Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh by Piotr Pyrtek is a highly esteemed winner of the very prestigious 2023 Duais Iarainn A' Design Award in Dealbhadh Àiteachan Taobh a-staigh agus Taisbeanaidh Competition Category.
IarannTaobh a-staigh· 2023
Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh
by Piotr Pyrtek
Client: Ekotektura
Duais Iarainn A' Design Award Winner in Taobh a-staigh Category
- 10,926
- Verified Award Winner
- Verify Award Status for #149399
The Design
About Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh
Is e taobh a-staigh taigh-tasgaidh a chaidh a chruthachadh am broinn hangar itealain eachdraidheil a th' ann an Ath-nuadhachadh an Hangair. Tha an taigh-tasgaidh a' taisbeanadh innleadaireachd is teicneòlas, agus tha an t-àite cuideachd a' cumail thachartasan is thaisbeanaidhean. Tha na h-eileamaidean taobh a-staigh ùra a' leantainn stoidhle gnìomhachais a tha ceangailte ri cleachdadh tùsail an hangair. Tha meadhan-lobhta le structar cliath fosgailte air a thogail trì meatairean os cionn an làir. Tha am meadhan-lobhta air a shuidheachadh air falbh bho na ballachan a-muigh gus an togalach thùsail a ghleidheadh. Thathas a' cleachdadh stàilinn, breige, saimeant is fiodha. Tha na seann stòbhaichean-teasachaidh agus an suidheachadh aca air an ath-nuadhachadh agus air an sealltainn do luchd-tadhail.
The Recognition
About the Duais Iarainn A' Design Award
Tha Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh air Duais Iarainn A' Design Award a bhuannachadh, aithneachadh urramach a bheirear do dhealbhaidhean math a choinnicheas ris na riatanasan proifeiseanta is gnìomhachais a thathar a' sùileachadh bho chruthachaidhean a chaidh an dealbhadh gu math. Tha buannaichean Iarainn a' nochdadh sgil mhòr, speisealachadh àrd, tuigse eòlaiche agus comas cruthachail an luchd-cruthachaidh. Thathar an dùil gum bi Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh na chruthachadh air a bheil mòran meas, ion-mholta agus gràdhach a tha practaigeach agus ùr-ghnàthach. Tha an dealbhadh seo a bhuannaich Duais Iarainn A' Design Award a' cur nan cleachdaidhean as fheàrr sa ghnìomhachas còmhla agus tha feartan teignigeach comasach aige ceangailte ri eòlas-dèanamh agus tàlant. Tha meas air Hangar Renovation Dealbhadh Taobh a-staigh Taigh-tasgaidh airson a dhùrachd agus chaidh a dhealbhadh gus leasachaidhean càileachd beatha a thoirt seachad a chuidicheas le bhith a' dèanamh an t-saoghail na àite nas fheàrr.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The very design of the new interior elements has been kept in the industrial convention, which is directly associated with the original function of the Hangar. The designed mezzanine is nothing more than a bridge structure, whose expressive lattice structure catches the eye. Elevated 3m above the ground, the mezzanine was deliberately erected at a certain distance from the building's exterior walls, so as to preserve as much of the building's originality as possible.
- Dimensions & Packaging
- Historic aircraft hangar:
- Designed building area - 2312.39 m2
- Building height - hangar - 10.52m
- Width of the hangar building - 40,64m
- Length of the hangar building - 66,88m
- Number of above-ground floors - 1
- Number of underground floors - hangar - 1
- Volume of the hangar - 21.096 m3
Boiler room:
- Designed building area - 185,88 m2
- Building height - 7.31m
- Building width - 9.50m
- Length of the building - 19.50m
- Number of above-ground floors - 1
- Number of underground floors - 1
- Cubic capacity - 991.6 m3 - Tags
- Hangar, Hangar Czyżyny, Hangar Kraków, Hangar MiT, Hangar museum
- Production Technology
- During the design process, we placed great emphasis on period materials, mainly because the project largely involved reconstruction, or reproduction of the original character. Also when creating new elements, we tried to use materials that could have been used almost a century ago - steel, brick, concrete, wood. Even though the design of some of the interior elements seems to be contemporary, the materials used in producing them are definitely classic.
- Design Challenge
- The most difficult part of the project was combining the historical elements of the hangar with the new elements, which had to be stylistically adapted to each other due to their contemporary nature and technical requirements.
- Research
- The project was preceded by an in-depth architectural study of historical studies of this particular hangar, but also of other hangars from this period. Also, extensive research of the city archives helped to establish the final design guidelines and to proceed with the development of the documentation. All new elements that emerged at the concept stage and later in the construction project resulted directly or indirectly from the research. The entire study was agreed on an ongoing basis with the City Historic Preservation Officer and under his strict protection.
- Inspiration
- The historic aircraft hangar has been converted into a museum of engineering and technology. The interior has been maintained in the chrakter of the era, and the created space will be ideal for both the exposition of automotive objects, but also for the organization of various events and spectacles, as was the case at the last Sacrum Profanum in Krakow.
- Project Duration
- The project will begin in December 2017 and end in 2019. Construction continued until mid-2022.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.