B73 Apartments Turar-Joy Qurilishi by Starh - Svetoslav Stanislavov is a highly esteemed winner of the very prestigious 2022 A' Design Award Bronza Mukofoti in Arxitektura, Bino va Inshoot Dizayni Competition Category.
BronzaArxitektura· 2022
B73 Apartments Turar-Joy Qurilishi
by Starh - Svetoslav Stanislavov
Client: Starh
A' Design Award Bronza Mukofoti Winner in Arxitektura Category
Verified Award Winner
Verify Award Status for #126292The Design
About B73 Apartments Turar-Joy Qurilishi
B73 o'zining innovatsion ko'rinishi, yuqori sifatli materiallardan foydalanish va bajarish sifati bilan kontekstga kiritilgan. Har bir qavat bitta kvartiradan iborat. B73 mamlakatdagi juda kam sonli binolardan biri bo'lib, murakkab 3D shakllar uchun qattiq sirt materiallari va termoformlashdan foydalanadi. Fasadning morfologiyasi strategik tarzda joylashtirilgan kesmalar bilan cho'zilgan sirtdan boshlanadi. Qaldirg'och qush shaklini yaratishda uzilish sodir bo'ladi. Birinchi qavatdagi qabulxonada engil badiiy instalyatsiya o'rnatilgan.
The Recognition
About the A' Design Award Bronza Mukofoti
B73 Apartments Turar-Joy Qurilishi A' Design Award Bronza Mukofotining g‘olibi bo‘lib, bu ijodkorlik, zukkolik va topqirlik bilan ajralib turuvchi a’lo dizaynlarga beriladigan o‘ta nufuzli e’tirofdir. Bronza g‘oliblari o‘z dizaynerlarining keng tajribasi, tasavvuri va topqirligini tasdiqlovchi juda mohir va hayratlanarli darajada ijodiy buyumlardir. B73 Apartments Turar-Joy Qurilishi yuqori qadrlanadigan, hayrat bilan qaraladigan va suyukli, diqqatga sazovor darajada kasbiy va innovatsion buyum bo‘lishi kutiladi. A' Design Award Bronza Mukofotini qo‘lga kiritgan ushbu dizayn san’at, fan, dizayn va texnologiyadagi eng yaxshi amaliyotlarni o‘zida mujassam etadi va tafsilotlarga e’tibori bilan a’lodir. B73 Apartments Turar-Joy Qurilishi ehtiyojlarni go‘zal qondiradi, istaklarga tegadi, tuyg‘ularni maftun etadi va qiziqishni jalb qiladi.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- B73 stands out in the urban context with its innovative and impactful look, having high-end material usage and exceptional quality in execution. Each residential floor comprises of just a single apartment.
B73 is one of the very few buildings in Bulgaria using solid surface material and thermoforming for complex 3D shapes. The concept of the facade starts from a simple surface that is stretched with strategically placed cuts. A discontinuation occurs creating the shape of a swallow bird.
The building's lobby hosts a uniquely designed light art installation specially for this space, being one of a kind in Eastern Europe. - Dimensions & Packaging
- 26-meters high, the building has 6 floors over ground and 2 underground ones. Total built-up area is 2,100 sqm.
- Tags
- Thermoforming, Solid Surface, Innovation, Technology, Residential, 3D, Premium, Facade, Light Installation
- Production Technology
- The complete building envelope and facade design are achieved through using acrylic stone material and thermoforming. It was needed to work with three different softwares in order to achieve the 3D bending of most of the elements, so they could be molded afterwards.
The building lobby hosts a uniquely designed light art installation specially for the space, being one of a kind in Eastern Europe. - Design Challenge
- The biggest challenge was to meet all investor's expectations for high quality execution. The whole process required precision on every step together with well managed synchronization between contractors.
- Research
- Having a busy boulevard, difference of heights and public and private buildings in the area, plus, non-homogeneous architectural language, makes inserting a new addition difficult. Instead, the approach was to elevate the quality of design and materials of the existing context, by inserting a well-executed gem.
- Inspiration
- The strongest motivation for this project came with the investor themselves and their will to create an outstanding building that has no compromises on every level. This provided us with almost limitless creative freedom. Afterwards, we succeeded to fully realize our design by using our previous experience with the innovative solid surface material. Organic forms and an overall white look come natural for us in our design.
- Project Duration
- The design phase of the project started in 2018 and the building was completed in April 2021.
- Operation Flow
- The interaction with the building fitting in the context is immediate. The diverse surrounding of materials, colors, heights, building state and shapes makes B73 pop out. Laying out a distinctive architectural line in the context benefits the neighborhood while changing the urban mood and perception.
- Patents
- Copyrights belong to STARH, 2021
- Team Members
- Svetoslav Stanislavov - Leading architect
Dimitar Katsarov
Iva Kostova
Radostina Petkova
Petar Nikolov
Hristo Dushev
Borislav Stanchev
Zhenia Atanasova
Georgi Pasev
Ivan Kovachev
Vladimir Kavaev
Debora Dimitrova
Sanya Kovacheva
Desislava Georgieva - Image Credits
- Photographer Dian Stanchev
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.