Malunga ne-Cunda Despot House Ihotele
ICunda Despot House sisakhiwo esinembali esibuyiselwe esimeni saso e-Ayvalik, eTurkey, esaphinda sasetyenziswa njengehotele. Isakhiwo esiphambili kunye netanki laso lokugcina amanzi zalungiswa ngokuhlonipha izixhobo zokwakha zantlandlolo kunye neendlela zokwakha zamandulo. Izongezelelo ezenziwa kamva zasuswa, kwaza kwacocwa ipeyinti endala kunye nodaka lodonga. Imigangatho yomthi, iingcango, iifestile kunye nezinyuko zakhiwa ngokutsha ngokuhambelana nezo zantlandlolo, kwaye isiseko kunye nenkqubo yesakhiwo zomelezwa. Isakhiwo esiphambili sinamagumbi angamashumi amabini, ngelixa indawo yokutyela, i-spa kunye namachibi okuqubha exhasa umsebenzi wehotele.
Ukuqatshelwa
Malunga ne-Ibhaso Legolide le-A' Design Award
Cunda Despot House Ihotele ngumphumeleli weIbhaso Legolide le-A' Design Award, ukuqatshelwa okuhlonitshwayo kakhulu okunikwa imiyilo yeklasi yokuqala, ephawulekayo nentle. Abaphumeleleyo beGolide ziimveliso ezintsha kakhulu, ezinombono ongaphaya nezikhazimlayo ezibonisa ubuchule, ubulumko nobuchule babayili bazo. Cunda Despot House Ihotele iyathenjwa ukuba ibe yimveliso edunyiswe kakhulu, ebeka umkhwa nekumgangatho wesikhumbuzo enikela ixabiso elingazange libonwe. Lo myilo uphumeleleyo weIbhaso Legolide le-A' Design Award yiprojekthi emangalisayo nehlonelwayo eluncedo kakhulu kwaye inyusa imida yobugcisa, inzululwazi, uyilo kunye nobuchwephesha. Cunda Despot House Ihotele idala iimvakalelo ezinzulu zonqweno, ivusa umdla, ikhuthaza ukuyila kwaye iyasikhwebela.
Emva Koyilo
Ikhithi Yeendaba
Iziqinisekiso, amalungu eqela kunye neenkcukacha zobugcisa ezinikezelwe ngumyili.
- Iimpawu Ezizodwa
- Despot House has been taken from its ruins and it has taken its place in the world as part of 'protection and historical continuity' within the scope of a design and application work without damaging the original texture of the historical building.
- Imilinganiselo nePakishini
- Despot House, which has hosted many functions until today, has been restored and brought to the present day with a hotel function. The existing main building and the Cistern structure serving it were re-functioned as a hotel by respecting the original materials and construction technique. Additional functions such as restaurants, spa baths and horizon pools supporting the existing structures are also considered within the building complex.
In order for the users to benefit from the services easily, a design aiming to keep the inter-connections of the functions strong is aimed.
The main building has 6 rooms on the basement, 7 rooms on the ground floor, 2 sofas and 2 terraces, and 7 rooms and a terrace on the first floor. The floors of the building are connected by a stylish wooden staircase.
The building elements that are available in the design of the 6 rooms in the basement floor and that can be used, have been cleaned and revealed. An integrated design has been created with contemporary materials. The area facing the sea front, previously used as a water tank, was reorganized and transformed into a spa room. Thus, some rooms are privatized with different qualities.
There are 7 rooms on the ground floor, two of which are suites. The king suite room on the sea front has a terrace opening to the view.
On the first floor, there are a total of 7 rooms, three of which are suites.
The restaurant structure with a capacity of approximately 150 people is designed for hotel users and non-hotel use. A lodge with a fireplace in the concept of the restaurant, indoor and outdoor eating and drinking areas with a view of the sea, and a bar section are organized. The bar in the restaurant also serves the pool users in the garden.
In the additional building complex planned to support the hotel function; there are Roman baths, massage rooms, saunas, steam rooms, shock and adventure showers. The fitness section with sports equipment is also designed in this complex. In this way, user comfort is aimed by providing the connection between the spaces. - Iithegi
- Cunda, Ayvalik, Despot House, Traditional House, Hotel, Spa, Restaurant, Restoration, Renovation.
- Ubuchwepheshe Bokuvelisa
- •Unauthentic attachments have been removed, herbaceous plants have been cleaned. All of the paints and plasters on the walls have been also cleaned by a scraper.
•Wooden floors have been completely renewed with impregnated wooden floors, rafter and purlines.
•The wooden floor coverings, which were destroyed as a result of the fire and destruction, were renewed with impregnated wooden beams and the floors were created. The wooden ladder, whose spine and steps were partially destroyed, was reconstructed in accordance with the original. The foundation of the building was reinforced by supporting curtains, jacketing was done. Roof construction and building elements were completely renewed.
•The first two floors of the building are made of garlic stone and the third floor is made of blend brick. Window and door jambs, floor moldings, garlic stones and columns were cleaned by scraper.
•The deformed building elements were renewed in accordance with the original. The destroyed wooden doors, windows and shutters were rebuilt from solid wood in accordance with the original.
•Deformed and rusted window and terrace railings were rebuilt according to the original. The wrought irons that were usable were cleaned and repaired.
•The columns carrying the terraces on the entrance and the sea front were deformed by exposure to external factors and bad weather conditions. These columns were reconstructed according to the original by using threshing brick.
•In line with the needs of the new function, the shafts of mechanical, electrical, ventilation, fire and sanitary installation were resolved in the installation galleries between the floors.
•In order not to disturb the continuity of the details and engravings on the ceilings, the wet spaces in the rooms were manufactured with a system consisting of steel and wooden structure.
•Applications for strengthening the structural system of the building were made by supporting with tie and tension rods. It was aimed to carry out a project that does not harm the originality and physical integrity of the building. - Umngeni Woyilo
- The historical building is in an important location in the region. When the reconstruction started, it was aroused excitement and curiosity by the people of the region because it was abandoned for many years. This is an important responsibility for us. The bearing system of the building, the stairs, the walls are in a very bad condition, and it has required careful work. Difficulty was reached in transportation between floors because of the stairs were destroyed. The ceiling of the ground floor was destroyed. During the construction phase, the structural system was suspended and the structural system was rebuilt. Therefore, the construction site phase is a very difficult process.
- Uphando
- When we started the project, an important historical archive research was made. because an intervention that would damage this important historical structure would be to damage its precious history. we would never want that. For every detail of the building, we reached as old photos as possible, historical information, and even old Turkish movies taken in the building. We couldn't have missed any detail.
- Inkuthazo
- This building has hosted major events in the past. The story of the house was the inspiration for us. It made us excited to bring this valuable structure, which has remained idle for many years, back to life.
- Ubude Beprojekthi
- 2018-2019 - Cunda Island,Ayvalik/Turkey
- Amalungu Eqela
- Isıl Gencoglu (Architect,PhD.)
Suleyman Tasar (Architectural Restorator)
Team members:
Basak Gencoglu (Architect,MSc)
Busra Yucel (Architect)
Gokhan Manastirli (Architectural Restorator)
Gokhan Cokcetin (Civil Engineer)
H.Kubra Simsek (Architect,MSc Student)
Okuxhasiweyo
Hlola Ngaphaya kwe-Designers.org
Fumana iimveliso, iinkonzo kunye namathuba avela kumaqabane ethu entengiso.
Okungakumbi Ongakuphonononga
Oyilo Ezinxulumeneyo
Phonononga ezinye izinto zoyilo eziwongwe ngembasa kweli candelo linye, ezikhethwe ngokwemfanelo.