Jobcenter Berlin 行政大樓 by Elisabeth Ruthnick is a highly esteemed winner of the very prestigious 2022 A' Design Award 鐵獎 in 建築、樓宇及結構設計 Competition Category.
鐵建築· 2022
Jobcenter Berlin 行政大樓
A' Design Award 鐵獎 Winner in 建築 Category
Verified Award Winner
Verify Award Status for #138576The Design
About Jobcenter Berlin 行政大樓
柏林就業中心係德國柏林嘅一座行政大樓,由博內曼大廈改建而成,該建築原本係市政廳喺1960年代嘅擴建部分。呢座被列為古蹟嘅建築物已按現行結構、能源同消防安全標準進行翻新,並根據新使用者嘅需求調整咗樓層平面佈局。經水洗處理嘅混凝土板同窗戶構件按照原設計進行更新,並得到古蹟保護部門嘅同意。走廊入面嘅清水磚牆亦已修復同清潔。新嘅色彩概念貫穿公共區域同走廊空間。
The Recognition
About the A' Design Award 鐵獎
Jobcenter Berlin 行政大樓是 A' Design Award 鐵獎得主,這是授予滿足人們對設計精良的創作所期待的專業與工業要求的優良設計的聲望認可。鐵獎得主展現出其創作者的高超技藝、高度專業化、專家級的理解力和創造能力。預計Jobcenter Berlin 行政大樓將成為一件備受推崇、令人欽佩且被珍愛的創作,既實用又創新。這件贏得 A' Design Award 鐵獎的設計整合了行業最佳實踐,並擁有與專業知識和才華相結合的稱職技術特性。Jobcenter Berlin 行政大樓因其嚴謹而受到尊重,旨在提供有助於讓世界變得更美好的生活品質改善。
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era. - Dimensions & Packaging
- GFA: 8,908 square meter
GBV: 33,198 cubic meter - Tags
- High-rise, Post-war modern era, Refurbishment
- Production Technology
- When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
- Design Challenge
- A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
- Research
- The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
- Inspiration
- Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
- Project Duration
- Realization: 2013-2018
Location: Berlin, Germany - Operation Flow
- The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors. - Team Members
- Frank Anacker, Sylvia Wallau, Sabine Hadrossek
- Image Credits
- Andreas Meichsner, Berlin
Kevin Fuchs, Berlin
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.