Daebong-dong Commercial Skip Floor 商業咖啡館 by Junghee Lee is a highly esteemed winner of the very prestigious 2018 A' Design Award 銀獎 in 建築、樓宇及結構設計 Competition Category.
銀建築· 2018
Daebong-dong Commercial Skip Floor 商業咖啡館
by Junghee Lee
Client: 2m2 Architects
A' Design Award 銀獎 Winner in 建築 Category
Verified Award Winner
Verify Award Status for #64476The Design
About Daebong-dong Commercial Skip Floor 商業咖啡館
李正熙試圖將一個大的地板空間分成幾個小空間。為此,建築師將基本方向定為跳層,本來是一座兩層樓的建築,但實際上變成了一個四層樓的空間,一直到屋頂的外甲板。同一層樓,中間暴露出裸露的混凝土牆,將其再次分成兩部分。地板和天花板飾面產生對比效果。此外,透過安裝天窗,白天自然光可以進入房間。
The Recognition
About the A' Design Award 銀獎
Daebong-dong Commercial Skip Floor 商業咖啡館是 A' Design Award 銀獎得主,這是授予頂級、華美而令人印象深刻的設計的極為崇高的認可。銀獎得主是極其卓越、極具創造力的作品,展現出其設計師傑出的專業技能、才華與敏銳。預計Daebong-dong Commercial Skip Floor 商業咖啡館將成為一件出色的典範之作,兼具非凡的專業性與深刻的創新性。這件贏得 A' Design Award 銀獎的設計是一項備受矚目、令人欽佩的發明,造福並拓展藝術、科學、設計和技術的界限。Daebong-dong Commercial Skip Floor 商業咖啡館是一件令人羨慕的創作,它喚起渴望,帶來積極的情感,並激發驚嘆與讚嘆。
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- We tried to divide a large floor space into several small spaces. For this purpose, we set the basic direction as a skip floor, and it is a two-story building, but it actually became a space of four floors up to the outside deck on the roof. On the same floor, exposed concrete wall was exposed in the middle and divided it into two parts again.
- Dimensions & Packaging
- Gross floor area: 209.87㎡
- Tags
- 2m2 architects, skip floor, exposed concrete, wood louver
- Production Technology
- pine-wood exposed concrete
red cedar
low e glass - Design Challenge
- making wooden louver folding door
- Research
- Architectural structural solution
- Inspiration
- The site where the project was carried out is Daegu City which is located on the side road of the old section of the city. In 2010, as the singer Kim Gwangseok's streets were built around, it became a popular neighborhood where many young people visited on the weekends.
we designed a building that does not stand out too much compared to the neighboring buildings, but has its distinct features and can be combined with the neighborhood atmosphere with 1/3 of the legal maximum possible size. - Project Duration
- Design period: Jun.2014-Aug.2014
Construction period: Nov.2014-Apr.2015
Location: Daegu, South Korea - Operation Flow
- skip floor
exposed concrete
wooden louver - Image Credits
- photographed by Shin Kyungsub
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.