Ɛeddi ɣer ugbur
Songpingshan Tanezduɣt n Times sɣur Suiadr

Songpingshan Tanezduɣt n Times sɣur Suiadr d anerbaz yettwaqadren meqqren n 2023 Tarbaḥt A' Design Award n Lbrunz deg Taggayt n Tnaflit n Afeṣṣel n Tansekta, Lebni d Teɣssa.


LbrunzTansekta· 2023

Songpingshan Tanezduɣt n Times

sɣur Suiadr

Amsaɣ: Suiadr

Anerbaz n Tarbaḥt A' Design Award n Lbrunz deg Taggayt n Tansekta

12,616

Anerbaz n Urraz Yettwasenqden

Senqed Addad n Urraz i #146958

Initen

Afeṣṣel

Ɣef Songpingshan Tanezduɣt n Times

Songpingshan d tanezduɣt n times deg Shenzhen, di Ccinwa. Tanezduɣt-agi n Uswir 1 tesɛa tamurt n 3,660.1 imétrat imrabaɛen d tuzzert n uɣlaf ummid n 5,791.64 iméterat imrabaɛen, tzemer ad tesseḥbes sebɛa n lkamyunat n times. Asagem n uqcic agejdan yeɣleq-d ccetla n uɛeggu i d-ițțasen seg ubrid ameqran ɣer tama n usammer. Agarabu n lkamyunat n times, tqubet n ukcum, ccbaḥ akked texxamt n taywalt ttusersen deg wemkan amezwaru. Ixxamen n uheggi n lxedma, ixxamen n ccɣel akked ixxamen ineggura ttɣimin deg wemkan yellan sennig. Iberdan n inebgawen țɛeddin s webrid n ugaru agejdan, ihi iberdan n uɣerbaz uslig d wemgired n lxedma n wass ur ttwaxelḍen ara.

Asmekti

Ɣef Tarbaḥt A' Design Award n Lbrunz

Songpingshan Tanezduɣt n Times d amerbaḥ n Tarbaḥt A' Design Award n Lbrunz, tagmat ɛlayen i yisnulfa yelhan, yeṭṭafaren tinawt, tamusni d tezmert. Imerbaḥen n Lbrunz d isnulfa yelhan, ttbanen d timusniwin n tmusni n yimahilen-nsen. Songpingshan Tanezduɣt n Times ad yili d asnulfu yettwaɛezzen, yelhan, amaynut. Songpingshan Tanezduɣt n Times yettemlil ɣef yimawlan, yettwaɛezzen s tmahilt-is.

Deffir n ufeṣṣel

Tagrurt n tɣamsa

Ismawen n terbaɛt, iferdisen itiknikanen akked telɣut i d-yefka umeṣṣufeɣ.

Taɣara Tasuft
The main entrance and exit is set at the southeast corner of the site, through which firefighters and visitors enter the fire station. The fire garage faces the square. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F. Basement mainly accommodates equipment rooms. Multiple rest platforms are arranged to enrich the lives of firefighters.
Tigejdiwin & Akemmus
The project is a Grade-1 fire station with a plot area of 3,660.1 square meters and a gross floor area of 5,791.64 square meters, which can accommodate 7 fire trucks. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F.
Tibzimin
Inner courtyard-style layout, Grade-1 fire station, Special set-back line, Overlapping circulation routes, Shading structure, Green design, Sponge city technologies
Tasnakta n Ufares
The forms of each building feature a simple style and the building bodies have reasonable coefficient. The window-to-wall ratio and the area of curtain wall and external window meet relevant regulations and requirements. Each building is designed based on facades and adopts shading structure.
Green architecture and sponge city technologies are applied to roof fruit garden. Concave green area is set for rainwater absorption, storage and seepage, controlling the rainwater runoff within the site.
Asewḥel n Usnulfu
Limited land area: The building set-back lines cannot be fully in accordance with the requirements of Shenzhen local regulations. After several times of negotiations with the planning bureau about set-back lines, the design team reached a reasonable bargain: the plot is set back at least 1.0m on the east side, 2.3m on the south side, 38.1m on the west side, and at least 8.15m on the north side. In this way, the fire station and the sports field are reasonably arranged within the limited land.
Anadi
Due to the Songpingshan Gas Vaporizing Station on the northwest corner, the building should be set back for 50m according to relevant regulations, which has a great impact on the spatial layout. On the basis of satisfying the requirements of set-back line, the design creates a curved screen wall to unfold a "dialogue" with the gas vaporizing station.
In response to the serious noise interference from Beihuan Avenue on the north, the project adopts an inner courtyard-style layout.
Aseḥbiber
The project is designed according to the research results of "2014 Shenzhen Fire Station Standardization Design Workshop". The experience of this project will be utilized to establish construction standards on fire stations in Shenzhen, so as to satisfy the requirements of building more fire stations and provide a reference for domestic fire station constructions.
Tanzagt n Usenfar
The project started in September 2016 and finished in December 2019 at the intersection of Baoshen Road and Keyuan Road, Nanshan District in Shenzhen, China.
Tanila n Umahil
Fire trucks leave the station via an exit nearby the street, greatly improving response efficiency.
Overlapping circulation routes: Public participation is encouraged. Visiting areas open for citizens are mainly organized on 1F and mezzanine. Visitors' circulation routes pass through the mezzanine corridor, without affecting the internal daily training and duty circulation routes of firefighters.
Igmamen n Terbaɛt
Zhong Zhong
Zhong Botao
Ma Ying
Wei Qijing
Zhang Zilu
Wang Min
Yong Yong
Xiong Feng
Wu Zirong
He Xiaoming
Liu Mu
Tang Jin
Imsuren n Tugniwin
Inter_mountain

Yettwaxellṣen

Snirem Seld Designers.org

Af-d iferdisen, imeẓla d tegnatin sɣur yimɛawnen-nneɣ n usissen.

Asnulfu Yelhan Yesra Asekṛes Ameqqran

Arraz A' n Usnulfu d arraz agraɣlan, yettusneqden sɣur uɣref, i usnulfu yelhan. Ttekki deg Urraz A' n Usnulfu akken ad tesɛuḍ tagnit n usekṛes imeritukratik, ad tawiḍ aẓayer, ameqqer d usissen i umahil-ik. Sumer amahil-ik i Urraz A' n Usnulfu akken ad tnafseḍ s Ulamek A' n Usnulfu.

Sumer