Skip to content
Entry Building to Sberbank 入口大楼 by Evolution Design
Entry Building to Sberbank 入口大楼 by Evolution Design
Entry Building to Sberbank 入口大楼 by Evolution Design
Entry Building to Sberbank 入口大楼 by Evolution Design
Entry Building to Sberbank 入口大楼 by Evolution Design

金 建筑 · 2022

Entry Building to Sberbank 入口大楼

by Evolution Design

  • A' Design Award 金奖 2022 in 建筑
  • CLIENT: Sberbank
  • Estimated Number of Design Views: 33,245
  • Verification code E2ABCE5723 · Verify this award
Email this page

Colors

About Entry Building to Sberbank 入口大楼

俄罗斯联邦储蓄银行入口大楼是为莫斯科两座相邻的高层办公塔楼所设计的入口建筑。该建筑以双曲抛物面形态围合两塔之间的空间,由29榀钢拱构成,上覆玻璃三角网格屋面。这一造型将自然光引入室内,同时尽量减少对下部办公楼层采光的遮挡。三个楼层设有接待区、餐厅、咖啡厅、会议中心以及呈阶梯式圆形剧场造型的活动空间。建筑两端均以香槟色不锈钢板饰面收头。

About the A' Design Award 金奖

Entry Building to Sberbank 入口大楼是 A' Design Award 金奖得主,这是授予一流、绝妙而杰出设计的极为崇高的认可。金奖得主是极具创新、极富远见且璀璨夺目的创作,反映出其设计师的天才、智慧与才干。预计Entry Building to Sberbank 入口大楼将成为一项备受赞誉、引领潮流、气势恢宏的发明,带来前所未有的价值。这件赢得 A' Design Award 金奖的设计是一个壮观而受人敬重的项目,极大地造福并拓展艺术、科学、设计和技术的边界。Entry Building to Sberbank 入口大楼激起强烈的渴望,唤起激情,鼓励创造力,令我们着迷。

Press Kit

Unique Properties
Both entrances at either end of the building are crowned in a series of champagne-coloured triangulated panels in stainless steel that incline outwards over the squares, like delicate tiaras. These warm-coloured crowns create playful reflections of pedestrians arriving and leaving the towers and glow up in different shades depending on the daylight. Internally, the fully glazed dynamic shape creates interiors with an al fresco vibe that merges indoor and outdoor spaces seamlessly.
Dimensions & Packaging
The building consists of three floors with the total floor area of 4000 square meters or 43055 square foot and 40000 cubic meters of built volume. The building is 83 meters long, 43 meters wide, with steel arches reaching 24 meters at the highest point and 20 meters at the lowest point.
Tags
Sberbank City, entrance building, Moscow, hyperbolic parabolic, Evolution Design, Tanya Ruegg
Production Technology
The hyperbolic parabolic form is achieved with the construction of 29 steel arches that increase the height towards either end of the building. The column free space is covered by a glazed roof that consists of an intricate triangulated structure. The first and second floors are made of concrete slabs, with the middle level designed as a dynamic curved shape that delivers two restaurant terraces facing the front entrance. An oval opening in the core of the building also connects all floors.
Design Challenge
The primary project challenge was creating a building volume large enough to accommodate all the required functions under one roof, without compromising daylight into the lower levels of the towers. The dynamic saddle form that the architects devised solves both challenges. A representative, spacious and daylight-flooded space has been created that accommodates all the necessary functions, while minimising sunlight obstruction to the offices in the towers.
Research
As the primary function of the building is as a covered entrance space into the two towers, particular attention was paid to finding the best solution for an efficient and comfortable flow of 10000 people who work in the towers. The solution was spreading the badge scanner areas over two floors, in order to split the flow, and strategically placing the main canteen restaurant on the first floor, leaving the ground floor for event and conference areas that can be accessed by the general public.
Inspiration
Sberbank commissioned Evolution Design to create a representative entrance to two adjoining high-rise towers that are part of Sberbank City, the new campus of Sberbank. The intervention should link the two towers and create a strong design statement within the narrow space, without compromising daylight into the lower levels of the towers. The architects responded to the ambitious brief with a hyperbolic parabolic form that rises up at either end enclosing the space between the towers.
Project Duration
Project construction started in July 2020 and was finished in June 2021 in Moscow.
Operation Flow
Spread over 3 floors, the building accommodates entrance facilities for people who work in the towers, central reception, several restaurants and coffee shops, a conference centre and a large event space styled as a stepped amphitheatre. The building is not only frequented by 10000 employees who work in the two towers as an entry, meeting and socialising place, but is also a popular choice to meet for lunch among workers from other buildings on the campus, and is also open to the general public.
Patents
Copyrights belong to Evolution Design, 2022
Image Credits
Image #1: Photographer Peter Wuermli, 2022. Image #2: Photographer Peter Wuermli, 2022. Image #3: Photographer Peter Wuermli, 2022. Image #4: Photographer Peter Wuermli, 2022. Image #5: Photographer Ilya Ivanov, 2022.