The Courtyard Dam olish maskani by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 A' Design Award Bronza Mukofoti in Arxitektura, Bino va Inshoot Dizayni Competition Category.
BronzaArxitektura· 2019
The Courtyard Dam olish maskani
Client: M9 Design Studio
A' Design Award Bronza Mukofoti Winner in Arxitektura Category
Verified Award Winner
Verify Award Status for #76233The Design
About The Courtyard Dam olish maskani
Hovli — jamoat yig'ilishlari uchun mo'ljallangan dam olish va tadbirlar binosi. Ikki qavatli inshoot rejada to'g'ri to'rtburchak shaklda bo'lib, tekis tomga, gofrirlangan metall devorlarga va yumshoq po'lat karkasga ega. Gofrirlangan polikarbonat fasad birinchi qavatdagi ko'p maqsadli tadbirlar maydonini o'rab turadi va ichkariga tabiiy yorug'lik olib kiradi. Fasad bo'ylab teksturali pardalar joylashtirilgan bo'lib, ular tomoshalar davomida yorug'likni nazorat qilish uchun xizmat qiladi. Bino ichida qora rangga bo'yalgan po'lat balkalar, ochiq holdagi pol plitalari shiftlari hamda beton va yog'ochdan yasalgan pollar ko'rinib turadi. Ommaviy ishlab chiqarilgan qismlar tannarxni past darajada ushlab turishga va qurilish muddatini 75 kunga qisqartirishga yordam berdi.
The Recognition
About the A' Design Award Bronza Mukofoti
The Courtyard Dam olish maskani A' Design Award Bronza Mukofotining g‘olibi bo‘lib, bu ijodkorlik, zukkolik va topqirlik bilan ajralib turuvchi a’lo dizaynlarga beriladigan o‘ta nufuzli e’tirofdir. Bronza g‘oliblari o‘z dizaynerlarining keng tajribasi, tasavvuri va topqirligini tasdiqlovchi juda mohir va hayratlanarli darajada ijodiy buyumlardir. The Courtyard Dam olish maskani yuqori qadrlanadigan, hayrat bilan qaraladigan va suyukli, diqqatga sazovor darajada kasbiy va innovatsion buyum bo‘lishi kutiladi. A' Design Award Bronza Mukofotini qo‘lga kiritgan ushbu dizayn san’at, fan, dizayn va texnologiyadagi eng yaxshi amaliyotlarni o‘zida mujassam etadi va tafsilotlarga e’tibori bilan a’lodir. The Courtyard Dam olish maskani ehtiyojlarni go‘zal qondiradi, istaklarga tegadi, tuyg‘ularni maftun etadi va qiziqishni jalb qiladi.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensions & Packaging
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Tags
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Production Technology
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Design Challenge
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Research
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiration
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Project Duration
- The building was completed in June 2018 and the duration of construction was 75 days.
- Operation Flow
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Team Members
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Image Credits
- Shamanth Patil Photography
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.