跳至内容
Batlle i Roig Arquitectura 的作品 Scenic Path Along Guixeres 景观修复

设计师 Batlle i Roig Arquitectura 的作品 Scenic Path Along Guixeres 景观修复 荣获了极具声望的 2021 A' Design Award 金奖,竞赛类别为城市规划与城市设计。


金城市规划· 2021

Scenic Path Along Guixeres 景观修复

设计师: Batlle i Roig Arquitectura

客户: Batlle I Roig Arquitectura

城市规划类别A' Design Award 金奖获奖者

76,616

已验证的获奖者

验证 #118334 的获奖状态

色彩

设计作品

关于 Scenic Path Along Guixeres 景观修复

"圭赛雷斯沿线景观步道"是一条建于西班牙伊瓜拉达废弃石膏矿区之上的人行与自行车道。该步道是围绕城市规划的绿色环带的组成部分。已建成路段全长800米,占地5600平方米。三条平行带状结构塑造了整条路线:中央为宽三米的花岗岩砂路面,确保通行的连续性;外侧为宽1.2米的混凝土路面,采用发光骨料以提升夜间可视性,并结合休息区形成观景平台;内侧的植栽沟渠则用于引导雨水径流并拦截小规模滑坡土体。

荣誉认可

关于A' Design Award 金奖

Scenic Path Along Guixeres 景观修复是 A' Design Award 金奖得主,这是授予一流、绝妙而杰出设计的极为崇高的认可。金奖得主是极具创新、极富远见且璀璨夺目的创作,反映出其设计师的天才、智慧与才干。预计Scenic Path Along Guixeres 景观修复将成为一项备受赞誉、引领潮流、气势恢宏的发明,带来前所未有的价值。这件赢得 A' Design Award 金奖的设计是一个壮观而受人敬重的项目,极大地造福并拓展艺术、科学、设计和技术的边界。Scenic Path Along Guixeres 景观修复激起强烈的渴望,唤起激情,鼓励创造力,令我们着迷。

设计幕后

媒体资料包

由设计师提供的致谢、团队成员及技术详情。

独特属性
The project has two main goals: first, connectivity, achieving the continuity of this global project around the whole city (the green ring). Second, landscape and biodiversity recovery, establishing the necessary elements to generate a new dynamic on the site that will progressively improve its environmental conditions through the use of collected water. In this sense, the proposal creates a typical section with three clearly differentiated strips that adapt to the different situations of the layout, addressing the problems of the site as well as developing its potential.
尺寸与包装
5.600 sqm / 800 meters long
标签
Landscape Recovery, Pedestrian Path, Cyclable Lane, Rest Areas, Viewpoint, Architecture Landscape, Biodiversity
生产技术
The central strip, with the main 3-metre-wide granitic-sand track, guarantees the continuity of the Green Ring. The outer strip is a linear lookout overlooking the city. A 1.2-metre-wide track paved with concrete to ensure the accessibility and using luminescent aggregate to improve visibility during the evening. The layout of this linear scenic viewpoint recognises the principal existing landmarks, vegetation and trees by widening and creating rest areas. The inner strip acts as a plant ditch, to channel runoff and generates a safety strip to stop minor landslips. These same fallen rocks are used to build a sequence of retaining areas to filter and rechannel this water to new points where vegetation has been planted to colonise the place.
设计挑战
The project was born and built during the crisis, for which we had a very small budget available. We were asked just to solve a new path through that location in order to ensure the continuity of the Igualada Green Ring, but the knowledge acquired about the site and its values forced us to take the whole former gypsum mines as our scope of work. We did not want to design a project of a simple path, oblivious to everything observed and its potentials. Our desire was to recover the entire area, historically abandoned, and integrate it into the green and social infrastructure of the city.
研究
The proposal’s innovation lies in the result of this process of analysis and synthesis that concludes with the technification of conventional solutions for path construction, in order to accomplish greater performance regarding accessibility, visibility, durability and re naturalization of the environment, with an optimum cost ratio and maximum efficiency regarding environmental footprint.
灵感
The project is framed within Igualada’s Green Ring, creating a set of pedestrian and bicycle paths as a belt around the city. This new green sustainable mobility infrastructure aims at establishing a network of free spaces, apt for environmentally friendly leisure activities, adapting and recovering, to great extent, currently underused or degraded spaces. In this context, the gypsum mines path implies the adaptation of a 1,65km section, of which 800 meters have already been accomplished.
项目周期
The project, located in Igualada (next to Barcelona, Spain) started in May 2017 and finished in January 2018.
操作流程
The intervention creates a landmark visible from afar (the viewpoint) that acts as a reclamation for the whole city and encourages the use of space. Also, the path is completed with a number of small living areas strategically placed on the most privileged areas. This section of the path ends in a final observation deck cantilevering over the mountain providing a panoramic view of the Anoia and Montserrat Mountain. The project has had an exceptional reception from the citizens. They flock to stroll and practice sports in their leisure time. This has motivated the municipality to go on with additional segments of the track to continue extending this Green Path around the city.
专利
Copyrights belong to Batlle i Roig Arquitectura, 2020.
团队成员
Architect: Enric Batlle
Architect: Joan Roig
Architect: Ivan Sanchez
Architect: Mario Súñer
Architect & Landscape Architect: Livia Valentini
Agriculture Engineer & Landscape Designer: Dolors Feu
Agricultural Engineer & Environmentalist: Yago Cavaller
Building Engineer & Landscape Designer: Diana Calico
图片版权
Image #1: Photographer Jordi Surroca, Guixeres (1), 2018. Image #2: Photographer Jordi Surroca, Guixeres (2), 2018. Image #3: Photographer Jordi Surroca, Guixeres (3), 2018. Image #4: Photographer Jordi Surroca, Guixeres (4), 2018. Image #5: Photographer Jordi Surroca, Guixeres (5), 2018.
Video Credits: Stupendastic Films

赞助内容

探索 Designers.org 之外

发现来自我们广告合作伙伴的产品、服务和机会。

优秀设计值得卓越认可

A' 设计奖是一项国际性的专业评审荣誉,旨在表彰优秀设计。参加 A' 设计奖,获得凭实力赢得认可的机会,为您的作品赢得声誉、荣耀和曝光。提名您的作品参加 A' 设计奖,角逐令人瞩目的 A' 设计大奖。

立即提名