设计师 A Tasarim Architect 的作品 Armada 3 综合体建筑 荣获了极具声望的 2026 A' Design Award 银奖,竞赛类别为建筑与结构设计。
银建筑· 2026
Armada 3 综合体建筑
设计师: A Tasarim Architect
客户: A Tasarım Architect
建筑类别A' Design Award 银奖获奖者
已验证的获奖者
验证 #182214 的获奖状态设计作品
关于 Armada 3 综合体建筑
Armada 3 是位于土耳其安卡拉的一座综合体建筑。该建筑在多个地上楼层中融合了高端零售、餐饮空间与办公空间,建筑面积约21,000平方米。多个方向设置的入口以及街道式的室内动线,使整个建筑群向城市开放。退台式露台与自遮阳几何形体有助于遮阳控制与自然采光。钢筋混凝土柱网体系使单元面积灵活可变,并便于未来重新布局。立面采用高性能玻璃幕墙、保温板材与金属饰面板。
荣誉认可
关于A' Design Award 银奖
Armada 3 综合体建筑是 A' Design Award 银奖得主,这是授予顶级、华美而令人印象深刻的设计的极为崇高的认可。银奖得主是极其卓越、极具创造力的作品,展现出其设计师杰出的专业技能、才华与敏锐。预计Armada 3 综合体建筑将成为一件出色的典范之作,兼具非凡的专业性与深刻的创新性。这件赢得 A' Design Award 银奖的设计是一项备受瞩目、令人钦佩的发明,造福并拓展艺术、科学、设计和技术的边界。Armada 3 综合体建筑是一件令人羡慕的创作,它唤起渴望,带来积极的情感,并激发惊叹与赞叹。
设计幕后
媒体资料包
由设计师提供的致谢、团队成员及技术详情。
- 独特属性
- Armada 3 operates as an urban connector rather than a closed commercial object. Its uniqueness lies in transforming a conventional mixed-use development into a piece of civic infrastructure that stitches together pedestrian flows, transportation networks, and public life.
- 尺寸与包装
- Construction area of approximately 21,000 square meters, organized in multiple above-ground levels with integrated terraces and semi-open public platforms. Regular reinforced concrete column grid allows flexible unit sizing and future reconfiguration. Step-back massing optimizes solar control and daylight performance. Mixed-use program includes upper-segment retail, gastronomy areas, and office spaces, supported by integrated vertical circulation, service cores, and environmental performance strategies suitable for dense urban conditions.
- 标签
- Urban Integration, Mixed-Use Architecture,Retail Architecture, Public Space, Permeable Façade, Climate-Responsive Design, Urban Continuity,
- 生产技术
- The project is realized through a reinforced concrete structural system with a regular column grid, enabling modular flexibility and long-term adaptability. The façade combines high-performance glazing, opaque insulated panels, and metal cladding, supported by passive environmental strategies such as step-back terraces and self-shading geometries. Landscape elements, integrated lighting, and durable urban materials reinforce both climatic performance and public use.
- 设计挑战
- The primary challenge was to transform a conventional retail-led mixed-use program into an open, adaptable urban system without losing commercial viability. The project had to reconcile large-scale architectural presence with human-scale experience, integrate public circulation with private program, and respond to climate and daylight constraints. Balancing permeability, environmental performance, and long-term flexibility within a dense metropolitan context defined the core research and design challenge.
- 研究
- This project investigates how large-scale commercial architecture can function as civic infrastructure within a metropolitan context. Through spatial continuity, environmental responsiveness, and mixed-use integration, the research explores permeability, adaptability, and urban connectivity as design drivers. Armada 3 serves as a case study demonstrating how contemporary retail-led developments can evolve into flexible urban frameworks that support public life, mobility, and long-term resilience rather than operating as isolated building objects.
- 灵感
- The project was inspired by the need to reinterpret the shopping mall as an active component of urban infrastructure rather than an isolated object. Research into urban permeability, mixed-use hybridity, climate-responsive envelopes, and evolving retail behaviors informed a design approach that integrates civic space, environmental performance, and long-term spatial adaptability within a dense metropolitan context.
- 项目周期
- 2023–2027, Ankara, Turkey
- 操作流程
- The building works by staying open to the city. People can enter from multiple sides, move naturally along a street-like interior, and shift easily between indoor and outdoor spaces. Terraces, passages, and transparent façades guide movement, bring in light, and invite public use, allowing the project to adapt smoothly to daily urban life rather than controlling it.
- 团队成员
- Architectural Design Team: Ali Osman Ozturk, Canan Arslan, Niyazi Ayvaz, Kutlay Batur, Pelin Oztoklu, Sinan Ozkan, Gokçe Sahin, Mina Nur Uraloglu Duman, Mehmet Ozturk, Cuneyt Ozturk, Zeynep Yıldırım, Idil Erkan, Hasan Yigit Sari, Ilayda Ozturk
Project Date: 2023-
Construction Area: 21,000 square meters
Location: Ankara
Structural Design: High Level Project
Mechanical Design: Protes Engineering
Electrical Design: Akay Engineering
Landscape Design: Promim
Fire Consultant: Karina
Construction Application Coordinator: Sonay Ozar
Contractor: Sogutozu Construction
3D Visualization: Libra Frank
赞助内容
探索 Designers.org 之外
发现来自我们广告合作伙伴的产品、服务和机会。
探索更多
相关设计
探索同类别中更多按优秀程度甄选的获奖设计。