Skip to content
Tobb Technopark Campus 科技園區 by A Tasarim Architect

Tobb Technopark Campus 科技園區 by A Tasarim Architect is a highly esteemed winner of the very prestigious 2026 A' Design Award 銀獎 in 房地產設計 Competition Category.


銀房地產· 2026

Tobb Technopark Campus 科技園區

by A Tasarim Architect

Client: A Tasarim Mimarlik

A' Design Award 銀獎 Winner in 房地產 Category

Colors

Email this page

The Design

About Tobb Technopark Campus 科技園區

Tobb科技園區係一個研究開發綜合體,位於安卡拉Tobb Etu校園之內。設計由兩座大樓組成,喺地面層透過中央中庭連接,並經地庫層貫通。實驗室、工作坊、停車場同技術空間設於地庫各層,而上層就係靈活嘅研究開發空間。五個出入口設喺唔同水平,方便喺傾斜嘅場地上通行。整體佈局將工作空間朝向日光同毗鄰嘅城市公園開放,促進交流同知識共享。

The Recognition

About the A' Design Award 銀獎

Tobb Technopark Campus 科技園區是 A' Design Award 銀獎得主,這是授予頂級、華美而令人印象深刻的設計的極為崇高的認可。銀獎得主是極其卓越、極具創造力的作品,展現出其設計師傑出的專業技能、才華與敏銳。預計Tobb Technopark Campus 科技園區將成為一件出色的典範之作,兼具非凡的專業性與深刻的創新性。這件贏得 A' Design Award 銀獎的設計是一項備受矚目、令人欽佩的發明,造福並拓展藝術、科學、設計和技術的界限。Tobb Technopark Campus 科技園區是一件令人羨慕的創作,它喚起渴望,帶來積極的情感,並激發驚嘆與讚嘆。

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The project is conceived as an integrated and adaptive system that supports continuous knowledge production, innovation and collaboration. It is defined by a clear and rational spatial organization, flexibility for future expansion, and a strong emphasis on sustainability and user-oriented functionality. The design balances technical efficiency with spatial quality, creating an environment that encourages creativity, interaction and high-performance research and development activities. Through its adaptable structure and efficient planning approach, the project responds to evolving technological needs while maintaining a cohesive and accessible architectural identity.
Dimensions & Packaging
The Tobb Etu Technopark is developed on a 30,000 sqm site and consists of two basement levels, a ground floor accessible from three different elevations, and six upper floors. The project is organized into two main blocks, Block A and Block B, which are interconnected through a central atrium at ground level and through the basement levels. Each block has a typical floor plate of approximately 4,000 sqm, resulting in a total gross construction area of 120,000 sqm. The basement levels accommodate laboratories, workshops, parking and technical spaces, with a clear height of 6.00 meters, while the upper floors dedicated to R&D functions have a floor height of 4.20 meters.
Tags
Research and Development, Technopark, Innovation, Courtyard, Landscape, Office, Laboratory, Campus
Production Technology
During the design of the Tobb Etu Technopark, comprehensive site analyses were conducted, taking into account topography, elevation differences, surrounding transportation networks, and pedestrian and vehicular circulation. A continuous ring road was introduced within the campus to provide access to all façades for both vehicles and pedestrians, while multiple entry points were defined at different levels to ensure seamless connectivity. Five main entrances were strategically positioned to facilitate clear and efficient access to the building. Vertical circulation systems were designed to enable the movement of users, materials, and service functions across all floors. The project establishes a strong relationship with the adjacent 30 Agustos City Park, allowing direct access from ground-level spaces and orienting work environments toward the landscape.
Design Challenge
The primary challenge of the design process was to achieve a coherent integration between a large-scale, high-density technopark program and the site’s complex physical and contextual conditions. The project required balancing advanced technological infrastructure with environmental sensitivity, while responding to significant topographical variations and multi-level access requirements.

Internally, the challenge involved aligning the evolving needs of research, innovation and flexible work environments with the academic and social character of the university campus. Externally, zoning regulations, laboratory requirements, construction constraints and multidisciplinary coordination played a critical role in shaping the design decisions. Addressing these conditions required an iterative and research-driven approach, combining spatial flexibility, efficient circulation strategies and sustainable design principles to create an adaptable and future-oriented environment.
Research
This study presents the design and development process of the Tobb Etu Technopark, a 120,000 sqm science and technology facility located within the Tobb Etu Campus in Ankara. Conceived as a nature-integrated innovation environment, the project establishes a continuous relationship between the built form and the adjacent 30 Agustos City Park, promoting user well-being, creativity, and a collaborative research culture.

Comprehensive site analyses, including topography, multi-level access strategies, and pedestrian–vehicular circulation, informed the spatial organization. The development consists of two interconnected blocks structured around a central atrium, with flexible floor plates designed to accommodate R&D centers, laboratories, and workshops. High-clearance basement levels support technical and laboratory functions, while vertically integrated circulation systems enable efficient movement of people, materials, and services.

The study demonstrates how integrated planning, environmental sensitivity, and infrastructural flexibility can collectively support continuous knowledge production and innovation within contemporary technopark design.
Inspiration
The inspiration behind the design is the idea of creating a technology-focused environment integrated with nature. The project aims to establish a balanced and continuous relationship between the built environment and the natural landscape. Natural light, green spaces and open areas are considered integral components of the design, fostering an atmosphere that enhances creativity, productivity and interaction. The design follows a holistic approach that addresses both technological advancement and environmental sensitivity, encouraging innovation through a strong connection between users, space and nature.
Project Duration
The project, with a total construction area of 120,000 sqm on a 30,000 sqm site, is located within the Tobb Etu Campus in Yenimahalle, Ankara. The design process commenced on 21 February 2025 and was completed on 9 September 2025.
Operation Flow
The project was developed through an intensive and collaborative design process involving a multidisciplinary team of approximately 50 professionals, including consultants. The spatial organization supports clear and efficient circulation, enabling smooth interaction between different functional areas. The layout promotes accessibility, connectivity and user engagement, allowing seamless movement across the building while encouraging collaboration and knowledge exchange.
Team Members
Architect : Ali Osman Ozturk,
Civil Engineer : Ibrahim Ozturk
Mechanical Enginner : Hakan Filinte
Electrical Engineer : Ezgi Ozkan Durmuslar
Landscape Architect : Elif Akay
Infrastructure : Murat Pekdagli

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate