓዊ ምጥፋእ ይሕዝ። ውሽጣዊ ቀጽሪ ኣቀማምጣ ካብ'ቲ ኣብ ሰሜናዊ ወገን ዝርከብ ቀንዲ መንገዲ ዝመጽእ ረብሻ ድምጺ ይንኪ። ጋራጅ ሓዊ ምጥፋእ፡ ኣዳራሽ መእተዊ፡ ካፈተርያን ክፍሊ መራኸቢን ኣብ ቀዳማይ ደርቢ ተቐሚጦም ኣለዉ። ክፍልታት ድልውነት ግቡእ፡ ክፍልታት ኦፕረሽንን ተወሳኺ ክፍልታትን ድማ ኣብ ላዕለዎት ደርብታት ይርከቡ። መንገድታት በጻሕቲ ብመንደቕ ኮሪደር (mezzanine corridor) ስለ ዝሓልፉ፡ መዓልታዊ ስልጠናን መስመራት ግቡእን ኣይረብሹን።

እቲ ኣፍልጦ

ብዛዕባ ናይ ነሓስ ሽልማት A' Design Award

Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ ናይ ነሓስ ሽልማት A' Design Award ዝዓወተ እዩ፣ ብፈጠራ፣ ርእሰ ሓይልን ስቕታን ዝፍለዩ ብልጫ ዘለዎም ዲዛይናት ዝወሃብ ኣዚዩ ክቡር ኣፍልጦ። ዘዓወቱ ነሓስ ሰፊሕ ተሞክሮ፣ ምሕሳብን ርእሰ ምምዕባልን ዲዛይነራቶም ዘረጋግጹ ኣዚዮም ክኢላታትን ብዘደንቕ መገዲ ፈጠራውያንን ኣርቴፋክትታት እዮም። Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ ብዙሕ ዝተመነየ፣ ዝደነቐን ዝፈተዎን ብኣገዳሲ መገዲ ሞያውን ሓድሽን ኣቕሓ ክኾን ይጽበ። እዚ ዝዓወተ ዲዛይን ናይ ነሓስ ሽልማት A' Design Award ኣብ ጥበብ፣ ሳይንስ፣ ዲዛይንን ቴክኖሎጂን ዝበለጹ ልምድታት ዘጣምር፣ ንዝርዝር ብዝህቦ ኣቓልቦ ድማ ዝበለጸ እዩ። Songpingshan ናይ ሓዊ ምጥፋእ ጣብያ ድልየታት ብጽባቐ የማልእ፣ ንድሌታት ይትንክፍ፣ ንስምዒታት የማርኽን ሕቶ ድማ የሰሕብን።

ድሕሪ እቲ ዲዛይን

ናይ ፕረስ ኪት

ክረዲትታት፣ ኣባላት ጋንታን ቴክኒካዊ ዝርዝራትን ብዲዛይነር ዝቐረቡ።

ፍሉያት ባህርያት
The main entrance and exit is set at the southeast corner of the site, through which firefighters and visitors enter the fire station. The fire garage faces the square. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F. Basement mainly accommodates equipment rooms. Multiple rest platforms are arranged to enrich the lives of firefighters.
ዓቐንን ማዕሸግን
The project is a Grade-1 fire station with a plot area of 3,660.1 square meters and a gross floor area of 5,791.64 square meters, which can accommodate 7 fire trucks. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F.
መለለዪታት
Inner courtyard-style layout, Grade-1 fire station, Special set-back line, Overlapping circulation routes, Shading structure, Green design, Sponge city technologies
ናይ ምፍራይ ቴክኖሎጂ
The forms of each building feature a simple style and the building bodies have reasonable coefficient. The window-to-wall ratio and the area of curtain wall and external window meet relevant regulations and requirements. Each building is designed based on facades and adopts shading structure.
Green architecture and sponge city technologies are applied to roof fruit garden. Concave green area is set for rainwater absorption, storage and seepage, controlling the rainwater runoff within the site.
ናይ ዲዛይን ብድሆ
Limited land area: The building set-back lines cannot be fully in accordance with the requirements of Shenzhen local regulations. After several times of negotiations with the planning bureau about set-back lines, the design team reached a reasonable bargain: the plot is set back at least 1.0m on the east side, 2.3m on the south side, 38.1m on the west side, and at least 8.15m on the north side. In this way, the fire station and the sports field are reasonably arranged within the limited land.
ምርምር
Due to the Songpingshan Gas Vaporizing Station on the northwest corner, the building should be set back for 50m according to relevant regulations, which has a great impact on the spatial layout. On the basis of satisfying the requirements of set-back line, the design creates a curved screen wall to unfold a "dialogue" with the gas vaporizing station.
In response to the serious noise interference from Beihuan Avenue on the north, the project adopts an inner courtyard-style layout.
ምንጪ ሓሳብ
The project is designed according to the research results of "2014 Shenzhen Fire Station Standardization Design Workshop". The experience of this project will be utilized to establish construction standards on fire stations in Shenzhen, so as to satisfy the requirements of building more fire stations and provide a reference for domestic fire station constructions.
ናይ ፕሮጀክት ግዜ
The project started in September 2016 and finished in December 2019 at the intersection of Baoshen Road and Keyuan Road, Nanshan District in Shenzhen, China.
ናይ ስርሒት ፍሰት
Fire trucks leave the station via an exit nearby the street, greatly improving response efficiency.
Overlapping circulation routes: Public participation is encouraged. Visiting areas open for citizens are mainly organized on 1F and mezzanine. Visitors' circulation routes pass through the mezzanine corridor, without affecting the internal daily training and duty circulation routes of firefighters.
ኣባላት ጋንታ
Zhong Zhong
Zhong Botao
Ma Ying
Wei Qijing
Zhang Zilu
Wang Min
Yong Yong
Xiong Feng
Wu Zirong
He Xiaoming
Liu Mu
Tang Jin
ናይ ስእሊ ክረዲት
Inter_mountain

ስፖንሰር ዝተገብረ

ልዕሊ Designers.org ዳህሰስ

ካብ ናይ ማስታወቂያ መሻርኽትና ፍርያት፣ ኣገልግሎታትን ዕድላትን ፍለጥ።

ጽቡቕ ዲዛይን ዓቢ ኣፍልጦ ይግብኦ

A' Design Award ንጽቡቕ ዲዛይን ዝወሃብ ኣህጉራዊ ብዳያኒት ዝግምገም ሽልማት እዩ። ኣብ A' Design Award ብምስታፍ ብብቕዓት ዝተመስረተ ኣፍልጦ ንምርካብ፣ ዝና፣ ክብርን ሓበሬታን ንስራሕካ ንምርካብ ዕድል ሓዝ። ስራሕካ ንA' Design Award ጠቐስ እሞ ንቕሉዕ ናይ A' Design Prize ተወዳደር።

ጠቐስ