关于 B73 Apartments 住宅建筑
B73 以其创新的外观、高端的材料使用和执行质量融入了环境。每层楼均由一间公寓组成。 B73 是该国极少数使用固体表面材料和热成型技术实现复杂 3D 形状的建筑之一。立面的形态始于一个表面,该表面通过战略性切割进行拉伸。发生中断,形成燕子鸟的形状。底层大堂设有灯光艺术装置。
荣誉认可
关于A' Design Award 铜奖
B73 Apartments 住宅建筑是 A' Design Award 铜奖得主,这是授予以创造力、独创性和敏锐见长的杰出设计的极具声望的认可。铜奖得主是技艺娴熟、创意惊人的作品,印证了其设计师丰富的经验、想象力与机智。预计B73 Apartments 住宅建筑将成为一件备受推崇、令人钦佩且被珍爱的物品,兼具显著的专业性与创新性。这件赢得 A' Design Award 铜奖的设计融入艺术、科学、设计和技术领域的最佳实践,并因注重细节而出类拔萃。B73 Apartments 住宅建筑出色地满足需求,触动渴望,迷住情感,并吸引好奇心。
设计幕后
媒体资料包
由设计师提供的致谢、团队成员及技术详情。
- 独特属性
- B73 stands out in the urban context with its innovative and impactful look, having high-end material usage and exceptional quality in execution. Each residential floor comprises of just a single apartment.
B73 is one of the very few buildings in Bulgaria using solid surface material and thermoforming for complex 3D shapes. The concept of the facade starts from a simple surface that is stretched with strategically placed cuts. A discontinuation occurs creating the shape of a swallow bird.
The building's lobby hosts a uniquely designed light art installation specially for this space, being one of a kind in Eastern Europe. - 尺寸与包装
- 26-meters high, the building has 6 floors over ground and 2 underground ones. Total built-up area is 2,100 sqm.
- 标签
- Thermoforming, Solid Surface, Innovation, Technology, Residential, 3D, Premium, Facade, Light Installation
- 生产技术
- The complete building envelope and facade design are achieved through using acrylic stone material and thermoforming. It was needed to work with three different softwares in order to achieve the 3D bending of most of the elements, so they could be molded afterwards.
The building lobby hosts a uniquely designed light art installation specially for the space, being one of a kind in Eastern Europe. - 设计挑战
- The biggest challenge was to meet all investor's expectations for high quality execution. The whole process required precision on every step together with well managed synchronization between contractors.
- 研究
- Having a busy boulevard, difference of heights and public and private buildings in the area, plus, non-homogeneous architectural language, makes inserting a new addition difficult. Instead, the approach was to elevate the quality of design and materials of the existing context, by inserting a well-executed gem.
- 灵感
- The strongest motivation for this project came with the investor themselves and their will to create an outstanding building that has no compromises on every level. This provided us with almost limitless creative freedom. Afterwards, we succeeded to fully realize our design by using our previous experience with the innovative solid surface material. Organic forms and an overall white look come natural for us in our design.
- 项目周期
- The design phase of the project started in 2018 and the building was completed in April 2021.
- 操作流程
- The interaction with the building fitting in the context is immediate. The diverse surrounding of materials, colors, heights, building state and shapes makes B73 pop out. Laying out a distinctive architectural line in the context benefits the neighborhood while changing the urban mood and perception.
- 专利
- Copyrights belong to STARH, 2021
- 团队成员
- Svetoslav Stanislavov - Leading architect
Dimitar Katsarov
Iva Kostova
Radostina Petkova
Petar Nikolov
Hristo Dushev
Borislav Stanchev
Zhenia Atanasova
Georgi Pasev
Ivan Kovachev
Vladimir Kavaev
Debora Dimitrova
Sanya Kovacheva
Desislava Georgieva - 图片版权
- Photographer Dian Stanchev
赞助内容
探索 Designers.org 之外
发现来自我们广告合作伙伴的产品、服务和机会。
探索更多
相关设计
探索同类别中更多按优秀程度甄选的获奖设计。